Differences between revisions 94 and 100 (spanning 6 versions)
Revision 94 as of 2011-09-03 09:31:49
Size: 2925
Comment:
Revision 100 as of 2011-10-06 19:53:37
Size: 2972
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Line 20: Line 20:
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|IR Pick-off and transmit telescopes]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green Transmit Telescopes]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Pick-off and transmit telescopes]]
Line 26: Line 25:
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
Line 29: Line 27:
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]]  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Beam Targets in Arms]]
Line 31: Line 30:
 * [[LCGT/subgroup/AOS/BeamTarget1|Beam Target System]]  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
Line 46: Line 45:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]

LCGT Auxiliary Optics Subsystem (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)