Differences between revisions 6 and 54 (spanning 48 versions)
Revision 6 as of 2010-09-07 14:25:25
Size: 1193
Comment:
Revision 54 as of 2010-09-26 18:13:09
Size: 4827
Editor: AkitoAraya
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== LCGT f2f meeting preliminary program == == LCGT f2f meeting ==
Line 3: Line 3:
=== September 27(Mon.) ===
 *Plenary session (chair:M.Ohashi) 10:00~12:00
  *Overview of iLCGT and bLCGT(K.Kuroda)
  *Project status(T.Kajita)
   *Time Schedule
   *budget status
   *How to use the budget
   *Vacuum tube diameter
This is the first face-to-face meeting after the approval of the LCGT construction budget..
Line 12: Line 5:
 *Status report from subgroups (chair:M.Ando) 13:00~18:00, coffee break15:30~15:45
  *Tunnel
  *Vacuum
  *Facility support
  *Interferometer design
  *Vibration isolation/suspension
  *Cryogenics
  *Laser
  *Input/output optics
  *Electronics
  *Digital system
  *Data analysis
  *Baseline interferometer
I would like to urge all collaboration members to come to this commencement meeting and to recognize each other whom we cooperatively
work together with to achieve the LCGT objective. We are far behind the progress of the world projects of gravitational wave detection and we
are not so well funded nor sufficiently staffed at present, considering the extensive & urgent works to catch up overseas projects in shorter
time. Against this difficulty, only way that we can take is to work coherently together by letting each direction align to the LCGT objective.
Line 26: Line 10:
 *Banquet 18:15~20:00 At this ,meeting, we will summarize the present status of LCGT and will present the construction design with its schedule. We try to find the
most appropriate way to fulfill the objective by discussing together. This meeting presents you a chance where you can confirm your position
and recognize what you can do for LCGT among many sub-working groups for the construction of adventurous cryogenic interferometer. I think that
it is the most important to share the strong will to conquer difficulties that stand in front of us. Japanese government has supplied
us with extensive money from the difficult finance and economy. We are obliged to thank for the brave decision of the Japanese government but
we are willing to work for this obligation to make this fundamental science project successful. I hope each collaboration member participates this meeting for the success of LCGT.
Line 28: Line 17:
=== September 28(Tue.) ===
 *Discussions for important items (chair:I.Nakatani) 8:30~12:00, coffee break10:15~10:30
  *LCGT organization(K.Kuroda)
  *Membership, author list(K.Kuroda)
  *MOU with LIGO and VIRGO(K.Kuroda)
   *International collaboration
  *To media interview(K.Kuroda)
  *Task list, missing tasks(O.Miyakawa)
  *Risk management
Kazuaki Kuroda
Line 38: Line 19:
 *Special working group session (chair:K.Kuroda) 13:00~15:00
  *Optical configuration (K.Somiya)
  *Report from RSE roadmap special subgroup (M.Ando)
  *LCGT roadmap (M.Ando)
----
Line 43: Line 21:
 *Closing session 15:00~ === Date: September 27-28, 2010 ===
=== Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference room ===
[[http://www.icrr.u-tokyo.ac.jp/access/index_eng.html]]

=== EVO connection ===
[[LCGT/Meeting/f2f/2010Sept/EVO|Connection information]]
 * [[LCGT/Meeting/EVOJ|EVO Usage in Japanese]]
 * [[LCGT/Meeting/EVOen|EVO Usage in English]]



----
== Program ==
||||||September 27(Mon.)||
||||||||
||10:30~11:30||||Plenary session (chair:O.Miyakawa)||
|| || || ||
|| ||Overview of iLCGT and bLCGT||K.Kuroda [30min]||
|| ||Project status (Time Schedule, budget status, How to use the budget)||T.Kajita [5+5min]||
|| ||Discussion||[20min]||
||||||||
||11:30~18:00||||Status report from subgroups (chair:M.Ando)||
|| || || ||
|| ||Data analysis||N.Kanda [20+10min]||
|| || || ||
||||||Lunch time 12:00~13:00||
|| || || ||
|| ||Tunnel||T.Uchiyama [15+5min]||
|| ||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=183|Vacuum]]||Y.Saito [10+5min]||
|| ||Facility support||S.Miyoki [15+5min]||
||||||Break 14:00~14:15||
|| ||Interferometer design||Y.Aso [15+15min]||
|| ||Laser+Mirror||N.Mio [15+10min]||
||||||coffee break 15:15~15:30||
|| ||Vibration isolation/suspension||R.Takahashi [15+15min]||
|| ||Suspension/Cryogenics||T.Suzuki [15+5min]||
||||||Break 16:30~16:45||
|| ||Electronics||S.Moriwaki [15+5min]||
|| ||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=178|Digital system]]||O.Miyakawa [15+5min]||
|| ||Baseline interferometer||A.Takamori[15+5min]||
||||||||
||18:00~20:00||||Banquet at [[http://www.u-tokyo.ac.jp/campusmap/cam03_04_11_e.html|Plaza IKOI]] in Kashiwa-campus||

