Line 3: Line 3:
Information for researchers. For general information, please go to [[https://gwcenter.icrr.u-tokyo.ac.jp/en/|https://gwcenter.icrr.u-tokyo.ac.jp]].
----

== Present Status of KAGRA ==
 * Solo '''Observation Run''' (Feb 25, 2020 -- March 10, 2020) see [[KAGRA/KSC/O3b|O3b]] page.
 * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13285|442 kpc]], March 3.
 * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13339|500 kpc]], March 5.
 * new record [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13432|594 kpc]], March 9.

------

 ||<10%> Contents in this page ||<:10% #FFFD8C> [[#links| [1] Links]] ||<:10% #FFFD8C>[[#KSC|[2] KSC contents]]||<:10% #FFFD8C>[[#access|[3] Site Access]]||<:10% #FFFD8C>[[#subsystems|[4] Subsystems]]||<:10% #FFFD8C>[[#others|[5] Other information]]||
 || || || || || || ||
 ||<10%> Quick Links: ||<:10% #ffdcdc> [[KAGRA/KSC/FAQ|FAQ]] ||<:10% #ffdcdc>[[KAGRA/KSC|KSC page]] ||<:10% #FFFD8C>[[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] ||<:10% #FFFD8C>[[LCGT/Meeting/f2f/2019Dec|F2F Dec 2019]]||<:10% #ffdcdc> [[KAGRA/KSC/YourActionRequired|YourActionRequired]] ||
 || || [[KAGRA/KSC/FAQ#Level0|Join KAGRA]] || || || Registration closed || ||
Line 4: Line 20:
Line 5: Line 22:
 * LIGO Data Grid access is available. See [kagra 03375] and [[https://wiki.ligo.org/AuthProject/KagraLDG|here]].
 * '''Application to access account for LVC resources'''. See [kagra 03376] and apply from [[https://docs.google.com/forms/d/1QEmvOl5UnvilqMyoN4CLIiaeib7PL7zXLiWGNaoBCrM/edit?usp=sharing|here]].
 * '''Application to the KAGRA Author List 2019''', by '''March 6''' (extended). See [kagra 03345] [[https://gwcenter.icrr.u-tokyo.ac.jp/co-author-appli|apply from here]].
 * [[KAGRA/KSC/FAQ|FAQ]] (Frequently Asked Question page) is open. The sample of [[KAGRA/KSC/FAQ#acknowledgment |Acknowledgment]].
   [[KAGRA/KSC/O3|O3a]], [[KAGRA/KSC/O3b|O3b]] information pages, and [[KAGRA/KSC/YourActionRequired|YourActionRequired]], [[KAGRA/CollaborationMOU|Collaboration MoU]], [[KAGRA/KSC/O3CommitmentForm|O3CommitmentForm]] pages are now separated.
 * Coming meetings
   * '''The 2020 March LIGO-VIRGO-KAGRA telecon''': starts March 13 (Fri) 00:00 JST, 90 minutes
     Status of LIGO, Virgo, KAGRA, GEO, and else.
   * '''KAGRA telecon''': May 27 (Wed) & 28 (Thur), 2020 @ Zoom3
     Alternative to the cancelled Face-to-Face meeting, we will have a telecon for two days, on May 27 and 28.
     See [[KAGRA/Meeting/F2F|F2F]] page
Line 6: Line 34:
 . [[LCGT/Meeting/f2f/2012Aug|KAGRA f2f meeting]], July 30th - August 1st, 2012
   * '''The 2020 March LIGO-VIRGO-KAGRA meeting''': at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur).
     [[https://cgca.uwm.edu/events/2020lvc| web site ]] Note that '''the meeting was cancelled due to the current worldwide outbreak of coronavirus'''. see [kagra 03386].
   * The KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun).
     '''This meeting was cancelled due to the current worldwide outbreak of coronavirus'''.

 * Postponement of meetings
   * The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020.
   * GWADW at Hokkaido (planned in the middle of May, 2020) is postponed a year.
 /* Recent meetings */
   /* KSC Remote Meeting (KSC telecon) before F2F, November 22 (Fri) 17:00 JST. See [[KAGRA/KSC/Meeting|Agenda]] */
   /* The 24th KAGRA Face-to-Face meeting: at RESCUE, 2019 December 4 (Wed) - 5 (Thur). [[LCGT/Meeting/f2f/2019Dec| web site ]] */
   /* The 23rd KAGRA Face-to-Face meeting: at Univ. Toyama, 2019 August 22 (Thur) - 24 (Sat). [[LCGT/Meeting/f2f/2019August| web site ]] */
    /* We had 140 participants. Thank you for your contributions. */

   /* The [[https://gwcenter.icrr.u-tokyo.ac.jp/form|registration page]] will open July 16 (Tue). */
   /* deadline of registration with KAGRA-site tour : July 31, 2019 (23:59 JST) */
   /* deadline of registration : August 7, 2019 (23:59 JST) */
   /* See you in Toyama soon. Registration was closed. */
   /* [[KAGRA/Meeting/Reviews/PAB|Program Advisory Committee (PAB)]] was held at ICRR, Kashiwa campus on May 9(Thur) to 10(Fri), 2019 */
   /* The 6th KAGRA International workshop: at Wuhan, China, 2019 June 21 (Fri) - 23 (Sun). [[http://kiw6.csp.escience.cn/ |web site]] */
   /* The important deadlines are: */
   /* deadline of abstract and poster : May 20, 2019 */
   /* deadline of hotel reservation : June 1, 2019 */
   /* Oral presentation submission: January 13, 2019 */
   /* Poster submission: January 27, 2019 */

 /* ICRR's Fiscal Year 2020 Inter-University Research Program [[http://www.icrr.u-tokyo.ac.jp/2019/10/31112335.html|English page]], [[http://www.icrr.u-tokyo.ac.jp/2019/10/31115033.html|Japanese page]] (application deadline: January 7, 2020) */
Line 9: Line 64:
 . KAGRA website ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]]) <<Anchor(links)>>
== [1] Links ==
Line 11: Line 67:
||<style="background-color: #F0F0FF;text-align: center;">'''Meetings'''||[[KAGRA/Meeting/Collaboration|KAGRA collaboration meeting]] <<BR>> [[KAGRA/Meeting/F2F|KAGRA f2f meeting]] <<BR>> [[KAGRA/Meeting/Chief|Chief Meeting]] <<BR>> [[KAGRA/Meeting/Reviews|Reviews]]||<style="background-color: #F0F0FF;text-align: center;">'''Documents'''|| [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]]<<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|Blogs]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]]<<BR>> [[KAGRA/Terminology|Terminology]]||
||<style="background-color: #F0F0FF;text-align: center;">'''Special WG''''||[[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> ||<style="background-color: #F0F0FF;text-align: center;">'''Tools'''||KAGRA [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|conference calendar]]<<BR>> How to use [[LCGT/Meeting/EVOen|EVO]]<<BR>> How to upload documents to [[JGWDoc/HowTo/UpLoad|JGWDoc]]<<BR>> How to use [[LCGT/SVN|SVN]]<<BR>> How to join [[KAGRA/Tools/MailingLists|Mailing lists]]<<BR>> How to use this [[newusers|JGW Wiki]]||
||<#F0F0FF>'''Meetings''' ||[[KAGRA/Meeting/Collaboration|KAGRA collaboration meeting]] <<BR>> [[KAGRA/Meeting/F2F|KAGRA f2f meeting]] <<BR>> [[KAGRA/Meeting/KIW|KAGRA International Workshop]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtchief/|Chief Meeting blog]] ([[KAGRA/Meeting/Chief|Old Chief Meeting]]) <<BR>> [[KAGRA/Meeting/Reviews|Reviews]]<<BR>> [[LCGT/ELiTES|ET-KAGRA collaboration (ELiTES)]] <<BR>> [[KAGRA/Meetings/events|Related events]] ||<#F0F0FF>'''Documents'''<<BR>>'''/Information''' ||[[http://klog.icrr.u-tokyo.ac.jp/osl/|KAGRA log]] (klog) <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]]<<BR>>[[KAGRA/DesignDocumentTree|KAGRA Design Document Tree]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|Blogs]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]]<<BR>>[[http://172.16.33.20/bugzilla/|Bugzilla]] -- issue tracker (internal only)<<BR>> [[KAGRA/MOU|MOU]]<<BR>> [[KAGRA/Terminology|Terminology]]<<BR>>[[KAGRA/Publications|Publications]] <<BR>> [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8205|Collaboration Member list]]<<BR>>[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Operation/Manuals|Operation Manuals]]||
||<#F0F0FF>'''Task management''' ||[[KAGRA/Subgroups/SiteShift|Site Shift schedule]]<<BR>>[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6715|KAGRA organization chart]]<<BR>> [[http://gwlcgt.icrr.u-tokyo.ac.jp:13013/pwa|Project Chart page]]<<BR>> Reservation for the[[http://www.supersaas.jp/schedule/KoachFilter/Koach_Filter|KoachFilters]] ||<#F0F0FF>'''Tools''' ||How to upload documents to JGWDoc ([[JGWDoc/HowTo/UpLoad|Japanese]], [[JGWDoc/HowTo/UpLoadE|English]])<<BR>> How to use [[LCGT/SVN|SVN]]<<BR>> How to join [[KAGRA/Tools/MailingLists|Mailing lists]]<<BR>> How to use this JGW wiki ([[newusers|Japanese]], [[newusersE|English]])<<BR>> How to start using [[kloghelp|klog]]<<BR>> How to use [[RemoteParticipation|Remote participation tools]] ||


||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] <<BR>> [[KAGRA/EngineeringRun/ER200220-25|ER200220-25]] ||<#F0FFF0>'''KAGRA-JRPC''' || [[KAGRA/EngineeringRun/kagra-jrpc|20-01-24]] <<BR>> [[KAGRA/EngineeringRun/kagra-jrpc|20-02-20]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) ||

||<#ffdcdc>'''Safety and Activity Control''' ||[[KAGRA/Safety|Safety top]] ||[[http://172.16.32.254:86/live.html?src=1|Warning System (in UTnet)]]||[[http://172.16.32.230:86/live.html?src=1|Workers Monitoring (in UTnet)]]||[[https://gwcenter.icrr.u-tokyo.ac.jp/webinout | Collaborators Entrance Application]]||
Line 16: Line 77:
=== Subsystems === <<Anchor(KSC)>>
== [2] KSC contents ==
Line 18: Line 80:
||<style="background-color: #F0F0FF;text-align: center;">||||<style="background-color: #F0F0FF;text-align: center;">'''Subgroup name'''||||<style="background-color: #F0F0FF;text-align: center;">'''Links'''||
||1||Tunnel||TUN||[[KAGRA/Subgroups/TUN|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/tunnel/|blog]]||
||2||Facility||FCL|| ||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/facility/|blog]]||
||3||Vacuum||VAC||[[KAGRA/Subgroups/VAC|wiki]]|| ||
||4||Cryogenics||CRY||[[KAGRA/Subgroups/CRY|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/cryogenic/|blog]]||
||5||Vibration Isolation||VIS||[[KAGRA/Subgroups/VIS|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/vibrationisolation/|blog]]||
||6||Mirror||MIR||[[KAGRA/Subgroups/MIR|wiki]]|| ||
||7||Laser||LAS||[[KAGRA/Subgroups/LAS|wiki]]|| ||
||8||Main Interferometer||MIF||[[KAGRA/Subgroups/MIF|wiki]]|| ||
||9||Input/Output Optics||IOO||[[KAGRA/Subgroups/IOO|wiki]]|| ||
||10||Auxiliary Optics Subsystem||AOS||[[KAGRA/Subgroups/AOS|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/auxiliary/|blog]]||
||11||Analog Electronics||AEL||[[KAGRA/Subgroups/AEL|wiki]]|| ||
||12||Digital System||DGS||[[KAGRA/Subgroups/DGS|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/|blog]]||
||13||Data Analysis||DAS||[[KAGRA/Subgroups/DAS|wiki]]|| ||
||14||Geophysics Interferometer||GIF||[[KAGRA/Subgroups/GIF|wiki]]|| ||
||**||Detector Characterization||DC||[[KAGRA/Subgroups/DET|wiki]]||[[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/detectorcharacterization/|blog]]||
KSC = KAGRA Scientific Congress
Line 35: Line 82:
||<#F0FFF0>'''KSC''' ||[[KAGRA/KSC|KSC page]] ([[KAGRA/KSC#board|KSCboard]], [[KAGRA/KSC#committees|Committees]], [[KAGRA/KSC#Members|KSC members]]) ||
||<#F0FFF0>'''KSC newsletter''' ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=11020| No.6 (2019 December)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10543| No.5 (2019 August)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10057| No.4 (2019 April)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=9350| No.3 (2018 December)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=8559| No.2 (2018 August)]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=8122| No.1 (2018 April)]]||
||<#F0FFF0>'''Rules and Regulations''' ||[[KAGRA/KSC#regulations| links in KSC page]] ||
Line 36: Line 86:
=== KAGRA Data Analysis Working Group ===
||<#F0FFF0>'''Data Analysis Working Group''' ||[[KAGRA/DAWG|Data Analysis Working Group Top Page]] ||
||<#F0FFF0>'''Data Analysis Committee''' ||[[KAGRA/DAWG/DAC|Data Analysis Committee Top Page]] ||
||<#F0FFF0>'''Working Groups''' ||[[KAGRA/DAWG/CBC|CBC]] <<BR>> [[KAGRA/DAWG/Burst|Burst]] <<BR>> [[KAGRA/DAWG/CW|Continuous Waves]] <<BR>> [[KAGRA/DAWG/Stochastic|Stochastic background]] <<BR>> [[KAGRA/DAWG/CSWG|Computing and Software]] ||

