Differences between revisions 39 and 126 (spanning 87 versions)
Revision 39 as of 2011-07-03 04:48:54
Size: 1260
Comment:
Revision 126 as of 2012-09-16 17:52:42
Size: 2502
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT Auxiliary Optics Subsystem (AOS) = ## page was renamed from LCGT/subgroup/AOS
= LCGT Auxiliary Optics System (AOS) =
Line 6: Line 7:
The objectives of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.  . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

== General Description ==
 . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.
Line 9: Line 14:
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]||
|| ||[[LCGT/Terminology|Terminology]]||
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]|| ||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]|| ||
||[[LCGT/SVN|LCGT SVN]] ||[[KAGRA/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]||
||[[LCGT/Meeting/RoadMap | Roadmap]] || ||
Line 15: Line 20:
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes (transmit beams input green laser)]]
 * [[LCGT/subgroup/AOS/StrayLight1|Baffles for Stray Light]]
 * [[LCGT/subgroup/AOS/StrayLight2|Output Faraday Isolaters for Stray Light]]
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
Line 20: Line 23:
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * Other local optical sensors/monitors/actuators?
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources (CCD Monitors or equivalent)]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]]

 * Any other optics, outside breadboard,...
  * Squeezing system??

 * Highly Related Subsystems (not included in AOS)
  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF)
  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF)
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS)
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?)
Line 24: Line 38:
[[LCGT/subgroup/AOS/Meetings|Meetings]]  * [[LCGT/subgroup/AOS/Meetings|LCGT-AOS Meetings]]
Line 28: Line 42:
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
Line 29: Line 44:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]

LCGT Auxiliary Optics System (AOS)


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.

Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Roadmap

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)