1377
Comment:
|
2502
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= LCGT Auxiliary Optics Subsystem (AOS) = | ## page was renamed from LCGT/subgroup/AOS = LCGT Auxiliary Optics System (AOS) = |
Line 6: | Line 7: |
The objectives of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. | . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. == General Description == . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required. |
Line 9: | Line 14: |
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]|| ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]|| || ||[[LCGT/Terminology|Terminology]]|| |
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]|| || ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]|| || ||[[LCGT/SVN|LCGT SVN]] ||[[KAGRA/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]|| ||[[LCGT/Meeting/RoadMap | Roadmap]] || || |
Line 15: | Line 20: |
* [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]] * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes (transmit IR/Green beams)]] * [[LCGT/subgroup/AOS/StrayLight1|Baffles for Stray Light]] * [[LCGT/subgroup/AOS/StrayLight2|Output Faraday Isolaters]] |
* [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]] * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]] |
Line 20: | Line 23: |
* [[LCGT/subgroup/AOS/CCD1|CCD monitors]] * Other local optical sensors/monitors/actuators? * Squeeze?? * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]] |
* [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources (CCD Monitors or equivalent)]] * [[LCGT/subgroup/AOS/Viewport1|Viewports]] * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]] * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]] |
Line 25: | Line 28: |
== ETC tasks == * [[LCGT/subgroup/AOS/Mirror1|Micro Roughness of Mirrors]] |
* Any other optics, outside breadboard,... * Squeezing system?? * Highly Related Subsystems (not included in AOS) * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF) * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF) * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS) * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?) |
Line 29: | Line 38: |
[[LCGT/subgroup/AOS/Meetings|Meetings]] | * [[LCGT/subgroup/AOS/Meetings|LCGT-AOS Meetings]] |
Line 33: | Line 42: |
* [[https://dcc.ligo.org/|LIGO Document Control Center]] | |
Line 34: | Line 44: |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]] |
LCGT Auxiliary Optics System (AOS)
Contents
Objectives
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.
General Description
- Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.
References
|
||
|
||
|
Subsystems
- Any other optics, outside breadboard,...
- Squeezing system??
- Highly Related Subsystems (not included in AOS)
Meetings