Differences between revisions 633 and 634
Revision 633 as of 2019-02-19 09:17:17
Size: 7817
Comment:
Revision 634 as of 2019-02-21 09:16:46
Size: 7017
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/2/19(Tue.) === === 2019/2/21(Wed.) ===
Line 57: Line 57:
  * Current status as of 1/22: IR and Green reached X end PD.
  * --(1/22: Surface inspection for PR mirrors.)-- Cleaning will be done after 1/31.
  * --(1/23: Surface inspection for SR mirrors.)--
  * --(1/24-25: Cleaning HR of SR3, SRM.)--
Line 62: Line 58:
  * --(1/23: BS is aligned to Y-end PD by IR.)--
  * --(1/27: ITMY is aligned to REFL by IR.)--
  * --(1/27: ITMX is aligned to REFL by IR.)--
  * --(1/27: Beam position of IR at SR3 is confirmed how far from the center.)--
 * Yend
  --(* 1/25-2/20: Yend Pcal finalization)--
  * 2/25-3/4: Yend WAB
  * 3/6~ : Yend pumpdown 3/6~
   * 3/7,8: leak test
Line 67: Line 64:
  * --(1/28-29: SR3 is aligned to SR2 center by IR.)--
  * --(1/28: Alignment of SR2 -> SRM by IR.)--
  * --(1/29: Green beam is injected from SR2 AR surface to Y end PD.)--
 * Xend
  * --(2/11-2/14: Xend NAB installation)--
  * 2/21: Removing FC, Payload release
  * 2/23-3/10: Xend Pcal finalization 1
   * Periscope installation
   * Beam position by IR and Green
  * 2/27: ETMX release
  * 3/5: ETMX aligned
  * 3/5-3/10: Xend Pcal finalization 2
  * 3/11,12 Xend WAB finalization
  * 3/19,20, Heatlink etc.
  * 3/22 Pumping down
   * Leak test
 
 * 3/11~ : Night work start
Line 71: Line 80:
  * --(1/31: Removing bellows at PR and SR area.)--
  * --(1/31-2/1: Cleaning HR of PR3 and HR, AR of SR2)--

  * --(2/5: Alignment of SRM to OMMT1 by IR)--
  * --(2/6: Alignment of ETMY to POS by Green)--

  * --(2/8: Alignment of form OMMT to OSTM by IR)--
  * --(2/8: Alignment of form OSTM to OMC by IR)--

  * --(2/14: Closing door for ITM chambers)--
  * --(2/15: Closing door for other central area)--
  * --(2/15: pumping down for ITMs)--
  * --(2/15: pumping down for other central area)--
 * 2/18-3/22 DRMI commissioning
 * 3/11-4/5 Y arm commissioning
 * 3/25-4/5 FPMI commissioning
Line 86: Line 85:
 * Vacuum level ITMX and ITMX chambers are stopped around 10e-3 Pa. VAC team checks why.
 * Type A control loop should be closed all the time to avoid drift or something. If somebody works Type A, please let Lucia know.
Line 90: Line 87:
 * Type B:
  * BS seems to be healthy. Damping was engaged.
  * SR3(Fabian) and SR2(Enzo) will be checked this morning, then SRM will be checked this afternoon.
  * Needs more time to measure TF after tomorrow.
Line 95: Line 88:
 * Type A
  * ITMX seems to be fine. ITMY is necessary to be moved.
  * ITMY will be aligned this afternoon.
 * COM: Alingnment for PR and BS and ITMS were recovered, and Michelson fringe was seen!
 * SRM: Yaw drift exists.
 * SR2: oplev shows something hitting.
 * VAC: small leakage was found at ITMY, but we leave it.
 * PEM: Camera lens of ITM is not enough.
 * DGS: PC for ETMX and ETMY were replaced.
Line 100: Line 96:
 * Maintenance will be performed tomorrow morning, for replacing ETMY maybe.  * ETMX: Removing FC afternoon.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/2/21(Wed.)

Weekend

Schedule

  • Yend
    • * 1/25-2/20: Yend Pcal finalization

    • 2/25-3/4: Yend WAB
    • 3/6~ : Yend pumpdown 3/6~
      • 3/7,8: leak test
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release
    • 2/23-3/10: Xend Pcal finalization 1
      • Periscope installation
      • Beam position by IR and Green
    • 2/27: ETMX release
    • 3/5: ETMX aligned
    • 3/5-3/10: Xend Pcal finalization 2
    • 3/11,12 Xend WAB finalization
    • 3/19,20, Heatlink etc.
    • 3/22 Pumping down
      • Leak test
  • 3/11~ : Night work start
  • 2/18-3/22 DRMI commissioning
  • 3/11-4/5 Y arm commissioning
  • 3/25-4/5 FPMI commissioning

Note

Report of work

  • COM: Alingnment for PR and BS and ITMS were recovered, and Michelson fringe was seen!
  • SRM: Yaw drift exists.
  • SR2: oplev shows something hitting.
  • VAC: small leakage was found at ITMY, but we leave it.
  • PEM: Camera lens of ITM is not enough.
  • DGS: PC for ETMX and ETMY were replaced.

Work plan

  • ETMX: Removing FC afternoon.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

||35||2018/7/3 ||Agenda||[[attachment:KAGRA/Commissioning/Schedule/Commissioni

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)