Differences between revisions 8 and 158 (spanning 150 versions)
Revision 8 as of 2011-06-20 18:25:05
Size: 508
Comment:
Revision 158 as of 2012-09-28 01:03:01
Size: 2697
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Auxiliary Optics Subsystem (AOS) = ## page was renamed from LCGT/subgroup/AOS
= KAGRA Auxiliary Optics System =
Line 3: Line 5:
<<TableOfContents(2)>>
Line 4: Line 7:
=== Objective of the subgroup ===
is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue many parts of the LCGT interferometer.
== Objectives ==
 . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.
Line 7: Line 10:
=== Links ===
||[[LCGT/Terminology|Terminology]]||
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||
== General Description ==
 . Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
 . Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.
Line 12: Line 14:
=== Meetings ===
[[LCGT/subgroup/AOS/Meetings|Meetings]]
== References ==
 ||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Auxiliary optics list from MIF's point of view]]||
 ||[[KAGRA/Subgroups/VAC|Layout Meeting]]||[[LCGT/subgroup/OCG/parametermeeting|Interface Parameter Meeting]]||
 ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||
 ||[[LCGT/SVN|SVN]] || [[KAGRA/Terminology|Terminology]]||
 ||[[LCGT/iLCGT/Subgroup/DiscussionRana2010|Discussion with Rana (2010)]]||[[LCGT/Meeting/RoadMap|Roadmap]] ||

== Subsystems ==
=== Major subsystems ===
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
 * [[LCGT/subgroup/AOS/OptLev1|Optical Lever]]
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources ]] including CCD Monitors or equivalent
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]] at room temperature
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]]

=== Related tasks ===
 * [[KAGRA/Subgroups/MIF/TaskList| MIF task lists]]

== Meetings ==
 * [[LCGT/subgroup/AOS/Meetings|KAGRA-AOS Meetings]]
 * [[LCGT/subgroup/AOS/Meeting_Archive|Meeting Archive]]

== Useful Links ==
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
 * [[https://www.advancedligo.mit.edu/aos.html|aLIGO Auxiliary Optics]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]
 * [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/auxiliary/|KAGRA AOS blog]]

-----
== Obsolete items ==
 * Squeezing? Squeezer optics
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
 * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators]] LIGO's OSEM-like things utilized in vibration isolation system
 * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors]] utilized in vibration isolation system or in noise-hunting phase

KAGRA Auxiliary Optics System


Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

General Description

  • Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
  • Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.

References

Subsystems

Major subsystems

Meetings


Obsolete items

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)