Differences between revisions 38 and 159 (spanning 121 versions)
Revision 38 as of 2011-07-03 04:11:53
Size: 1225
Comment:
Revision 159 as of 2012-09-28 01:10:14
Size: 2737
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT Auxiliary Optics Subsystem (AOS) = ## page was renamed from LCGT/subgroup/AOS
= KAGRA
Auxiliary Optics System =
Line 6: Line 8:
The objectives of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.  . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

== General Description ==
 . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
 . Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.
Line 9: Line 15:
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]||
|| ||[[LCGT/Terminology|Terminology]]||
 ||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Auxiliary optics list from MIF's point of view]]||
 ||[[KAGRA/Subgroups/VAC|Layout Meeting]]||[[LCGT/subgroup/OCG/parametermeeting|Interface Parameter Meeting]]||
 ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||
 ||[[LCGT/SVN|SVN]] || [[KAGRA/Terminology|Terminology]]||
 ||[[LCGT/iLCGT/Subgroup/DiscussionRana2010|Discussion with Rana (2010)]]||[[LCGT/Meeting/RoadMap|Roadmap]] ||
Line 15: Line 22:
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]] === Major subsystems ===
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]
Line 17: Line 25:
 * [[LCGT/subgroup/AOS/StrayLight1|Baffles for Stray Light]]
 * [[LCGT/subgroup/AOS/StrayLight2|Output Faraday Isolaters for Stray Light]]
Line 20: Line 26:
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * Other local optical sensors/monitors/actuators?
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources ]] including CCD Monitors or equivalent
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]] at room temperature
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]]

=== Related tasks ===
 * [[KAGRA/Subgroups/MIF/TaskList| MIF task lists]]
Line 24: Line 35:
[[LCGT/subgroup/AOS/Meetings|Meetings]]  * [[LCGT/subgroup/AOS/Meetings|KAGRA-AOS Meetings]]
 * [[LCGT/subgroup/AOS/Meeting_Archive|Meeting Archive]]
Line 26: Line 38:
== Action Items ==
AOS action items
Line 27: Line 41:
== Links ==
 * [[https://www.advancedligo.mit.edu/aos.html|adv.LIGO Aux. Optics]]
== Useful Links ==
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
 * [[https://www.advancedligo.mit.edu/aos.html|aLIGO Auxiliary Optics]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]
 * [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/auxiliary/|KAGRA AOS blog]]

-----
== Obsolete items ==
 * Squeezing? Squeezer optics
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
 * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators]] LIGO's OSEM-like things utilized in vibration isolation system
 * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors]] utilized in vibration isolation system or in noise-hunting phase

KAGRA Auxiliary Optics System


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
  • Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.

References

Subsystems

Major subsystems

Meetings

Action Items

AOS action items


Obsolete items

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)