Line 1: Line 1:
= LCGT Auxiliary Optics Subsystem (AOS) = = LCGT Auxiliary Optics System (AOS) =
Line 6: Line 6:
The objectives of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

== General Description ==
Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.
Line 9: Line 13:
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]||
|| ||[[LCGT/Terminology|Terminology]]||
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]|| ||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]|| ||
||[[LCGT/SVN|LCGT SVN]] ||[[LCGT/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]||
||[[LCGT/Meeting/RoadMap | Roadmap]] || ||
Line 15: Line 19:
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes (transmit IR/Green beams)]]
 * [[LCGT/subgroup/AOS/StrayLight1|Baffles for Stray Light]]
 * [[LCGT/subgroup/AOS/StrayLight2|Output Faraday Isolaters]]
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]
  * <!> Including beam baffles, output Faraday isolators, and calculation of BRDF of test masses...
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
Line 20: Line 23:
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * Other local optical sensors/monitors/actuators?
  * <!> Optical lever is a kind of local sensors, but unlike other local sensors, it requires long beam lines as lever's arms, thus this should be considerd in AOS.
 * [[LCGT/subgroup/AOS/CCD1|Viewing Monitors and Light Sources]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Mode Profiler for huge beam]]

 * Any other optics, outside breadboard,...
  * Squeezing system??

 * Highly Related Subsystems (not included in AOS)
  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF)
  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF)
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS)
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?)
Line 24: Line 39:
[[LCGT/subgroup/AOS/Meetings|Meetings]]  * [[LCGT/subgroup/AOS/Meetings|LCGT-AOS Meetings]]
Line 28: Line 43:
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
Line 29: Line 45:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]

LCGT Auxiliary Optics System (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Roadmap

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)