2010
Comment:
|
6078
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
= Vibration Isolation System (VIS) = | |
Line 3: | Line 4: |
= VIS = | == Subsystem Definition == 1. This subsystem makes vibration isolation for all optics used in KAGRA. 2. Requirement of displacement of the test mass mirrors must be less than 4x10^-20m/rtHz at 10Hz. RMS motion must be less than 0.1 um as displacement and 0.1 um/s as velocity. |
Line 5: | Line 8: |
'''V'''ibration '''I'''solation '''S'''ystem is the hardware infrastructure for the main optics in the KAGRA interferometer. | Reference [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=365|JGW-T1100365-v2]] |
Line 7: | Line 10: |
<<TableOfContents(3)>> | ----- ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Design''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Suspensions''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Mechanics''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Sensors''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Actuators/Motors'''||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Digital System'''|| || Concept? ||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeA|Type-A]] || [[KAGRA/Subgroups/VIS/Mechanics/Pre-Isolator|Pre-Isolator]] || [[KAGRA/Subgroups/VIS/Sensors/InertialSensor|Inertial Sensor]] || [[KAGRA/Subgroups/VIS/Actuators/VoiceCoilActuator|Voice coil actuator]] || [[KAGRA/Subgroups/VIS/RealTimeModel|RTModel]] || ||[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator Design]] ||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeB|Type-B]] || [[KAGRA/Subgroups/VIS/Mechanics/GAS|GAS]] || [[KAGRA/Subgroups/VIS/Sensors/LVDT|LVDT]] || Solenoid actuator? || [[KAGRA/Subgroups/VIS/Guardian|Guardian]] || ||[[KAGRA/Subgroups/VIS/Requirement|Requirement]] ||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] || [[KAGRA/Subgroups/VIS/Mechanics/MagneticDamper|Magnetic damper]] ||[[KAGRA/Subgroups/VIS/Sensors/PhotoSensor|Photo Sensor]] || [[KAGRA/Subgroups/VIS/OpsManual/Pico|Picomotor]] || [[KAGRA/Subgroups/VIS/OpsManual/SDF|SDF]] || || - ||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/Type-C|Type-C]] || [[KAGRA/Subgroups/VIS/Mechanics/MaragingWire|Maraging wire]] || [[KAGRA/Subgroups/VIS/Sensors/OpLev|Optical Lever (OpLev)]] || [[KAGRA/Subgroups/DGS/Projects/StepperMotor|Stepper Motor]] || [[KAGRA/Subgroups/VIS/BIO|BIO]] || || - ||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TMS-VIS|TMS-VIS]] || - || [[KAGRA/Subgroups/VIS/ReleaseSensor|Release Sensor]] || [[KAGRA/Subgroups/VIS/OpsManual/FishingRods|Fishing Rods]] || - || || - || - || - || - || [[KAGRA/Subgroups/VIS/OpsManual/Traverser|Traverser]] || - || || - || - || - || - || [[KAGRA/Subgroups/VIS/OpsManual/PicomotorPowerControlSwitch| PicomotorPowerControlSwitch]] || - || || - || - || - ||<-2 style="text-align:center;"> [[KAGRA/Subgroups/VIS/Sensors/OSEM|OSEM]] || - || || - || - || - ||<-2 style="text-align:center;"> [[KAGRA/Subgroups/VIS/TempControl|Temp. Control]] || - || |
Line 9: | Line 22: |
== Space for VIS-internal Use == | ||<#a31f52 style="color:#ffffff; text-align:center;"> '''Meetings'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''Management'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''Maintainance/Diagnostics'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''Other subsystem interfaces''' ||<#a31f52 style="color:#ffffff; text-align:center;"> '''For Users'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''VIS Apps''' || ||[[KAGRA/Subgroups/VIS/MeetingNAOJ|Weekly VIS meeting]] || [[KAGRA/Subgroups/VIS/Schedule|Schedule]]|| [[KAGRA/Subgroups/VIS/Maintainance|Maintainance]] ||[[KAGRA/Subgroups/VIS/AELInterfaces|AEL interfaces]] ||[[KAGRA/Subgroups/VIS/BugReports|Bug Reports]] ||[[KAGRA/Subgroups/VIS/OpsManual/SUMCON|SUMCON]]|| ||[[KAGRA/Subgroups/VIS/ExtraMeetings|Extraordinary