Differences between revisions 8 and 9
Revision 8 as of 2018-03-28 20:28:04
Size: 953
Comment:
Revision 9 as of 2018-03-28 21:24:04
Size: 1166
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8117|Alignment Plan for TRY Optical Table in bKAGRA Phase 1]]  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8117|Alignment Plan for TRY Optical Table in bKAGRA Phase 1 (Michimura)]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7768|KAGRA 用Transmission Monitor System の開発 (Morozumi)]]
 * "両角_光学系レイアウト_v4.pdf" (Morozumi)

Transmission Monitor (TMS) at EYT (Phase 1)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  

<< <  2018 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the fixed stage.
    • Needs some shims... but what is the required horizontalness?
  • Place/install the BRT
    • What is the references...?

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMSY1 (last edited 2018-09-06 18:25:03 by TomotadaAkutsu)