Size: 811
Comment:
|
Size: 953
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8117|Alignment Plan for TRY Optical Table in bKAGRA Phase 1]] |
Transmission Monitor (TMS) at EYT (Phase 1)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
- 「図3_EXT,EYTの位置.pptx」
Interferometer Layout for Both IR and Green Beams, With and Without ITMs (Michimura)
Task list
Note: some of the tasks can be done in parallel.
- Place/install the fixed stage.
- Needs some shims... but what is the required horizontalness?
- Place/install the BRT
- What is the references...?
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |