Transmission Monitor (TMS) with a fixed stage at EYT in 2018 Spring
TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
Task list
Note: some of the tasks can be done in parallel.
- Place/install the fixed stage.
- Needs some shims... but what is the required horizontalness?
- Place/install the BRT
- What is the references...?