Differences between revisions 627 and 628
Revision 627 as of 2019-02-14 09:26:12
Size: 7343
Comment:
Revision 628 as of 2019-02-15 09:14:11
Size: 7461
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/2/14(Thur.) === === 2019/2/15(Fri.) ===
Line 80: Line 80:
  * 2/12-15: Closing door for central area, pumping down
   * needs drift monitor for VIS
  * --(2/14: Closing door for ITM chambers)--
  * --(2/15: Closing door for other central area)--
  * --(2/15: pumping down for ITMs)--
  * --(2/15: pumping down for other central area)--
Line 84: Line 86:
 * Pumping down today. For ITMs 9am, for central area around noon.
Line 86: Line 89:
 * ETMY: We fixed many things. It seems to be fine.
 * SRs: Models are being modified.
 * ETMX baffle was installed inside the chamber, and PD has been setup with cable connection.
 * Baffle of ETMX are done yesterday.
 * SRM IM had drift yesterday. It was fixed.
  * SRM GEO phone had strange signal.
 * ETMY is under controlled. IP is still something strange.
Line 91: Line 96:
 * Pumpdown will start Friday afternoon. Fabian and Lucia will monitor for Type B(BS, SRs) and Type A(ITMs).
  * Type Bp should be monitored but they have no GAS filter. It will be monitored sometimes by Fabian(?).
 * Pumping down will start today. For ITMs 9am, for central area around noon.
  *
Fabian and Lucia will monitor for Type B(BS, SRs, and Type Bp) and Type A(ITMs).

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/2/15(Fri.)

Weekend

Schedule

  • Current status as of 1/22: IR and Green reached X end PD.
  • 1/22: Surface inspection for PR mirrors. Cleaning will be done after 1/31.

  • 1/23: Surface inspection for SR mirrors.

  • 1/24-25: Cleaning HR of SR3, SRM.

  • 1/23: BS is aligned to Y-end PD by IR.

  • 1/27: ITMY is aligned to REFL by IR.

  • 1/27: ITMX is aligned to REFL by IR.

  • 1/27: Beam position of IR at SR3 is confirmed how far from the center.

  • 1/28-29: SR3 is aligned to SR2 center by IR.

  • 1/28: Alignment of SR2 -> SRM by IR.

  • 1/29: Green beam is injected from SR2 AR surface to Y end PD.

  • 1/31: Removing bellows at PR and SR area.

  • 1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2

  • 2/5: Alignment of SRM to OMMT1 by IR

  • 2/6: Alignment of ETMY to POS by Green

  • 2/8: Alignment of form OMMT to OSTM by IR

  • 2/8: Alignment of form OSTM to OMC by IR

  • 2/14: Closing door for ITM chambers

  • 2/15: Closing door for other central area

  • 2/15: pumping down for ITMs

  • 2/15: pumping down for other central area

Note

  • Pumping down today. For ITMs 9am, for central area around noon.

Report of work

  • Baffle of ETMX are done yesterday.
  • SRM IM had drift yesterday. It was fixed.
    • SRM GEO phone had strange signal.
  • ETMY is under controlled. IP is still something strange.

Work plan

  • Pumping down will start today. For ITMs 9am, for central area around noon.
    • Fabian and Lucia will monitor for Type B(BS, SRs, and Type Bp) and Type A(ITMs).

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

||35||2018/7/3 ||Agenda||[[attachment:KAGRA/Commissioning/Schedule/Commissioni

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)