Differences between revisions 20 and 159 (spanning 139 versions)
Revision 20 as of 2011-06-20 22:09:08
Size: 674
Comment:
Revision 159 as of 2012-09-28 01:10:14
Size: 2737
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Auxiliary Optics Subsystem (AOS) = ## page was renamed from LCGT/subgroup/AOS
= KAGRA Auxiliary Optics System =
Line 3: Line 5:
<<TableOfContents(3)>> <<TableOfContents(2)>>
Line 6: Line 8:
of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue many parts of the LCGT interferometer.  . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.
Line 8: Line 10:
== References and Links ==
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]||
|| ||[[LCGT/Terminology|Terminology]]||
== General Description ==
 . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
 . Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.
Line 13: Line 14:
== References ==
 ||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Auxiliary optics list from MIF's point of view]]||
 ||[[KAGRA/Subgroups/VAC|Layout Meeting]]||[[LCGT/subgroup/OCG/parametermeeting|Interface Parameter Meeting]]||
 ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||
 ||[[LCGT/SVN|SVN]] || [[KAGRA/Terminology|Terminology]]||
 ||[[LCGT/iLCGT/Subgroup/DiscussionRana2010|Discussion with Rana (2010)]]||[[LCGT/Meeting/RoadMap|Roadmap]] ||
Line 14: Line 21:
== Subsystems ==
=== Major subsystems ===
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
 * [[LCGT/subgroup/AOS/OptLev1|Optical Lever]]
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources ]] including CCD Monitors or equivalent
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]] at room temperature
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]]

=== Related tasks ===
 * [[KAGRA/Subgroups/MIF/TaskList| MIF task lists]]
Line 16: Line 35:
[[LCGT/subgroup/AOS/Meetings|Meetings]]  * [[LCGT/subgroup/AOS/Meetings|KAGRA-AOS Meetings]]
 * [[LCGT/subgroup/AOS/Meeting_Archive|Meeting Archive]]

== Action Items ==
AOS action items

== Useful Links ==
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
 * [[https://www.advancedligo.mit.edu/aos.html|aLIGO Auxiliary Optics]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]
 * [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/auxiliary/|KAGRA AOS blog]]

-----
== Obsolete items ==
 * Squeezing? Squeezer optics
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
 * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators]] LIGO's OSEM-like things utilized in vibration isolation system
 * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors]] utilized in vibration isolation system or in noise-hunting phase

KAGRA Auxiliary Optics System


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
  • Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.

References

Subsystems

Major subsystems

Meetings

Action Items

AOS action items


Obsolete items

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)