12898
Comment:
|
13651
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* Engineering run started. Go to ERun Top page: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24|ER191217-24]] | === KAGRA detector === * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12961|394 kpc]], February 14! Oops, the [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12994|factor 1.5]] was missing, 600 kpc. |
Line 9: | Line 10: |
Line 11: | Line 13: |
||<10%> Quick Links: ||<:10% #ffdcdc> [[KAGRA/KSC/FAQ|FAQ]] ||<:10% #ffdcdc>[[KAGRA/KSC|KSC page]] ||<:10% #FFFD8C>[[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] ||<:10% #FFFD8C>[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019Dec|F2F Dec 2019]]||<:10% #ffdcdc> [[KAGRA/KSC/YourActionRequired|YourActionRequired]] || | ||<10%> Quick Links: ||<:10% #ffdcdc> [[KAGRA/KSC/FAQ|FAQ]] ||<:10% #ffdcdc>[[KAGRA/KSC|KSC page]] ||<:10% #FFFD8C>[[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] ||<:10% #FFFD8C>[[LCGT/Meeting/f2f/2019Dec|F2F Dec 2019]]||<:10% #ffdcdc> [[KAGRA/KSC/YourActionRequired|YourActionRequired]] || |
Line 16: | Line 18: |
* '''Application to the KAGRA Author List 2019''', by February 28. See [kagra 03345] [[https://gwcenter.icrr.u-tokyo.ac.jp/co-author-appli|apply from here]]. | |
Line 20: | Line 22: |
* '''The 25th KAGRA Face-to-Face meeting''': at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun). [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2020Apr| web site ]] is open. Registration is not open. |
* '''The 2020 March LIGO-VIRGO-KAGRA meeting''': at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur). [[https://cgca.uwm.edu/events/2020lvc| web site ]] is open. Registration is open. Early bird by Jan 8, close Feb 14. * '''The 25th KAGRA Face-to-Face meeting''': at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun). [[LCGT/Meeting/f2f/2020Apr| web site ]] is open. Registration is not open. |
Line 23: | Line 27: |
* Recent meetings * KSC Remote Meeting (KSC telecon) before F2F, November 22 (Fri) 17:00 JST. See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/KSC/Meeting|Agenda]] * The 23rd KAGRA Face-to-Face meeting: at Univ. Toyama, 2019 August 22 (Thur) - 24 (Sat). [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2019August| web site ]] * We had 140 participants. Thank you for your contributions. |
* Postponement of meetings * The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020. * GWADW at Hokkaido (planned in the middle of May, 2020) was postponed a year. /* Recent meetings */ /* KSC Remote Meeting (KSC telecon) before F2F, November 22 (Fri) 17:00 JST. See [[KAGRA/KSC/Meeting|Agenda]] */ /* The 24th KAGRA Face-to-Face meeting: at RESCUE, 2019 December 4 (Wed) - 5 (Thur). [[LCGT/Meeting/f2f/2019Dec| web site ]] */ /* The 23rd KAGRA Face-to-Face meeting: at Univ. Toyama, 2019 August 22 (Thur) - 24 (Sat). [[LCGT/Meeting/f2f/2019August| web site ]] */ /* We had 140 participants. Thank you for your contributions. */ |
Line 32: | Line 40: |
* [[KAGRA/Meeting/Reviews/PAB|Program Advisory Committee (PAB)]] was held at ICRR, Kashiwa campus on May 9(Thur) to 10(Fri), 2019 * The 6th KAGRA International workshop: at Wuhan, China, 2019 June 21 (Fri) - 23 (Sun). [[http://kiw6.csp.escience.cn/ |web site]] |
/* [[KAGRA/Meeting/Reviews/PAB|Program Advisory Committee (PAB)]] was held at ICRR, Kashiwa campus on May 9(Thur) to 10(Fri), 2019 */ /* The 6th KAGRA International workshop: at Wuhan, China, 2019 June 21 (Fri) - 23 (Sun). [[http://kiw6.csp.escience.cn/ |web site]] */ |
Line 40: | Line 48: |
* ICRR's Fiscal Year 2020 Inter-University Research Program [[http://www.icrr.u-tokyo.ac.jp/2019/10/31112335.html|English page]], [[http://www.icrr.u-tokyo.ac.jp/2019/10/31115033.html|Japanese page]] (application deadline: January 7, 2020) | /* ICRR's Fiscal Year 2020 Inter-University Research Program [[http://www.icrr.u-tokyo.ac.jp/2019/10/31112335.html|English page]], [[http://www.icrr.u-tokyo.ac.jp/2019/10/31115033.html|Japanese page]] (application deadline: January 7, 2020) */ |
Line 50: | Line 58: |
||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24|ER191217-24]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) || | ||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] <<BR>> [[KAGRA/EngineeringRun/ER200220-25|ER200220-25]] ||<#F0FFF0>'''KAGRA-JRPC''' || [[KAGRA/EngineeringRun/kagra-jrpc|20-01-24]] <<BR>> [[KAGRA/EngineeringRun/kagra-jrpc|20-02-20]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) || |
Line 99: | Line 107: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From December 12, 2019)]] |
KAGRA Wiki
Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.
KAGRA detector
new record 394 kpc, February 14! Oops, the factor 1.5 was missing, 600 kpc.
Contents in this page
Quick Links:
Registration closed
News
Application to the KAGRA Author List 2019, by February 28. See [kagra 03345] apply from here.
FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.
O3a, O3b information pages, and YourActionRequired, Collaboration MoU, O3CommitmentForm pages are now separated.
- Coming meetings
The 2020 March LIGO-VIRGO-KAGRA meeting: at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur).
web site is open. Registration is open. Early bird by Jan 8, close Feb 14.
The 25th KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun).
web site is open. Registration is not open.
- Postponement of meetings
- The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020.
- GWADW at Hokkaido (planned in the middle of May, 2020) was postponed a year.
[1] Links
Meetings |
KAGRA collaboration meeting |
Documents |
KAGRA log (klog) |
Task management |
Site Shift schedule |
Tools |
How to upload documents to JGWDoc (Japanese, English) |
Commissioning |
Engineering Run |
KAGRA-JRPC |
Observation |
Observation top |
Safety and Activity Control |
[2] KSC contents
KSC = KAGRA Scientific Congress
KSC |
|
KSC newsletter |
No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April) |
Rules and Regulations |
KAGRA Data Analysis Working Group
Data Analysis Working Group |
|
Data Analysis Committee |
|
Working Groups |
CBC |
KAGRA Documents
Interface Control Document (ICD) (Also see Interface Control wiki)
FAQ (frequently asked questions) to the KAGRA collaboration (under editing)
CPC publication policy (inc. the procedure to submit for the JSPS meetings)
[3] Site Access information
ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.
- Accommodation during KAGRA stay: YUKI house in Kamioka / Locomotion in Osawano:
- YUKI house
- Locomotion
How to take garbage away in KAGRA site (in Japanese): Manual
How to work at the KAGRA site?
Material of morning meeting in the Dropbox folder (in Japanese): Take a file named today's date.
Application to enter the KAGRA mine: Application page
How to purchase items you need (in Japanese): Proceedure
Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form
1F TV meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page
2F meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page
Reservation for Zoom
Reservation for the Koach Filters
Technical information
Table of KAGRA location (Table)
[4] Subsystems
Subgroups
|
Subgroup name |
Links |
||
0 |
System Integration |
--- |
|
|
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
||
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
16 |
Detector Characterization |
DET |
||
17 |
Calibration |
CAL |
|
|
18 |
Physical Environment Monitors |
PEM |
|
|
** |
Advanced R&D |
|
|
|
** |
NAOJ Test alog |
(NAOJ) |
|
** |
KAGRA Stock in Shelfs |
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
[5] Other information
Target Sensitivity of bKAGRA
Sensitivity data can be downloaded from JGW-T1707038
Website about the KAGRA sensitivity is here.
Parameter list is here.
Others
Misc. (tools, past discussions, etc.)
Materials for Visitors Slides, Posters etc. to guide visitors of KAGRA
KAGRA CG Illustrations Stunning CG Illustrations by Rey.Hori