Differences between revisions 25 and 60 (spanning 35 versions)
Revision 25 as of 2018-07-06 17:41:16
Size: 2444
Comment:
Revision 60 as of 2018-10-02 23:19:04
Size: 5773
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
||<<MonthCalendar(,2018,5)>>||<<MonthCalendar(,2018,6)>>|| ||<<MonthCalendar(,2018,6)>>||<<MonthCalendar(,2018,7)>>||<<MonthCalendar(,2018,8)>>||||<<MonthCalendar(,2018,9)>>||
Line 8: Line 8:
 * https://gwpo.nao.ac.jp/wiki/ATCstandalone  * [[https://gwpo.nao.ac.jp/wiki/ATCstandalone|Standalone Machine in ATC]]
 * '''Mechanical design''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6336|Mechanical design of TMS Vibration Isolation Stage (by Uraguchi-san)]]
 * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6260| design of blade spring for TMS VIS stage (in Japanese) (by Uraguchi-san)]]
 * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5752| mechanical model of TMS VIS (in Japanese) (by Uraguchi-san)]]
 * '''Ref''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8502|TMS VIS coordinate (in Japanese) (by Uraguchi-san)]]
Line 11: Line 15:
 * Memo: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8480]]
 * note: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8508]]
 * メモ: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0/2018-09-12]]
Line 15: Line 22:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8464|Coil inspection report (JGW-T1808464)]]
Line 19: Line 27:
=== Polarity & Calibration Factor ===
 * V: postive means that the LVDT outputs positive counts when TMS-VIS moves upward, and so the calibration factors are set.
 * H: postive means that the LVDT outputs positive counts when TMS-VIS moves positive yaw (counter clock wise from top view), and so the calibration factors are set.
||'''Sensor'''|| Serial#|| polarity || calibration factor ||
|| LVDT V1 || || negative ||-0.149 [um/cnt] ||
|| LVDT V2 || ||positive || 0.138 [um/cnt] ||
|| LVDT V3 || ||negative ||-0.135 [um/cnt] ||
|| LVDT H1 || ||positive || 0.154 [um/cnt] ||
|| LVDT H2 || ||positive || 0.146 [um/cnt] ||
|| LVDT H3 || ||positive || 0.150 [um/cnt] ||


Line 21: Line 42:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8465|Coil inspection report (JGW-T1808465)]]
Line 32: Line 54:

=== Polarity & Calibration Factor ===
 * V: postive means upward (TMS-VIS moves in upward by inputting positive value to the act coils from MEDM)
 * H: positive means plus yaw (TMS-VIS moves in counter clock wise from top view by inputting positive value to the act coils from MEDM)
||'''Actuator'''|| polarity ||Serial#||
|| COIL V1 || positive || ||
|| COIL V2 || positive || ||
|| COIL V3 || positive || ||
|| COIL H1 || negative (obsolete) -> || ||
|| COIL H2 || positive (obsolete)-> || ||
|| COIL H3 || positive (obsolete) -> || ||

Line 33: Line 68:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8466|Data sheets of the geophones (JGW-T1808466)]]
Line 34: Line 70:
|| Serical# of L-4C||Vert/Horiz||Naming of the assembled unit||Assembler||
|| 404080975 || Vert || || ||
|| 404080976 || Vert || TMS-VISX: Geo-V2|| Akutsu ||
|| 404080977 || Vert || || ||
|| 404080978 || Vert || || ||
|| 404084240 || Vert || || ||
|| 404084241 || Vert || TMS-VISX: Geo-V3|| Akutsu ||
|| 404084242 || Vert || TMS-VISX: Geo-V1|| Fujii -> Akutsu ||
|| 2 || Horiz|| TMS-VISX: Geo-H3|| Akutsu -> Uraguchi ||
|| 3 || Horiz|| || ||
|| 4 || Horiz|| TMS-VISX: Geo-H1|| Akutsu ||
|| 5 || Horiz|| TMS-VISX: Geo-H2|| Akutsu ||
|| 15 || Horiz|| || ||
|| 16 || Horiz|| || ||
|| 17 || Horiz|| || ||

 

 

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

<< <  2018 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

<< <  2018 / 8 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

LVDTs

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu).

Polarity & Calibration Factor

  • V: postive means that the LVDT outputs positive counts when TMS-VIS moves upward, and so the calibration factors are set.
  • H: postive means that the LVDT outputs positive counts when TMS-VIS moves positive yaw (counter clock wise from top view), and so the calibration factors are set.

Sensor

Serial#

polarity

calibration factor

LVDT V1

negative

-0.149 [um/cnt]

LVDT V2

positive

0.138 [um/cnt]

LVDT V3

negative

-0.135 [um/cnt]

LVDT H1

positive

0.154 [um/cnt]

LVDT H2

positive

0.146 [um/cnt]

LVDT H3

positive

0.150 [um/cnt]

Actuator coils

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu).

Polarity & Calibration Factor

  • V: postive means upward (TMS-VIS moves in upward by inputting positive value to the act coils from MEDM)
  • H: positive means plus yaw (TMS-VIS moves in counter clock wise from top view by inputting positive value to the act coils from MEDM)

Actuator

polarity

Serial#

COIL V1

positive

COIL V2

positive

COIL V3

positive

COIL H1

negative (obsolete) ->

COIL H2

positive (obsolete)->

COIL H3

positive (obsolete) ->

Geophones

Serical# of L-4C

Vert/Horiz

Naming of the assembled unit

Assembler

404080975

Vert

404080976

Vert

TMS-VISX: Geo-V2

Akutsu

404080977

Vert

404080978

Vert

404084240

Vert

404084241

Vert

TMS-VISX: Geo-V3

Akutsu

404084242

Vert

TMS-VISX: Geo-V1

Fujii -> Akutsu

2

Horiz

TMS-VISX: Geo-H3

Akutsu -> Uraguchi

3

Horiz

4

Horiz

TMS-VISX: Geo-H1

Akutsu

5

Horiz

TMS-VISX: Geo-H2

Akutsu

15

Horiz

16

Horiz

17

Horiz

Cabling

  • LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • PTFE cables

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)