Differences between revisions 133 and 142 (spanning 9 versions)
Revision 133 as of 2012-09-16 18:33:39
Size: 2679
Editor: KiwamuIzumi
Comment:
Revision 142 as of 2012-09-16 18:41:55
Size: 2910
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
|| Aux. opt. list from MIF's point of view || [[LCGT/subgroup/ifo/MIF/AuxOpticsLists]]||
|| Layout Meeting || [[LCGT/subgroup/vacuum ]]||
|| Auxiliary optics list from MIF's point of view || [[LCGT/subgroup/ifo/MIF/AuxOpticsLists]]||
|| Layout Meeting || [[KAGRA/Subgroups/VAC ]]||
Line 20: Line 20:
|| Parameter Meeting || [[LCGT/subgroup/OCG/parametermeeting]]||
||SVN ||[[LCGT/SVN]] ||
|| Interface Parameter Meeting || [[LCGT/subgroup/OCG/parametermeeting]]||
||SVN (version control system) ||[[LCGT/SVN]] ||
Line 23: Line 23:
|| Discussion with Rana 2010 || [[LCGT/iLCGT/Subgroup/DiscussionRana2010]]|| || Discussion with Rana (2010) || [[LCGT/iLCGT/Subgroup/DiscussionRana2010]]||
Line 50: Line 50:
== Links ==
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
 * [[https://www.advancedligo.mit.edu/aos.html|adv.LIGO Aux. Optics]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]
== Useful Links ==
 ||<#FF8080> ''''' Descriptions ''''' ||<#FF8080> ''''' Links '''''||
 || LIGO Document Control Center || [[https://dcc.ligo.org/]] ||
 ||aLIGO Auxiliary Optics || [[https://www.advancedligo.mit.edu/aos.html]] ||
 || How to join Mailing Lists for LCGT project || [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin]] ||
 || KAGRA AOS blog || [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/auxiliary/]] ||

KAGRA Auxiliary Optics System (AOS)

AOStitle.png


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
  • Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.

References

Descriptions

Links

Auxiliary optics list from MIF's point of view

LCGT/subgroup/ifo/MIF/AuxOpticsLists

Layout Meeting

KAGRA/Subgroups/VAC

Optical Parameters

LCGT/subgroup/ifo/MIF/OptParam

Interface Parameter Meeting

LCGT/subgroup/OCG/parametermeeting

SVN (version control system)

LCGT/SVN

Terminology

KAGRA/Terminology

Discussion with Rana (2010)

LCGT/iLCGT/Subgroup/DiscussionRana2010

Roadmap

LCGT/Meeting/RoadMap

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)