 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10201|Application form for an account of KAGRA Main Storage System]]

----
<<Anchor(documents)>>
=== KAGRA Documents ===
 . [[KAGRA/MOU|MOU]]
 . [[KAGRA/DesignDocumentTree|KAGRA Document Tree]]
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 . [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[KAGRA/Interface|Interface Control wiki]])
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]]
 . [[KAGRA/KSC/FAQ|FAQ (frequently asked questions) to the KAGRA collaboration]] (under editing)

<<Anchor(pubpolicy)>>
 . [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3321|CPC publication policy]] (inc. the procedure to submit for the JSPS meetings)
 * [[https://gwcenter.icrr.u-tokyo.ac.jp/kagra_cpc_submission|CPC submission Page]]
Line 39: Line 109:
=== Project time-line === <<Anchor(access)>>
== [3] Site Access information ==
 * KAGRA website ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])
Line 41: Line 113:
 * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * [[KAGRA/iKAGRA|iKAGRA wiki]]: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
 * [[KAGRA/bKAGRA|bKAGRA wiki]]: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.

 . {{{#!wiki red/solid
'''ATTENTION!''' No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.
}}}

 * [[attachment:how_to_get_to_KAGRA_Observatory.pdf|Access to KAGRA site]]
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From December 12, 2019)]]
  
 * [[KAGRA/Subgroups/SiteShift|Site Shift information]]
 * Accommodation during KAGRA stay: YUKI house in Kamioka / Locomotion in Osawano:
  * [[http://www.supersaas.jp/schedule/kamioka-house/YUKI|Reservation page]]
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6460|User application form for ICRR-KAGRA accommodations]]
  * YUKI house
   * [[attachment:Access to YUKI-house.pdf|Access to Yuki house]]
   * [[attachment:0109 YUKIhouse_manual_J.pdf|Yuki house Manual(Japanese)]][[attachment:0109 YUKIhouse_manual.pdf|(English)]]
   * [[KAGRA/KamiokaLife|How to enjoy Kamioka]]
  * Locomotion
   * [[attachment:20160215_Locomotion_access_information_J.pdf|Access to Locomotion (Japanese)]][[attachment:20160215_Locomotion_access_information_E.pdf|(English)]][[attachment:Locomotion⇔KAGRA site by public transportation.pdf|Locomotion⇔KAGRA site by public transportation(English)]]
   * [[attachment:20171012_Locomotion_Manual_J.pdf|Locomotion Manual (Japanese)]][[attachment:20171101 Locomotion Manual_e.pdf|(English)]]
 * How to take garbage away in KAGRA site (in Japanese): [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3544|Manual]]

== How to work at the KAGRA site? ==
 * Material of morning meeting in the Dropbox folder (in Japanese): [[https://www.dropbox.com/sh/80ccnczb3j0jys8/AABGyHU-wssd2IDrEFfcGWfba?dl=0|Take a file named today's date.]]
 * Application to enter the KAGRA mine: [[https://gwcenter.icrr.u-tokyo.ac.jp/webinout|Application page]]
 * How to purchase items you need (in Japanese): [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6780|Proceedure]]
 * Application for requesting mine work to Kamioka-kougyo (in Japanese): [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3793|Application form]]
 * 1F TV meeting room at Kenkyu-to(Hokubu-kaikan): [[http://www.supersaas.jp/schedule/kamioka-house/KAIGI|Reservation page]]
 * 2F meeting room at Kenkyu-to(Hokubu-kaikan): [[https://www.supersaas.jp/schedule/kamioka-house/KAIGI2F|Reservation page]]
 * Reservation for [[https://teamup.com/ksyf9jcfzbt34egzmn|Zoom]]
 * Reservation for the [[http://www.supersaas.jp/schedule/KoachFilter/Koach_Filter|Koach Filters]]

== Technical information ==
 * Table of KAGRA location ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=3824|Table]])
Line 46: Line 148:
=== Official Sensitivity of bKAGRA ===
[[attachment:LCGT/sensitivity.png|{{attachment:LCGT/sensitivity.png|latest sensitivity curve|width=400}}|width=400]]

 * Website about the KAGRA sensitivity is [[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|here]].
 * Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]].
----
=== KAGRA Official Documents ===
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[KAGRA/Interface|Interface Control wiki]])
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]]
<<Anchor(subsystems)>>
== [4] Subsystems ==
<<Include(KAGRA/Subgroups)>>
Line 59: Line 154:
<<Anchor(others)>>
== [5] Other information ==

== Target Sensitivity of bKAGRA ==
[[attachment:bKAGRASensitivityAug2017.png|{{attachment:bKAGRASensitivityAug2017.png|latest estimated sensitivity curve|width="600"}}]]

 * Sensitivity data can be downloaded from [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7038|JGW-T1707038]]
 * Website about the KAGRA sensitivity is [[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|here]].
 * Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]].

Line 60: Line 166:
 . [[LCGT/AIC|advanced-study group wiki]]
Line 62: Line 167:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/SubGroupBriefing|合同サブグループ説明会]]
 * [[KAGRA/StudentMeeting|Student meeting]]
 * [[KAGRA/IFOBasicLec|干渉計基礎レク]]
 * [[KAGRA/YoungResearcher|For Young Researchers]]
 * [[Materials for Visitors]] Slides, Posters etc. to guide visitors of KAGRA
 * [[KAGRA CG Illustrations]] Stunning CG Illustrations by Rey.Hori
   {{attachment:KAGRA_generalView1_WEB_190326.png|view1|width=240}}{{attachment:KAGRA_generalView2_MirrorFloor_WithConnectionline_WEB_190326.png|view2|width=240}}{{attachment:KAGRA_mirrorDetail_WEB_190331.png|zoomview1|width=240}}

KAGRA Wiki

Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.


Present Status of KAGRA

  • Solo Observation Run (Feb 25, 2020 -- March 10, 2020) see O3b page.

  • new record 442 kpc, March 3.

  • new record 500 kpc, March 5.

  • new record 594 kpc, March 9.



News

  • LIGO Data Grid access is available. See [kagra 03375] and here.

  • Application to access account for LVC resources. See [kagra 03376] and apply from here.

  • Application to the KAGRA Author List 2019, by March 6 (extended). See [kagra 03345] apply from here.

  • FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.

  • Coming meetings
    • The 2020 March LIGO-VIRGO-KAGRA telecon: starts March 13 (Fri) 00:00 JST, 90 minutes

      • Status of LIGO, Virgo, KAGRA, GEO, and else.
    • KAGRA telecon: May 27 (Wed) & 28 (Thur), 2020 @ Zoom3

      • Alternative to the cancelled Face-to-Face meeting, we will have a telecon for two days, on May 27 and 28.

        See F2F page

    • The 2020 March LIGO-VIRGO-KAGRA meeting: at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur).

      • web site Note that the meeting was cancelled due to the current worldwide outbreak of coronavirus. see [kagra 03386].

    • The KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun).
      • This meeting was cancelled due to the current worldwide outbreak of coronavirus.

  • Postponement of meetings
    • The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020.
    • GWADW at Hokkaido (planned in the middle of May, 2020) is postponed a year.


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
KAGRA International Workshop
Chief Meeting blog (Old Chief Meeting)
Reviews
ET-KAGRA collaboration (ELiTES)
Related events

Documents
/Information

KAGRA log (klog)
JGWDoc
KAGRA Design Document Tree
Blogs
SVN
Bugzilla -- issue tracker (internal only)
MOU
Terminology
Publications
Collaboration Member list
Operation Manuals

Task management

Site Shift schedule
KAGRA organization chart
Project Chart page
Reservation for theKoachFilters

Tools

How to upload documents to JGWDoc (Japanese, English)
How to use SVN
How to join Mailing lists
How to use this JGW wiki (Japanese, English)
How to start using klog
How to use Remote participation tools

Commissioning

Commissioning top

Engineering Run

ER191217-24
ER200220-25

KAGRA-JRPC

20-01-24
20-02-20

Observation

Observation top
iKAGRA observation (2016:3/15-31, 4/11-25)
bKAGRA phase1 (2018:4/28-5/6)

Safety and Activity Control

Safety top

Warning System (in UTnet)

Workers Monitoring (in UTnet)

Collaborators Entrance Application


[2] KSC contents

KSC = KAGRA Scientific Congress

KSC

KSC page (KSCboard, Committees, KSC members)

KSC newsletter

No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April)

Rules and Regulations

links in KSC page

KAGRA Data Analysis Working Group

Data Analysis Working Group

Data Analysis Working Group Top Page

Data Analysis Committee

Data Analysis Committee Top Page

Working Groups

CBC
Burst
Continuous Waves
Stochastic background
Computing and Software


KAGRA Documents


[3] Site Access information

How to work at the KAGRA site?

Technical information

  • Table of KAGRA location (Table)


[4] Subsystems

Subgroups

Subgroup name

Links

0

System Integration

---

wiki

1

Tunnel

TUN

wiki

blog

2

Facility

FCL

wiki

blog

3

Vacuum

VAC

wiki

4

Cryogenics

CRY

wiki

blog

5

Vibration Isolation

VIS

wiki

blog

6

Mirror

MIR

wiki

7

Laser

LAS

wiki

8

Main Interferometer

MIF

wiki

9

Input/Output Optics

IOO

wiki

blog

10

Auxiliary Optics Subsystem

AOS

wiki

blog

11

Analog Electronics

AEL

wiki

blog

12

Digital System

DGS

wiki

blog

13

Data Management

DMG

wiki

14

Data Analysis

DAS

wiki

15

Geophysics Interferometer

GIF

wiki

16

Detector Characterization

DET

wiki

blog

17

Calibration

CAL

wiki

18

Physical Environment Monitors

PEM

wiki

**

Advanced R&D

wiki

**

NAOJ Test alog

(NAOJ)

NAOJlog

**

KAGRA Stock in Shelfs

Info Page

* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.

KAGRA Document and Drawing Tree


[5] Other information

Target Sensitivity of bKAGRA

latest estimated sensitivity curve

  • Sensitivity data can be downloaded from JGW-T1707038

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.

Others