KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/2/18(Mon.)

Weekend

Schedule

  • Current status as of 1/22: IR and Green reached X end PD.
  • 1/22: Surface inspection for PR mirrors. Cleaning will be done after 1/31.

  • 1/23: Surface inspection for SR mirrors.

  • 1/24-25: Cleaning HR of SR3, SRM.

  • 1/23: BS is aligned to Y-end PD by IR.

  • 1/27: ITMY is aligned to REFL by IR.

  • 1/27: ITMX is aligned to REFL by IR.

  • 1/27: Beam position of IR at SR3 is confirmed how far from the center.

  • 1/28-29: SR3 is aligned to SR2 center by IR.

  • 1/28: Alignment of SR2 -> SRM by IR.

  • 1/29: Green beam is injected from SR2 AR surface to Y end PD.

  • 1/31: Removing bellows at PR and SR area.

  • 1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2

  • 2/5: Alignment of SRM to OMMT1 by IR

  • 2/6: Alignment of ETMY to POS by Green

  • 2/8: Alignment of form OMMT to OSTM by IR

  • 2/8: Alignment of form OSTM to OMC by IR

  • 2/14: Closing door for ITM chambers

  • 2/15: Closing door for other central area

  • 2/15: pumping down for ITMs

  • 2/15: pumping down for other central area

Note

  • Starting DRMI!

Report of work

  • COM: Alignment for IMC, IMMT, PRMs are done yesterday. Beams have reached to both ETMX and ETMY.
  • Type B: Drifts were looked on Saturday.
    • TF seems to be OK as before.
    • Pico motor did not work.
    • Needs some work for BS, all SRMs to implement good controls.
  • Type A: Drifts were looked on Saturday.
    • ITMX seems to be OK, but needs some time to fix and measured for ITMY.

Work plan

  • restore the controls of Type-As and Type-Bs
  • restore the alignment of them.
  • check the beam at REFL, POP, POS, and OMM/OMC Chambers.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

||35||2018/7/3 ||Agenda||[[attachment:KAGRA/Commissioning/Schedule/Commissioni

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)