Differences between revisions 60 and 62 (spanning 2 versions)
Revision 60 as of 2018-10-02 23:19:04
Size: 5773
Comment:
Revision 62 as of 2018-10-24 19:00:52
Size: 6011
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS) = = Transmission Monitor's Vibration Isolation Stage for X: preparation (TMS-VISX) =
Line 31: Line 31:
|| LVDT V1 || || negative ||-0.149 [um/cnt] ||
|| LVDT V2 || ||positive || 0.138 [um/cnt] ||
|| LVDT V3 || ||negative ||-0.135 [um/cnt] ||
|| LVDT H1 || ||positive || 0.154 [um/cnt] ||
|| LVDT H2 || ||positive || 0.146 [um/cnt] ||
|| LVDT H3 || ||positive || 0.150 [um/cnt] ||
|| LVDT V1 ||#4 || negative ||-0.149 [um/cnt] ||
|| LVDT V2 ||#5 ||positive || 0.138 [um/cnt] ||
|| LVDT V3 ||#6 ||negative ||-0.135 [um/cnt] ||
|| LVDT H1 ||#1 ||positive || 0.154 [um/cnt] ||
|| LVDT H2 ||#2 ||positive || 0.146 [um/cnt] ||
|| LVDT H3 ||#3 ||positive || 0.150 [um/cnt] ||
Line 59: Line 59:
|| COIL V1 || positive || ||
|| COIL V2 || positive || ||
|| COIL V3 || positive || ||
|| COIL H1 || negative (obsolete) -> || ||
|| COIL H2 || positive (obsolete)-> || ||
|| COIL H3 || positive (obsolete) -> || ||
|| COIL V1 || positive ||#10 ||
|| COIL V2 || positive ||#11 ||
|| COIL V3 || positive ||#12 ||
|| COIL H1 || negative (obsolete) -> ||#7(obsolete)-> #2 ||
|| COIL H2 || positive (obsolete)-> ||#8(obsolete) -> #4 ||
|| COIL H3 || positive (obsolete) -> ||#9(obsolete)-> #5 ||
Unfortunately, the actuator coils serial#7, 8, and 9 were broken during the transportation from Mitaka to Xend; their serial number won't be used eternally.

Transmission Monitor's Vibration Isolation Stage for X: preparation (TMS-VISX)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

<< <  2018 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

<< <  2018 / 8 >  >>
Mon Tue Wed Thu Fri Sat Sun
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

LVDTs

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu).

Polarity & Calibration Factor

  • V: postive means that the LVDT outputs positive counts when TMS-VIS moves upward, and so the calibration factors are set.
  • H: postive means that the LVDT outputs positive counts when TMS-VIS moves positive yaw (counter clock wise from top view), and so the calibration factors are set.

Sensor

Serial#

polarity

calibration factor

LVDT V1

#4

negative

-0.149 [um/cnt]

LVDT V2

#5

positive

0.138 [um/cnt]

LVDT V3

#6

negative

-0.135 [um/cnt]

LVDT H1

#1

positive

0.154 [um/cnt]

LVDT H2

#2

positive

0.146 [um/cnt]

LVDT H3

#3

positive

0.150 [um/cnt]

Actuator coils

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu).

Polarity & Calibration Factor

  • V: postive means upward (TMS-VIS moves in upward by inputting positive value to the act coils from MEDM)
  • H: positive means plus yaw (TMS-VIS moves in counter clock wise from top view by inputting positive value to the act coils from MEDM)

Actuator

polarity

Serial#

COIL V1

positive

#10

COIL V2

positive

#11

COIL V3

positive

#12

COIL H1

negative (obsolete) ->

#7(obsolete)-> #2

COIL H2

positive (obsolete)->

#8(obsolete) -> #4

COIL H3

positive (obsolete) ->

#9(obsolete)-> #5

Unfortunately, the actuator coils serial#7, 8, and 9 were broken during the transportation from Mitaka to Xend; their serial number won't be used eternally.

Geophones

Serical# of L-4C

Vert/Horiz

Naming of the assembled unit

Assembler

404080975

Vert

404080976

Vert

TMS-VISX: Geo-V2

Akutsu

404080977

Vert

404080978

Vert

404084240

Vert

404084241

Vert

TMS-VISX: Geo-V3

Akutsu

404084242

Vert

TMS-VISX: Geo-V1

Fujii -> Akutsu

2

Horiz

TMS-VISX: Geo-H3

Akutsu -> Uraguchi

3

Horiz

4

Horiz

TMS-VISX: Geo-H1

Akutsu

5

Horiz

TMS-VISX: Geo-H2

Akutsu

15

Horiz

16

Horiz

17

Horiz

Cabling

  • LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • PTFE cables

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)