12803
Comment:
|
15335
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
== Engineering run started == *Go to ERun top page: [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] |
== Present Status of KAGRA == * Solo '''Observation Run''' (Feb 25, 2020 -- March 10, 2020) see [[KAGRA/KSC/O3b|O3b]] page. * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13285|442 kpc]], March 3. * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13339|500 kpc]], March 5. * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13432|594 kpc]], [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=13392|locked 10h 28m]], March 9. * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13681|655 kpc]], March 18. * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13799|883 kpc]], March 25. * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13840|959 kpc]], March 26. |
Line 10: | Line 16: |
Line 16: | Line 23: |
Line 17: | Line 25: |
* LIGO Data Grid access is available. See [kagra 03375] and [[https://wiki.ligo.org/AuthProject/KagraLDG|here]]. * '''Application to access account for LVC resources'''. See [kagra 03376] and apply from [[https://docs.google.com/forms/d/1QEmvOl5UnvilqMyoN4CLIiaeib7PL7zXLiWGNaoBCrM/edit?usp=sharing|here]]. /* '''Application to the KAGRA Author List 2019''', by '''March 6''' (extended). See [kagra 03345] [[https://gwcenter.icrr.u-tokyo.ac.jp/co-author-appli|apply from here]]. */ |
|
Line 21: | Line 31: |
* '''The 25th KAGRA Face-to-Face meeting''': at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun). [[LCGT/Meeting/f2f/2020Apr| web site ]] is open. Registration is not open. |
* '''The 2020 March LIGO-VIRGO-KAGRA telecon''': starts March 13 (Fri) 00:00 JST, 90 minutes Status of LIGO, Virgo, KAGRA, GEO, and else. The agenda is [[https://dcc.ligo.org/cgi-bin/private/DocDB/DisplayMeeting?conferenceid=1064|here]] (requires password). The Zoom meeting access from [[https://zoom.us/j/213885565?pwd=NnIyUzVyRGkreUs5T3diYk53Nm9nUT09|here]]. Meeting ID and password were circulated by e-mail March 10. |
Line 24: | Line 37: |
* Recent meetings * KSC Remote Meeting (KSC telecon) before F2F, November 22 (Fri) 17:00 JST. See [[KAGRA/KSC/Meeting|Agenda]] * The 24th KAGRA Face-to-Face meeting: at RESCUE, 2019 December 4 (Wed) - 5 (Thur). [[LCGT/Meeting/f2f/2019Dec| web site ]] |
* '''KAGRA telecon''': May 27 (Wed) & 28 (Thur), 2020 @ Zoom3 Alternative to the cancelled Face-to-Face meeting, we will have a telecon for two days, on May 27 and 28. See [[KAGRA/Meeting/F2F|F2F]] page * '''The 2020 March LIGO-VIRGO-KAGRA meeting''': at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur). [[https://cgca.uwm.edu/events/2020lvc| web site ]] Note that '''the meeting was cancelled due to the current worldwide outbreak of coronavirus'''. see [kagra 03386]. * The KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun). '''This meeting was cancelled due to the current worldwide outbreak of coronavirus'''. * Postponement of meetings * The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020. * GWADW at Hokkaido (planned in the middle of May, 2020) is postponed a year. /* Recent meetings */ /* KSC Remote Meeting (KSC telecon) before F2F, November 22 (Fri) 17:00 JST. See [[KAGRA/KSC/Meeting|Agenda]] */ /* The 24th KAGRA Face-to-Face meeting: at RESCUE, 2019 December 4 (Wed) - 5 (Thur). [[LCGT/Meeting/f2f/2019Dec| web site ]] */ |
Line 42: | Line 68: |
* ICRR's Fiscal Year 2020 Inter-University Research Program [[http://www.icrr.u-tokyo.ac.jp/2019/10/31112335.html|English page]], [[http://www.icrr.u-tokyo.ac.jp/2019/10/31115033.html|Japanese page]] (application deadline: January 7, 2020) | /* ICRR's Fiscal Year 2020 Inter-University Research Program [[http://www.icrr.u-tokyo.ac.jp/2019/10/31112335.html|English page]], [[http://www.icrr.u-tokyo.ac.jp/2019/10/31115033.html|Japanese page]] (application deadline: January 7, 2020) */ |
Line 52: | Line 78: |
||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) || | ||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] <<BR>> [[KAGRA/EngineeringRun/ER200220-25|ER200220-25]] <<BR>> [[KAGRA/EngineeringRun/ER200401-0407|ER200401-0407]]||<#F0FFF0>'''KAGRA-JRPC''' || [[KAGRA/EngineeringRun/kagra-jrpc|20-01-24]] <<BR>> [[KAGRA/EngineeringRun/kagra-jrpc|20-02-20]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) <<BR>> [[KAGRA/Observation/KAGRA-1|KAGRA 1st observation]](2020/2/25-3/10, 4/7-4/21) || |
Line 100: | Line 126: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From December 12, 2019)]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From December 12, 2019)]] |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From April 1, 2020)]] |
KAGRA Wiki
Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.
