=== EVO connection === [[LCGT/Meeting/f2f/2010Sept/EVO|Connection information]] * [[LCGT/Meeting/EVOJ|EVO Usage in Japanese]] * [[LCGT/Meeting/EVOen|EVO Usage in English]] |
|
Line 29: | Line 36: |
||10:30~12:00||||Plenary session (chair:M.Ohashi)|| | ||10:30~11:30||||Plenary session (chair:O.Miyakawa)|| |
Line 32: | Line 39: |
|| ||Project status (Time Schedule, budget status, How to use the budget)||T.Kajita [30min]|| || ||Discussion||[30min]|| |
|| ||Project status (Time Schedule, budget status, How to use the budget)||T.Kajita [5+5min]|| || ||Discussion||[20min]|| |
Line 35: | Line 42: |
||13:00~18:00||||Status report from subgroups (chair:M.Ando)|| | ||11:30~18:00||||Status report from subgroups (chair:M.Ando)|| |
Line 37: | Line 44: |
|| ||Tunnel|| || || ||Vacuum|| || || ||Facility support|| || || ||interferometer design|| || || ||Vibration isolation/suspension|| || || ||Cryogenics|| || ||||||coffee break 15:30~15:45|| || ||Laser|| || || ||Input/output optics|| || || ||Electronics|| || || ||Digital system|| || || ||Data analysis|| || || ||Baseline interferometer|| || |
|| ||Data analysis||N.Kanda [20+10min]|| || || || || ||||||Lunch time 12:00~13:00|| || || || || || ||Tunnel||T.Uchiyama [15+5min]|| || ||Vacuum||Y.Saito [10+5min]|| || ||Facility support||S.Miyoki [15+5min]|| ||||||Break 14:00~14:15|| || ||Interferometer design||Y.Aso [15+15min]|| || ||Laser+Mirror||N.Mio [15+10min]|| ||||||coffee break 15:15~15:30|| || ||Vibration isolation/suspension||R.Takahashi [15+15min]|| || ||Suspension/Cryogenics||T.Suzuki [15+5min]|| ||||||Break 16:30~16:45|| || ||Electronics||S.Moriwaki [15+5min]|| || ||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=178|Digital system]]||O.Miyakawa [15+5min]|| || ||Baseline interferometer||A.Takamori[15+5min]|| |
Line 62: | Line 73: |
|| ||System engineering for km scale IFO|| [20min]|| | |
Line 64: | Line 74: |
|| ||Joining CRC||N.Kandaa [10min]|| || ||Discussion||[20min]|| |
|| ||Discussion||[50min]|| |
Line 67: | Line 76: |
||13:00~15:00||||Special working group + scheduling session (chair:K.Kuroda)|| | ||||||Lunch time 12:00~13:00|| |||||||| ||13:00~ ||Input/output optics (Status report)||S.Telada [15+5min]|| || || || || ||13:20~15:00||||Special working group + scheduling session (chair:K.Kuroda)|| |
Line 72: | Line 85: |
|| ||Schedule, Task list||O.Miyakawa [30min]|| || ||Discussion||[30min]|| |
|| ||Schedule, Task list||O.Miyakawa [20min]|| || ||Advanced Configuration Group||K.Somiya [10min]|| |
Line 76: | Line 89: |
|| || || || || ||Closing talk||I.Nakatani[10min]|| ---- *How to upload your presentation file on the program ([[LCGT/Meeting/f2f/uploadE|English]],[[LCGT/Meeting/f2f/upload|Japanese]]) |
LCGT f2f meeting
This is the first face-to-face meeting after the approval of the LCGT construction budget..
I would like to urge all collaboration members to come to this commencement meeting and to recognize each other whom we cooperatively work together with to achieve the LCGT objective. We are far behind the progress of the world projects of gravitational wave detection and we are not so well funded nor sufficiently staffed at present, considering the extensive & urgent works to catch up overseas projects in shorter time. Against this difficulty, only way that we can take is to work coherently together by letting each direction align to the LCGT objective.
At this ,meeting, we will summarize the present status of LCGT and will present the construction design with its schedule. We try to find the most appropriate way to fulfill the objective by discussing together. This meeting presents you a chance where you can confirm your position and recognize what you can do for LCGT among many sub-working groups for the construction of adventurous cryogenic interferometer. I think that it is the most important to share the strong will to conquer difficulties that stand in front of us. Japanese government has supplied us with extensive money from the difficult finance and economy. We are obliged to thank for the brave decision of the Japanese government but we are willing to work for this obligation to make this fundamental science project successful. I hope each collaboration member participates this meeting for the success of LCGT.
Kazuaki Kuroda
Date: September 27-28, 2010
Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference room
http://www.icrr.u-tokyo.ac.jp/access/index_eng.html
EVO connection
Program
September 27(Mon.) |
||
10:30~11:30 |
Plenary session (chair:O.Miyakawa) |
|
|
|
|
|
Overview of iLCGT and bLCGT |
K.Kuroda [30min] |
|
Project status (Time Schedule, budget status, How to use the budget) |
T.Kajita [5+5min] |
|
Discussion |
[20min] |
11:30~18:00 |
Status report from subgroups (chair:M.Ando) |
|
|
|
|
|
Data analysis |
N.Kanda [20+10min] |
|
|
|
Lunch time 12:00~13:00 |
||
|
|
|
|
Tunnel |
T.Uchiyama [15+5min] |
|
Vacuum |
Y.Saito [10+5min] |
|
Facility support |
S.Miyoki [15+5min] |
Break 14:00~14:15 |
||
|
Interferometer design |
Y.Aso [15+15min] |
|
Laser+Mirror |
N.Mio [15+10min] |
coffee break 15:15~15:30 |
||
|
Vibration isolation/suspension |
R.Takahashi [15+15min] |
|
Suspension/Cryogenics |
T.Suzuki [15+5min] |
Break 16:30~16:45 |
||
|
Electronics |
S.Moriwaki [15+5min] |
|
O.Miyakawa [15+5min] |
|
|
Baseline interferometer |
A.Takamori[15+5min] |
18:00~20:00 |
Banquet at Plaza IKOI in Kashiwa-campus |
September 28(Tue.) |
||
9:00~12:00 |
Discussions for important items (chair:I.Nakatani) |
|
|
|
|
|
LCGT organization |
K.Kuroda [30min] |
|
MOU with LIGO and VIRGO (International collaboration) |
K.Kuroda [30min] |
|
H.Yamamoto [15min] |
|
coffee break 10:15~10:30 |
||
|
Membership, author list |
K.Kuroda [30min] |
|
To media interview |
K.Kuroda [10min] |
|
Discussion |
[50min] |
Lunch time 12:00~13:00 |
||
13:00~ |
Input/output optics (Status report) |
S.Telada [15+5min] |
|
|
|
13:20~15:00 |
Special working group + scheduling session (chair:K.Kuroda) |
|
|
|
|
|
Optical configuration |
K.Somiya [30min] |
|
Report from RSE roadmap special subgroup |
M.Ando [10min] |
|
LCGT roadmap |
M.Ando [20min] |
|
Schedule, Task list |
O.Miyakawa [20min] |
|
Advanced Configuration Group |
K.Somiya [10min] |
15:00~ |
Closing session |
|
|
|
|
|
Closing talk |
I.Nakatani[10min] |