605
Comment:
|
748
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* | * 「図3_EXT,EYTの位置.pptx」 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7775|道村くんの計算]] |
Transmission Monitor (TMS) at EYT (Phase 1)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
- 「図3_EXT,EYTの位置.pptx」
Task list
Note: some of the tasks can be done in parallel.
- Place/install the fixed stage.
- Needs some shims... but what is the required horizontalness?
- Place/install the BRT
- What is the references...?
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |