= LCGT Auxiliary Optics System (AOS) = ## page was renamed from LCGT/subgroup/AOS
{{attachment:AOStitle.png}}
= KAGRA
Auxiliary Optics System (AOS) =
Line 6: Line 8:
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.  . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.
Line 9: Line 11:
Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.
 . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
 . Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.
Line 15: Line 17:
||[[LCGT/SVN|LCGT SVN]] ||[[LCGT/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]|| ||[[LCGT/SVN|LCGT SVN]] ||[[KAGRA/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]||
||[[LCGT/Meeting/RoadMap | Roadmap]] || ||
Line 19: Line 22:
  * <!> Including beam baffles, output Faraday isolators, and calculation of BRDF of test masses...
Line 22: Line 24:
  * <!> Optical lever is a kind of local sensors, but unlike other local sensors, it requires long beam lines as lever's arms, thus this should be considerd in AOS.
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO is in charge of.)
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources (CCD Monitors or equivalent)]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]]
Line 27: Line 27:
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Mode Profiler]]
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
 * Other local sensors/monitors/actuators?
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]]
Line 31: Line 30:
 * Squeezing system??
 * Maybe mainly VIS group's charge and not AOS's:
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]
  * Squeezing system??

 * Highly Related Subsystems (not included in AOS)
  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO,
MIF)
  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF)

  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS)
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?)

AOStitle.png

KAGRA Auxiliary Optics System (AOS)


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
  • Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Roadmap

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)