Differences between revisions 634 and 635
Revision 634 as of 2019-02-21 09:16:46
Size: 7017
Comment:
Revision 635 as of 2019-02-22 09:15:25
Size: 7144
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:
=== 2019/2/21(Wed.) === === 2019/2/22(Fri.) ===
Line 55: Line 55:
 * COM(only control ): Nakano, Guiguo
Line 59: Line 61:
  --(* 1/25-2/20: Yend Pcal finalization)--   * --(1/25-2/20: Yend Pcal finalization)--
Line 66: Line 68:
  * 2/21: Removing FC, Payload release   * --(2/21: Removing FC, Payload release)--
Line 78: Line 80:
 * 3/11~ : Night work start  * 3/11~ : Night work starts
Line 87: Line 89:
 * CRY: FC of ETMX was removed, and cryo payload was released.
 * COM: Michelson was locked again!
  * Tried to lock PRMI, but PRM was not moving somehow. Actually PRMI was locked for 1 or 2 second.
  * SR3 got aligned and green reached to Y end.
  * SR2 was also aligned.
Line 88: Line 95:
 * COM: Alingnment for PR and BS and ITMS were recovered, and Michelson fringe was seen!
 * SRM: Yaw drift exists.
 * SR2: oplev shows something hitting.
 * VAC: small leakage was found at ITMY, but we leave it.
 * PEM: Camera lens of ITM is not enough.
 * DGS: PC for ETMX and ETMY were replaced.
 * Type B: SRM seems to be healthy.
 * DGS: Dolphin connection for PRM and BS were done.

Line 96: Line 101:
 * ETMX: Removing FC afternoon.  * Type A: needs time for tuning of ITMX.

KAGRA Commissioning Wiki


Task list


Schedule


Working people assignment

Readiness for the X arm commissioning


Meetings

Daily Meetings (9AM)

Zoom URL: https://zoom.us/j/7631499341

Weekly Meetings (Tuesday 11AM)

Zoom URL: https://zoom.us/j/6676627462


Daily meeting

  • Date and time: Every weekday, 9AM
  • First ~10min in the morning meeting, as short as possible
  • Location: Control room and Fan hut connected by eZuce

2019/2/22(Fri.)

Weekend

  • COM(only control ): Nakano, Guiguo

Schedule

  • Yend
    • 1/25-2/20: Yend Pcal finalization

    • 2/25-3/4: Yend WAB
    • 3/6~ : Yend pumpdown 3/6~
      • 3/7,8: leak test
  • Xend
    • 2/11-2/14: Xend NAB installation

    • 2/21: Removing FC, Payload release

    • 2/23-3/10: Xend Pcal finalization 1
      • Periscope installation
      • Beam position by IR and Green
    • 2/27: ETMX release
    • 3/5: ETMX aligned
    • 3/5-3/10: Xend Pcal finalization 2
    • 3/11,12 Xend WAB finalization
    • 3/19,20, Heatlink etc.
    • 3/22 Pumping down
      • Leak test
  • 3/11~ : Night work starts
  • 2/18-3/22 DRMI commissioning
  • 3/11-4/5 Y arm commissioning
  • 3/25-4/5 FPMI commissioning

Note

Report of work

  • CRY: FC of ETMX was removed, and cryo payload was released.
  • COM: Michelson was locked again!
    • Tried to lock PRMI, but PRM was not moving somehow. Actually PRMI was locked for 1 or 2 second.
    • SR3 got aligned and green reached to Y end.
    • SR2 was also aligned.
  • Type B: SRM seems to be healthy.
  • DGS: Dolphin connection for PRM and BS were done.

Work plan

  • Type A: needs time for tuning of ITMX.

KAGRA/Commissioning/DailyWork
<< <  2024 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

61

2019/2/19

Agenda

See agenda page

Minute

60

2019/2/5

Agenda

See agenda page

Minute

59

2019/1/29

Agenda

Minute

58

2019/1/22

Agenda

Minute

57

2019/1/8

Agenda

Minute

56

2018/12/25

Agenda

Minute

55

2018/12/17

Agenda

Minute

54

2018/12/11

Agenda

Minute

53

2018/12/4

Agenda

Minute

52

2018/11/27

Agenda

Minute

51

2018/11/20

Agenda

Minute

50

2018/11/13

Agenda

Minute

49

2018/11/6

Agenda

Minute

48

2018/10/30

Agenda

Minute

47

2018/10/23

Agenda

Minute

46

2018/10/16

Agenda

Minute

45

2018/10/9

Agenda

Schedule

Minute

44

2018/10/2

Agenda

Schedule

Minute

43

2018/9/18

Agenda

Schedule

Minute

42

2018/9/4

Agenda

Schedule

Minute

41

2018/8/28

Agenda

Schedule

Minute

40

2018/8/21

Agenda

Schedule

Minute

39

2018/8/7

Agenda

Schedule

Minute

38

2018/7/31

Agenda

Schedule

Minute

37

2018/7/24

Agenda

Schedule

Minute

36

2018/7/17

Agenda

Schedule

Minute

||35||2018/7/3 ||Agenda||[[attachment:KAGRA/Commissioning/Schedule/Commissioni

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)