12346
Comment:
|
13051
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
=== Engineering run started === * Please go to ERun top page: [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] ------ |
|
Line 9: | Line 13: |
||<10%> Quick Links: ||<:10% #ffdcdc> [[KAGRA/KSC/FAQ|FAQ]] ||<:10% #FFFD8C>[[KAGRA/KSC|KSC page]] ||<:10% #FFFD8C>[[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] ||<:10% #FFFD8C>[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019Dec|F2F Dec 2019]] || | ||<10%> Quick Links: ||<:10% #ffdcdc> [[KAGRA/KSC/FAQ|FAQ]] ||<:10% #ffdcdc>[[KAGRA/KSC|KSC page]] ||<:10% #FFFD8C>[[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] ||<:10% #FFFD8C>[[LCGT/Meeting/f2f/2019Dec|F2F Dec 2019]]||<:10% #ffdcdc> [[KAGRA/KSC/YourActionRequired|YourActionRequired]] || || || [[KAGRA/KSC/FAQ#Level0|Join KAGRA]] || || || Registration closed || || |
Line 15: | Line 20: |
* [[KAGRA/KSC/O3|Observation 3 information page]] ([[KAGRA/KSC/O3#Schedule|Schedule & News]] / [[KAGRA/KSC/O3#action|Your action items]] / [[KAGRA/KSC/O3#MOU|Collaboration MoU]] / [[KAGRA/KSC/O3#Commit|Commitment form]]) | [[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] information pages, and [[KAGRA/KSC/YourActionRequired|YourActionRequired]], [[KAGRA/CollaborationMOU|Collaboration MoU]], [[KAGRA/KSC/O3CommitmentForm|O3CommitmentForm]] pages are now separated. |
Line 17: | Line 22: |
* '''The 24th KAGRA Face-to-Face meeting''': at RESCEU, Univ. Tokyo, 2019 December 4 (Wed) - 5 (Thur). [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019Dec| web site ]] is open. [[https://gwcenter.icrr.u-tokyo.ac.jp| Registration page ]] is open. (deadline November 26, 23:59 JST). * '''KSC telecon''' before F2F, November 22 (Fri) 17:00 JST via [[https://zoom.us/j/5045179604|Zoom3]]. |
* '''The 2020 March LIGO-VIRGO-KAGRA meeting''': at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur). [[https://cgca.uwm.edu/events/2020lvc| web site ]] is open. Registration is open. Early bird by Jan 8, close Feb 14. * '''The 25th KAGRA Face-to-Face meeting''': at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun). [[LCGT/Meeting/f2f/2020Apr| web site ]] is open. Registration is not open. |
Line 22: | Line 28: |
* The 23rd KAGRA Face-to-Face meeting: at Univ. Toyama, 2019 August 22 (Thur) - 24 (Sat). [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019August| web site ]] * We had 137 participants. Thank you for your contributions. |
* KSC Remote Meeting (KSC telecon) before F2F, November 22 (Fri) 17:00 JST. See [[KAGRA/KSC/Meeting|Agenda]] * The 24th KAGRA Face-to-Face meeting: at RESCUE, 2019 December 4 (Wed) - 5 (Thur). [[LCGT/Meeting/f2f/2019Dec| web site ]] /* The 23rd KAGRA Face-to-Face meeting: at Univ. Toyama, 2019 August 22 (Thur) - 24 (Sat). [[LCGT/Meeting/f2f/2019August| web site ]] */ /* We had 140 participants. Thank you for your contributions. */ |
Line 29: | Line 37: |
* [[KAGRA/Meeting/Reviews/PAB|Program Advisory Committee (PAB)]] was held at ICRR, Kashiwa campus on May 9(Thur) to 10(Fri), 2019 * The 6th KAGRA International workshop: at Wuhan, China, 2019 June 21 (Fri) - 23 (Sun). [[http://kiw6.csp.escience.cn/ |web site]] |
/* [[KAGRA/Meeting/Reviews/PAB|Program Advisory Committee (PAB)]] was held at ICRR, Kashiwa campus on May 9(Thur) to 10(Fri), 2019 */ /* The 6th KAGRA International workshop: at Wuhan, China, 2019 June 21 (Fri) - 23 (Sun). [[http://kiw6.csp.escience.cn/ |web site]] */ |
Line 43: | Line 51: |
||<#F0F0FF>'''Meetings''' ||[[KAGRA/Meeting/Collaboration|KAGRA collaboration meeting]] <<BR>> [[KAGRA/Meeting/F2F|KAGRA f2f meeting]] <<BR>> [[KAGRA/Meeting/KIW|KAGRA International Workshop]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtchief/|Chief Meeting blog]] ([[KAGRA/Meeting/Chief|Old Chief Meeting]]) <<BR>> [[KAGRA/Meeting/Reviews|Reviews]]<<BR>> [[LCGT/ELiTES|ET-KAGRA collaboration (ELiTES)]] <<BR>> [[KAGRA/Meetings/events|Related events]] ||<#F0F0FF>'''Documents'''<<BR>>'''/Information''' ||[[http://klog.icrr.u-tokyo.ac.jp/osl/|KAGRA log]] (klog) <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]]<<BR>>[[KAGRA/DesignDocumentTree|KAGRA Design Document Tree]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|Blogs]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]]<<BR>>[[http://172.16.33.20/bugzilla/|Bugzilla]] -- issue tracker (internal only)<<BR>> [[KAGRA/MOU|MOU]]<<BR>> [[KAGRA/Terminology|Terminology]]<<BR>>[[KAGRA/Publications|Publications]] <<BR>> [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8205|Collaboration Member list]]|| | ||<#F0F0FF>'''Meetings''' ||[[KAGRA/Meeting/Collaboration|KAGRA collaboration meeting]] <<BR>> [[KAGRA/Meeting/F2F|KAGRA f2f meeting]] <<BR>> [[KAGRA/Meeting/KIW|KAGRA International Workshop]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtchief/|Chief Meeting blog]] ([[KAGRA/Meeting/Chief|Old Chief Meeting]]) <<BR>> [[KAGRA/Meeting/Reviews|Reviews]]<<BR>> [[LCGT/ELiTES|ET-KAGRA collaboration (ELiTES)]] <<BR>> [[KAGRA/Meetings/events|Related events]] ||<#F0F0FF>'''Documents'''<<BR>>'''/Information''' ||[[http://klog.icrr.u-tokyo.ac.jp/osl/|KAGRA log]] (klog) <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]]<<BR>>[[KAGRA/DesignDocumentTree|KAGRA Design Document Tree]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|Blogs]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]]<<BR>>[[http://172.16.33.20/bugzilla/|Bugzilla]] -- issue tracker (internal only)<<BR>> [[KAGRA/MOU|MOU]]<<BR>> [[KAGRA/Terminology|Terminology]]<<BR>>[[KAGRA/Publications|Publications]] <<BR>> [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8205|Collaboration Member list]]<<BR>>[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Operation/Manuals|Operation Manuals]]|| |
