=== 2019/2/15(Fri.) === | === 2019/2/19(Tue.) === |
Line 86: | Line 86: |
* Pumping down today. For ITMs 9am, for central area around noon. | * Vacuum level ITMX and ITMX chambers are stopped around 10e-3 Pa. VAC team checks why. * Type A control loop should be closed all the time to avoid drift or something. If somebody works Type A, please let Lucia know. |
Line 89: | Line 90: |
* Baffle of ETMX are done yesterday. * SRM IM had drift yesterday. It was fixed. * SRM GEO phone had strange signal. * ETMY is under controlled. IP is still something strange. |
* Type B: * BS seems to be healthy. Damping was engaged. * SR3(Fabian) and SR2(Enzo) will be checked this morning, then SRM will be checked this afternoon. * Needs more time to measure TF after tomorrow. |
Line 94: | Line 95: |
* Type A * ITMX seems to be fine. ITMY is necessary to be moved. * ITMY will be aligned this afternoon. |
|
Line 96: | Line 100: |
* Pumping down will start today. For ITMs 9am, for central area around noon. * Fabian and Lucia will monitor for Type B(BS, SRs, and Type Bp) and Type A(ITMs). |
* Maintenance will be performed tomorrow morning, for replacing ETMY maybe. |
Line 111: | Line 113: |
||61||2019/2/19||[[KAGRA/Commissioning/Weekly/20190219/Agenda|Agenda]]||See agenda page||[[KAGRA/Commissioning/Weekly/20190219/Minute|Minute]]|| || |
KAGRA Commissioning Wiki
Task list
Schedule
Working people assignment
Readiness for the X arm commissioning
https://docs.google.com/spreadsheets/d/1S2gyFkyajlbPXMKCrqJV7181YFHUxUgPRB6SXz4z4jI/edit?usp=sharing
Meetings
Daily Meetings (9AM)
Zoom URL: https://zoom.us/j/7631499341
Weekly Meetings (Tuesday 11AM)
Zoom URL: https://zoom.us/j/6676627462
Daily meeting
- Date and time: Every weekday, 9AM
- First ~10min in the morning meeting, as short as possible
- Location: Control room and Fan hut connected by eZuce
2019/2/19(Tue.)
Weekend
Schedule
- Current status as of 1/22: IR and Green reached X end PD.
1/22: Surface inspection for PR mirrors. Cleaning will be done after 1/31.
1/23: Surface inspection for SR mirrors.
1/24-25: Cleaning HR of SR3, SRM.
1/23: BS is aligned to Y-end PD by IR.
1/27: ITMY is aligned to REFL by IR.
1/27: ITMX is aligned to REFL by IR.
1/27: Beam position of IR at SR3 is confirmed how far from the center.
1/28-29: SR3 is aligned to SR2 center by IR.
1/28: Alignment of SR2 -> SRM by IR.
1/29: Green beam is injected from SR2 AR surface to Y end PD.
1/31: Removing bellows at PR and SR area.
1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2
2/5: Alignment of SRM to OMMT1 by IR
2/6: Alignment of ETMY to POS by Green
2/8: Alignment of form OMMT to OSTM by IR
2/8: Alignment of form OSTM to OMC by IR
2/14: Closing door for ITM chambers
2/15: Closing door for other central area
2/15: pumping down for ITMs
2/15: pumping down for other central area
Note
- Vacuum level ITMX and ITMX chambers are stopped around 10e-3 Pa. VAC team checks why.
- Type A control loop should be closed all the time to avoid drift or something. If somebody works Type A, please let Lucia know.
Report of work
- Type B:
- BS seems to be healthy. Damping was engaged.
- SR3(Fabian) and SR2(Enzo) will be checked this morning, then SRM will be checked this afternoon.
- Needs more time to measure TF after tomorrow.
- Type A
- ITMX seems to be fine. ITMY is necessary to be moved.
- ITMY will be aligned this afternoon.
Work plan
- Maintenance will be performed tomorrow morning, for replacing ETMY maybe.
KAGRA/Commissioning/DailyWork << < 2024 / 10 > >> |
||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |
Weekly meeting
- Date and time: Every Tuesday, 11AM
- Location: Meeting room at Hokubukaikan, or eZuce, Polycom
No. |
Date |
Agenda |
Schedule |
Minute |
Files |
|
|
|
|
|
|
61 |
2019/2/19 |
See agenda page |
|
||
60 |
2019/2/5 |
See agenda page |
|
||
59 |
2019/1/29 |
|
|
||
58 |
2019/1/22 |
|
|
||
57 |
2019/1/8 |
|
|
||
56 |
2018/12/25 |
|
|
||
55 |
2018/12/17 |
|
|
||
54 |
2018/12/11 |
|
|
||
53 |
2018/12/4 |
|
|
||
52 |
2018/11/27 |
|
|
||
51 |
2018/11/20 |
|
|
||
50 |
2018/11/13 |
|
|
||
49 |
2018/11/6 |
|
|
||
48 |
2018/10/30 |
|
|
||
47 |
2018/10/23 |
|
|
||
46 |
2018/10/16 |
|
|
||
45 |
2018/10/9 |
|
|||
44 |
2018/10/2 |
|
|||
43 |
2018/9/18 |
|
|||
42 |
2018/9/4 |
|
|||
41 |
2018/8/28 |
|
|||
40 |
2018/8/21 |
|
|||
39 |
2018/8/7 |
|
|||
38 |
2018/7/31 |
|
|||
37 |
2018/7/24 |
|
|||
36 |
2018/7/17 |
|
||35||2018/7/3 ||Agenda||[[attachment:KAGRA/Commissioning/Schedule/Commissioni