Transmission Monitor (TMS) at EYT (Phase 1)
- With a fixed stage.
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
KAGRA/subgroup/AOS/TMSY1/2018-03-13 |
---|
20180313 |
KAGRA/subgroup/AOS/TMSY1/2018-03-14 |
---|
20180314 |
KAGRA/subgroup/AOS/TMSY1/2018-03-15 |
---|
20180315 |
KAGRA/subgroup/AOS/TMSY1/2018-03-20 |
---|
20180320 |
KAGRA/subgroup/AOS/TMSY1/2018-03-21 |
---|
20180321 |
KAGRA/subgroup/AOS/TMSY1/2018-03-22 |
---|
20180322 |
KAGRA/subgroup/AOS/TMSY1/2018-03-27 |
---|
20180327 |
KAGRA/subgroup/AOS/TMSY1/2018-03-28 |
---|
20180328 |
KAGRA/subgroup/AOS/TMSY1/2018-03-29 |
---|
20180329 |
KAGRA/subgroup/AOS/TMSY1/2018-03-30 |
---|
20180330 |
|
KAGRA/subgroup/AOS/TMSY1/2018-04-03 |
---|
20180403 |
KAGRA/subgroup/AOS/TMSY1/2018-04-04 |
---|
20180404 |
KAGRA/subgroup/AOS/TMSY1/2018-04-05 |
---|
20180405 |
KAGRA/subgroup/AOS/TMSY1/2018-04-12 |
---|
20180412 |
|
Links to knowledge
Task list
Note: some of the tasks can be done in parallel.
- Place/install the fixed stage.
- Needs some shims... but what is the required horizontalness?
- Place/install the BRT
- What is the references...?
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |