Differences between revisions 66 and 128 (spanning 62 versions)
Revision 66 as of 2011-08-29 06:15:20
Size: 2257
Comment:
Revision 128 as of 2012-09-16 18:17:12
Size: 2536
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT Auxiliary Optics Subsystem (AOS) = ## page was renamed from LCGT/subgroup/AOS
{{attachment:AOStitle.png}}
= LCGT Auxiliary Optics System (AOS) =
Line 6: Line 8:
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.  . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.
Line 9: Line 11:
All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed for considering the space allocated for AOS, AOS are required for fully operating LCGT, so we should pack them into the vacuum chambers '''''BY ANY MEANS'''''.
 . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
 . Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.
Line 15: Line 17:
||[[LCGT/SVN|LCGT SVN]] ||[[LCGT/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]|| ||[[LCGT/SVN|LCGT SVN]] ||[[KAGRA/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]||
||[[LCGT/Meeting/RoadMap | Roadmap]] || ||
Line 18: Line 21:
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control (incl.: beam baffles, output Faraday, calc. of BRDF...)]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|IR Pick-off and transmit telescopes]]
 * [[LCGT/subgroup/AOS/
BeamReduceTelescope2|Green Transmit Telescopes]]
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
Line 22: Line 24:
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment System]]
 * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
 * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]]
 * Other local sensors/monitors/actuators?
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources (CCD Monitors or equivalent)]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]]
Line 30: Line 30:
 * Squeezing system??   * Squeezing system??

 * Highly Related Subsystems (not included in AOS)
  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF)
  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF)
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS)
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?)
Line 39: Line 45:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]

AOStitle.png

LCGT Auxiliary Optics System (AOS)


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
  • Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Roadmap

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)