Present Status of KAGRA
Solo Observation Run (Feb 25, 2020 -- March 10, 2020) see O3b page.
new record 442 kpc, March 3.
new record 500 kpc, March 5.
new record 594 kpc, locked 10h 28m, March 9.
new record 655 kpc, March 18.
new record 883 kpc, March 25.
new record 959 kpc, March 26.
Contents in this page
Quick Links:
Registration closed
News
LIGO Data Grid access is available. See [kagra 03375] and here.
Application to access account for LVC resources. See [kagra 03376] and apply from here.
FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.
O3a, O3b information pages, and YourActionRequired, Collaboration MoU, O3CommitmentForm pages are now separated.
- Coming meetings
The 2020 March LIGO-VIRGO-KAGRA telecon: starts March 13 (Fri) 00:00 JST, 90 minutes
KAGRA telecon: May 27 (Wed) & 28 (Thur), 2020 @ Zoom3
- Alternative to the cancelled Face-to-Face meeting, we will have a telecon for two days, on May 27 and 28.
See F2F page
- Alternative to the cancelled Face-to-Face meeting, we will have a telecon for two days, on May 27 and 28.
The 2020 March LIGO-VIRGO-KAGRA meeting: at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur).
web site Note that the meeting was cancelled due to the current worldwide outbreak of coronavirus. see [kagra 03386].
- The KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun).
This meeting was cancelled due to the current worldwide outbreak of coronavirus.
- Postponement of meetings
- The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020.
- GWADW at Hokkaido (planned in the middle of May, 2020) is postponed a year.
[1] Links
Meetings |
KAGRA collaboration meeting |
Documents |
KAGRA log (klog) |
Task management |
Site Shift schedule |
Tools |
How to upload documents to JGWDoc (Japanese, English) |
Commissioning |
Engineering Run |
KAGRA-JRPC |
Observation |
Observation top |
Safety and Activity Control |
[2] KSC contents
KSC = KAGRA Scientific Congress
KSC |
|
KSC newsletter |
No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April) |
Rules and Regulations |
KAGRA Data Analysis Working Group
Data Analysis Working Group |
|
Data Analysis Committee |
|
Working Groups |
CBC |
KAGRA Documents
Interface Control Document (ICD) (Also see Interface Control wiki)
FAQ (frequently asked questions) to the KAGRA collaboration (under editing)
CPC publication policy (inc. the procedure to submit for the JSPS meetings)
[3] Site Access information
ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.
- Accommodation during KAGRA stay: YUKI house in Kamioka / Locomotion in Osawano:
- YUKI house
- Locomotion
How to take garbage away in KAGRA site (in Japanese): Manual
How to work at the KAGRA site?
Material of morning meeting in the Dropbox folder (in Japanese): Take a file named today's date.
Application to enter the KAGRA mine: Application page
How to purchase items you need (in Japanese): Proceedure
Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form
1F TV meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page
2F meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page
Reservation for Zoom
Reservation for the Koach Filters
Technical information
Table of KAGRA location (Table)
[4] Subsystems
Subgroups
|
Subgroup name |
Links |
||
0 |
System Integration |
--- |
|
|
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
||
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
16 |
Detector Characterization |
DET |
||
17 |
Calibration |
CAL |
|
|
18 |
Physical Environment Monitors |
PEM |
|
|
** |
Advanced R&D |
|
|
|
** |
NAOJ Test alog |
(NAOJ) |
|
** |
KAGRA Stock in Shelfs |
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
[5] Other information
Target Sensitivity of bKAGRA
Sensitivity data can be downloaded from JGW-T1707038
Website about the KAGRA sensitivity is here.
Parameter list is here.
Others
Misc. (tools, past discussions, etc.)
Materials for Visitors Slides, Posters etc. to guide visitors of KAGRA
KAGRA CG Illustrations Stunning CG Illustrations by Rey.Hori