||||||September 28(Tue.)||
||||||||
||9:00~12:00||||Discussions for important items (chair:I.Nakatani)||
|| || || ||
|| ||LCGT organization||K.Kuroda [30min]||
|| ||MOU with LIGO and VIRGO (International collaboration)||K.Kuroda [30min]||
|| ||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=174|Collaboration between LCGT and LIGO]]||H.Yamamoto [15min]||
||||||coffee break 10:15~10:30||
|| ||Collaboration with VIRGO for mirrors||K.Kuroda [20min]||
|| ||Membership, author list||K.Kuroda [30min]||
|| ||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=180|Statements of the interest to join LCGT]]||Wei-Tou Ni [10min]||
|| ||[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=182|Topic interests in LCGT data analysis]]||Wei-Tou Ni [10min]||
|| ||Discussion||[30min]||
||||||||
||||||Lunch time 12:00~13:00||
||||||||
||13:00~ ||Input/output optics (Status report)||S.Telada [15+5min]||
|| || || ||
||13:20~15:00||||Special working group + scheduling, others session (chair:K.Kuroda)||
|| || || ||
|| ||Optical configuration||K.Somiya [30min]||
|| ||Report from RSE roadmap special subgroup||M.Ando [10min]||
|| ||LCGT roadmap||M.Ando [20min]||
|| ||Schedule, Task list||O.Miyakawa [20min]||
|| ||Advanced Configuration Group||K.Somiya [10min]||
||||||||
||15:00~||||Closing session||
|| || || ||
|| ||Closing talk||I.Nakatani[10min]||

----
 *How to upload your presentation file on the program ([[LCGT/Meeting/f2f/uploadE|English]],[[LCGT/Meeting/f2f/upload|Japanese]])

LCGT f2f meeting

This is the first face-to-face meeting after the approval of the LCGT construction budget..

I would like to urge all collaboration members to come to this commencement meeting and to recognize each other whom we cooperatively work together with to achieve the LCGT objective. We are far behind the progress of the world projects of gravitational wave detection and we are not so well funded nor sufficiently staffed at present, considering the extensive & urgent works to catch up overseas projects in shorter time. Against this difficulty, only way that we can take is to work coherently together by letting each direction align to the LCGT objective.

At this ,meeting, we will summarize the present status of LCGT and will present the construction design with its schedule. We try to find the most appropriate way to fulfill the objective by discussing together. This meeting presents you a chance where you can confirm your position and recognize what you can do for LCGT among many sub-working groups for the construction of adventurous cryogenic interferometer. I think that it is the most important to share the strong will to conquer difficulties that stand in front of us. Japanese government has supplied us with extensive money from the difficult finance and economy. We are obliged to thank for the brave decision of the Japanese government but we are willing to work for this obligation to make this fundamental science project successful. I hope each collaboration member participates this meeting for the success of LCGT.

Kazuaki Kuroda


Date: September 27-28, 2010

Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference room

http://www.icrr.u-tokyo.ac.jp/access/index_eng.html

EVO connection

Connection information


Program

September 27(Mon.)

10:30~11:30

Plenary session (chair:O.Miyakawa)

Overview of iLCGT and bLCGT

K.Kuroda [30min]

Project status (Time Schedule, budget status, How to use the budget)

T.Kajita [5+5min]

Discussion

[20min]

11:30~18:00

Status report from subgroups (chair:M.Ando)

Data analysis

N.Kanda [20+10min]

Lunch time 12:00~13:00

Tunnel

T.Uchiyama [15+5min]

Vacuum

Y.Saito [10+5min]

Facility support

S.Miyoki [15+5min]

Break 14:00~14:15

Interferometer design

Y.Aso [15+15min]

Laser+Mirror

N.Mio [15+10min]

coffee break 15:15~15:30

Vibration isolation/suspension

R.Takahashi [15+15min]

Suspension/Cryogenics

T.Suzuki [15+5min]

Break 16:30~16:45

Electronics

S.Moriwaki [15+5min]

Digital system

O.Miyakawa [15+5min]

Baseline interferometer

A.Takamori[15+5min]

18:00~20:00

Banquet at Plaza IKOI in Kashiwa-campus

September 28(Tue.)

9:00~12:00

Discussions for important items (chair:I.Nakatani)

LCGT organization

K.Kuroda [30min]

MOU with LIGO and VIRGO (International collaboration)

K.Kuroda [30min]

Collaboration between LCGT and LIGO

H.Yamamoto [15min]

coffee break 10:15~10:30

Collaboration with VIRGO for mirrors

K.Kuroda [20min]

Membership, author list

K.Kuroda [30min]

Statements of the interest to join LCGT

Wei-Tou Ni [10min]

Topic interests in LCGT data analysis

Wei-Tou Ni [10min]

Discussion

[30min]

Lunch time 12:00~13:00

13:00~

Input/output optics (Status report)

S.Telada [15+5min]

13:20~15:00

Special working group + scheduling, others session (chair:K.Kuroda)

Optical configuration

K.Somiya [30min]

Report from RSE roadmap special subgroup

M.Ando [10min]

LCGT roadmap

M.Ando [20min]

Schedule, Task list

O.Miyakawa [20min]

Advanced Configuration Group

K.Somiya [10min]

15:00~

Closing session

Closing talk

I.Nakatani[10min]


LCGT/Meeting/f2f/2010Sept (last edited 2011-06-17 00:23:42 by OsamuMiyakawa)