Line 47: | Line 55: |
||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) || | ||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) || |
Line 59: | Line 67: |
||<#F0FFF0>'''KSC newsletter''' ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10543| No.5 (2019 August)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10057| No.4 (2019 April)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=9350| No.3 (2018 December)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=8559| No.2 (2018 August)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=8122| No.1 (2018 April)]]|| | ||<#F0FFF0>'''KSC newsletter''' ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=11020| No.6 (2019 December)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10543| No.5 (2019 August)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10057| No.4 (2019 April)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=9350| No.3 (2018 December)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=8559| No.2 (2018 August)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=8122| No.1 (2018 April)]]|| |
Line 95: | Line 103: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From April 1, 2018 (JR from March 17, 2018))]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From April 1, 2019 (JR from March 16, 2019))]] |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From December 12, 2019)]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From December 12, 2019)]] |
KAGRA Wiki
Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.
Engineering run started
Please go to ERun top page: ER191217-24
Contents in this page
Quick Links:
Registration closed
News
FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.
O3a, O3b information pages, and YourActionRequired, Collaboration MoU, O3CommitmentForm pages are now separated.
- Coming meetings
The 2020 March LIGO-VIRGO-KAGRA meeting: at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur).
web site is open. Registration is open. Early bird by Jan 8, close Feb 14.
The 25th KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun).
web site is open. Registration is not open.
- Recent meetings
ICRR's Fiscal Year 2020 Inter-University Research Program English page, Japanese page (application deadline: January 7, 2020)
[1] Links
Meetings |
KAGRA collaboration meeting |
Documents |
KAGRA log (klog) |
Task management |
Site Shift schedule |
Tools |
How to upload documents to JGWDoc (Japanese, English) |
Commissioning |
Engineering Run |
Observation |
Observation top |
Safety and Activity Control |
[2] KSC contents
KSC = KAGRA Scientific Congress
KSC |
|
KSC newsletter |
No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April) |
Rules and Regulations |
KAGRA Data Analysis Working Group
Data Analysis Working Group |
|
Data Analysis Committee |
|
Working Groups |
CBC |
KAGRA Documents
Interface Control Document (ICD) (Also see Interface Control wiki)
FAQ (frequently asked questions) to the KAGRA collaboration (under editing)
CPC publication policy (inc. the procedure to submit for the JSPS meetings)
[3] Site Access information
ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.
- Accommodation during KAGRA stay: YUKI house in Kamioka / Locomotion in Osawano:
- YUKI house
- Locomotion
How to take garbage away in KAGRA site (in Japanese): Manual
How to work at the KAGRA site?
Material of morning meeting in the Dropbox folder (in Japanese): Take a file named today's date.
Application to enter the KAGRA mine: Application page
How to purchase items you need (in Japanese): Proceedure
Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form
1F TV meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page
2F meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page
Reservation for Zoom
Reservation for the Koach Filters
Technical information
Table of KAGRA location (Table)
[4] Subsystems
Subgroups
|
Subgroup name |
Links |
||
0 |
System Integration |
--- |
|
|
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
||
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
16 |
Detector Characterization |
DET |
||
17 |
Calibration |
CAL |
|
|
18 |
Physical Environment Monitors |
PEM |
|
|
** |
Advanced R&D |
|
|
|
** |
NAOJ Test alog |
(NAOJ) |
|
** |
KAGRA Stock in Shelfs |
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
[5] Other information
Target Sensitivity of bKAGRA
Sensitivity data can be downloaded from JGW-T1707038
Website about the KAGRA sensitivity is here.
Parameter list is here.
Others
Misc. (tools, past discussions, etc.)
Materials for Visitors Slides, Posters etc. to guide visitors of KAGRA
KAGRA CG Illustrations Stunning CG Illustrations by Rey.Hori