Differences between revisions 110 and 119 (spanning 9 versions)
Revision 110 as of 2012-02-10 14:37:07
Size: 2707
Comment:
Revision 119 as of 2012-02-14 03:11:37
Size: 2716
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.
Line 16: Line 16:
||[[LCGT/Meeting/RoadMap | Roadmap]] || ||
Line 23: Line 24:
 * [[LCGT/subgroup/AOS/CCD1|Viewable Monitors]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/CCD1|Visible Imagers and Light Sources (CCD Monitors or equivalent)]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]]
Line 26: Line 27:
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Mode Profiler]]
 * Squeezing system??
 * Highly related subsystems (not included in AOS)
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Mode Profiler for huge beam]]

 * Any other optics, outside breadboard,...
 
* Squeezing system??

* Highly Related Subsystems (not included in AOS)
Line 33: Line 37:
  * Other local sensors/monitors/actuators?
 * Any other optics, outside breadboard,...

LCGT Auxiliary Optics System (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Roadmap

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)