Differences between revisions 59 and 101 (spanning 42 versions)
Revision 59 as of 2011-08-25 18:05:28
Size: 1877
Comment:
Revision 101 as of 2011-10-18 16:00:01
Size: 2991
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
The objectives of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

== General Description ==
Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.
Line 15: Line 19:
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Transmit Telescopes (transmit IR/Green beams)]]
 * [[LCGT/subgroup/AOS/StrayLight2|Output Faraday Isolaters]]
  * <!> Including beam baffles, output Faraday isolators, and calculation of BRDF of test masses...
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Pick-off and transmit telescopes]]
   * <!> Auxiliary cavity-locking system (Green laser one) itself should be considered in MIF or IOO. The effort of system designing should be separated from that of engineering and fabricating from the WBS point of view (or what-you-call system engineering) even if the person assigned to both is the same.
Line 18: Line 24:
  * <!> Optical lever is a kind of local sensors, but unlike other local sensors, it requires long beam lines as lever's arms, thus this should be considerd in AOS.
Line 20: Line 27:
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment Setting]]
 * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
 * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Beam Targets in Arms]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Mode Profiler]]
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
Line 24: Line 32:
 * Any other optics, outside breadboard,...
Line 25: Line 34:
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]]
 * [[LCGT/subgroup/AOS/Optics1|Any other optics, outside breadboard,... ]]
 * [[LCGT/subgroup/AOS/Mirror1|Micro Roughness of Mirrors]]
 * Maybe mainly VIS group's charge and not AOS's:
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]
Line 34: Line 43:
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
Line 35: Line 45:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]

LCGT Auxiliary Optics Subsystem (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)