meetings]] || [[https://app.zenhub.com/workspaces/upgrade-for-o4-5f56e83aff8ec50012d90116/board?repos=276073075|Github Projects]]|| [[KAGRA/Subgroups/VIS/Acceptance Test|Acceptance Test]] || [[KAGRA/Subgroups/VIS/DGSInterfaces|DGS interfaces]] || [[KAGRA/Subgroups/VIS/TroubleShooting|Trouble Shooting]] || [[KAGRA/Subgroups/VIS/ModelPlotter|ModelPlotter]] || ||[[KAGRA/Subgroups/VIS/OldVISMeetings|Old VISMeeting]]||[[https://github.com/gw-vis|Github Repository]] || [[KAGRA/Subgroups/VIS/OpsManual/DGSMaintainance| DGSMaintainance]] ||[[KAGRA/Subgroups/VIS/CRYInterfaces|CRY interface]] || || [[KAGRA/Subgroups/VIS/OpsManual/AutoMeasurement|AutoMeasurement]] || || --- || --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/SuspensionControlModeling|SuspensionControlModeling]] || || --- || --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/Kontrol|Kontrol]] || || --- || --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/VISHack|VIS Health Check]] || |
Line 11: | Line 30: |
=== Quick Announcement === | ||<#808080 style="color:#ffffff; text-align:center;"> '''Links, Misic.''' ||<#808080 style="color:#ffffff; text-align:center;"> '''Documents''' || ||Wiki [[https://awiki.ligo-wa.caltech.edu/wiki/Seismic_Isolation| SEI]], [[https://awiki.ligo-wa.caltech.edu/wiki/Suspensions|SUS]] || [[KAGRA/Subgroups/VIS/Introduction|VIS Introduction]] || ||Log [[https://alog.ligo-la.caltech.edu/SEI/index.php?content=1| SEI]], [[https://alog.ligo-wa.caltech.edu/aLOG/index.php?content=1|LHO]], [[https://alog.ligo-la.caltech.edu/aLOG/|LLO]], [[https://logbook.virgo-gw.eu/virgo/|Virgo]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4005|VIS Doc. Tree]] || || [[KAGRA/Subgroups/VIS/Photos|Photos]] || [[KAGRA/Subgroups/VIS/Daily Operations|Daily Operations]] || |
Line 13: | Line 35: |
=== Frequently Used Links === . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
/!\ [April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted [[https://github.com/gw-vis/kagra-vis/issues/18|here]]. |
Line 16: | Line 37: |
---- == VIS Upgrades == |
----- === Old (Please arrange me) === |
Line 19: | Line 40: |
[[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] | * [[KAGRA/Subgroups/VIS/IstManual|Procedure]] * [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc.]] * [[KAGRA/Subgroups/VIS/OpsManual|Manual]] * [[KAGRA/Subgroups/VIS/Upgrade|Upgrade]] * [[KAGRA/Subgroups/VIS/OpsManual/HealthCheck|HealthCheck]] * [[KAGRA/Subgroups/VIS/OpsManual/TypeA|OpsManual-TypeA|]] * [[KAGRA/Subgroups/VIS/OpsManual/TypeB|OpsManual-TypeB|]] * [[KAGRA/Subgroups/VIS/OpsManual/TypeBp|OpsManual-TypeBp|]] * [[KAGRA/Subgroups/VIS/OpsManual/TypeC|OpsManual-TypeC|]] |
Line 21: | Line 50: |
---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]] [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]] [[KAGRA/Subgroups/VIS/Payload|Payload]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] ---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] == Members == * Chief: R. Takahashi * Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) <<Navigation(children)>> |
----- |
Vibration Isolation System (VIS)
Subsystem Definition
- This subsystem makes vibration isolation for all optics used in KAGRA.
- Requirement of displacement of the test mass mirrors must be less than 4x10^-20m/rtHz at 10Hz. RMS motion must be less than 0.1 um as displacement and 0.1 um/s as velocity.
Reference JGW-T1100365-v2
Design |
Suspensions |
Mechanics |
Sensors |
Actuators/Motors |
Digital System |
Concept? |
|||||
Solenoid actuator? |
|||||
- |
|||||
- |
- |
- |
|||
- |
- |
- |
- |
- |
|
- |
- |
- |
- |
- |
|
- |
- |
- |
- |
||
- |
- |
- |
- |
Meetings |
Management |
Maintainance/Diagnostics |
Other subsystem interfaces |
For Users |
VIS Apps |
|
|||||
--- |
--- |
--- |
--- |
--- |
|
--- |
--- |
--- |
--- |
--- |
|
--- |
--- |
--- |
--- |
--- |
Links, Misic. |
Documents |
[April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted here.
Old (Please arrange me)