Differences between revisions 406 and 414 (spanning 8 versions)
Revision 406 as of 2020-11-13 09:55:59
Size: 5550
Editor: satoru.ikeda
Comment:
Revision 414 as of 2021-02-06 09:50:56
Size: 5875
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

/!\ [April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted [[https://github.com/gw-vis/kagra-vis/issues/18|here]].
Line 7: Line 4:
 Requirements::
 :: '''Isolation performance''': Does not contaminate the design sensitivity
 :: '''Stability''': Keep the above performance in anytime
 :: '''Operability''': Recover the all VIS system automatically
== Subsystem Definition ==
 * -+This subsystem makes vibration isolation for all optics used in KAGRA.+-
 * -+The test mass mirrors are cooled to 20K through heat links. Though the mechanical design for the cryogenic suspensions is included by the task of this subsystem , the final stage which consists of a sapphire mirror and sapphire wires is provided by the cryogenic subsystem. The heat links are not included in this subsystem either.+-
Line 12: Line 8:
Ref :[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11930|JGW-E2011930]] Reference [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=365|JGW-T1100365-v2]]
Line 20: Line 17:
|| - || - || - || - || [[KAGRA/Subgroups/VIS/OpsManual/Traverser|Traverser]] || - || - ||
Line 34: Line 32:
|| [[KAGRA/Subgroups/VIS/Photos|Photos]] || [[/KAGRA/Subgroups/VIS/Daily Operations|Daily Operations]] || || [[KAGRA/Subgroups/VIS/Photos|Photos]] || [[KAGRA/Subgroups/VIS/Daily Operations|Daily Operations]] ||

/!\ [April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted [[https://github.com/gw-vis/kagra-vis/issues/18|here]].

Vibration Isolation System (VIS)

Subsystem Definition

  • -+This subsystem makes vibration isolation for all optics used in KAGRA.+-
  • -+The test mass mirrors are cooled to 20K through heat links. Though the mechanical design for the cryogenic suspensions is included by the task of this subsystem , the final stage which consists of a sapphire mirror and sapphire wires is provided by the cryogenic subsystem. The heat links are not included in this subsystem either.+-

Reference JGW-T1100365-v2


Design

Suspensions

Mechanics

Sensors

Actuators/Motors

Digital System

Diagnostics

Concept?

Type-A

Pre-Isolator

Inertial Sensor

Voice coil actuator

RTModel

Acceptance Test

Actuator Design

Type-B

GAS

LVDT

Solenoid actuator?

Guardian

---

-

Type-Bp

Magnetic damper

Photo Sensor

Picomotor

SDF

-

-

Type-C

Maraging wire

Optical Lever (OpLev)

Stepper Motor

-

-

-

TMS-VIS

-

-

Fishing Rods

-

-

-

-

-

-

Traverser

-

-

-

-

-

OSEM

-

-

-

-

-

Temp. Control

-

-

Meetings

Management

Other subsystem interfaces

For Users

VIS Apps

Weekly VIS meeting

Schedule

AEL interfaces

Bug Reports

SUMCON

Extraordinary meetings

Github Projects

DGS interfaces

Trouble Shooting

ModelPlotter

Old VISMeeting

Github Repository

CRY interface

AutoMeasurement

---

---

---

---

SuspensionControlModeling

---

---

---

---

Kontrol

---

---

---

---

VIS Health Check

Links, Misic.

Documents

Wiki SEI, SUS

VIS Introduction

Log SEI, LHO, LLO, Virgo

VIS Doc. Tree 

Photos

Daily Operations

/!\ [April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted here.


Old (Please arrange me)


KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)