The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. | The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. |
Line 9: | Line 9: |
All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. | Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. |
Line 16: | Line 16: |
||[[LCGT/Meeting/RoadMap | Roadmap]] || || | |
Line 20: | Line 21: |
* [[LCGT/subgroup/AOS/BeamReduceTelescope1|IR Pick-off and transmit telescopes]] * [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green Transmit Telescopes]] * <!> Auxiliary laser-locking system itself should be considered in MIF or IOO. The effort of system designing should be separated from that of engineering and fabricating from the WBS point of view (or what-you-call system engineering) even if the person assigned to both is the same. |
* [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]] |
Line 26: | Line 24: |
* [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]] * [[LCGT/subgroup/AOS/CCD1|CCD monitors]] * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]] * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]] * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Mode Profiler]] * [[LCGT/subgroup/AOS/BeamTarget1|Beam Target System]] * Other local sensors/monitors/actuators? |
* [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources (CCD Monitors or equivalent)]] * [[LCGT/subgroup/AOS/Viewport1|Viewports]] * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]] * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profiler for huge beam]] |
Line 34: | Line 30: |
* Squeezing system?? * Maybe mainly VIS group's charge and not AOS's: * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]] * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]] |
* Squeezing system?? * Highly Related Subsystems (not included in AOS) * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF) * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF) * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS) * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?) |
Line 46: | Line 45: |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]] |
LCGT Auxiliary Optics System (AOS)
Contents
Objectives
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.
General Description
Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.
References
|
||
|
||
|
Subsystems
Including beam baffles, output Faraday isolators, and calculation of BRDF of test masses...
Optical lever is a kind of local sensors, but unlike other local sensors, it requires long beam lines as lever's arms, thus this should be considerd in AOS.
- Any other optics, outside breadboard,...
- Squeezing system??
- Highly Related Subsystems (not included in AOS)