Differences between revisions 96 and 109 (spanning 13 versions)
Revision 96 as of 2011-09-03 09:41:50
Size: 2932
Comment:
Revision 109 as of 2012-02-10 14:35:46
Size: 2724
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT Auxiliary Optics Subsystem (AOS) = = LCGT Auxiliary Optics System (AOS) =
Line 20: Line 20:
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|IR Pick-off and transmit telescopes]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green Transmit Telescopes]]
   * <!> Auxiliary laser-locking system itself should be considered in MIF or IOO. The effort of system designing should be separated from that of engineering and fabricating from the WBS point of view (or what-you-call system engineering) even if the person assigned to both is the same.
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
Line 26: Line 23:
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
* [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * [[LCGT/subgroup/AOS/CCD1|Viewable Monitors]]
Line 29: Line 25:
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
* [[LCGT/subgroup/AOS/BeamTarget1|Beam Targets in Arms]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
Line 35: Line 30:
 * Highly related subsystems
  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF)
  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF)
Line 46: Line 44:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/howtojoin|How to join Mailing Lists for LCGT project]]

LCGT Auxiliary Optics System (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)