Differences between revisions 648 and 649
Revision 648 as of 2022-06-15 17:28:02
Size: 18296
Comment:
Revision 649 as of 2022-06-15 17:32:04
Size: 18354
Comment:
Deletions are marked like this. Additions are marked like this.
Line 59: Line 59:
  * The 9th KAGRA International Workshop (KIW8) at Beijing, China, Spring 2022.   * The 9th KAGRA International Workshop (KIW8) at Beijing, China, 6-8 June 2022. [[https://indico.itp.ac.cn/event/123/|Meeting website]]

KAGRA Wiki

Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.



News

  • Sub-committee of PAB focused on Safety issues: 16 December 2021 Sub-committee report

  • KSC Newsletter No.8 (2021 May)

  • LIGO Data Grid access is available. See [kagra 03375] and here.

  • Application to access account for LVC resources (gw-astronomy account). See [kagra 05088] and apply from here.

  • FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.

  • Coming meetings
    • The 29th KAGRA Face-to-Face meeting: Hybrid Style : August 1-3, 2022. New wiki (requires KAGRA account)

  • Past meetings
    • The 27th KAGRA Face-to-Face meeting: Online Style : August 27-29, 2021. New wiki (requires KAGRA account)

    • The 28th KAGRA Face-to-Face meeting: Online Style : December 20-21, 2021. New wiki (requires KAGRA account)

    • The 8th KAGRA International Workshop (KIW8) at KASI in Korea July 7-9, 2021. http://kiw8.org

    • LIGO-Virgo-KAGRA collaboration meeting at Louisiana, Online style, March 14-17, 2022 New wiki

    • The 9th KAGRA International Workshop (KIW8) at Beijing, China, 6-8 June 2022. Meeting website

  • Previous collaboration-wide telecons
    • KAGRA telecon : May 12 (Wed) 2021. See wiki for agenda.

    • KAGRA telecon : June 30 (Wed) 2021. See wiki for agenda.


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
KAGRA International Workshop
Chief Meeting blog (Old Chief Meeting)
Reviews
ET-KAGRA collaboration (ELiTES)
Related events

Documents
/Information

Summary of various KAGRA accounts
Mailing lists
KAGRA log (klog)
JGWDoc
KAGRA DAC wiki
KAGRA Design Document Tree
Blogs
SVN
Bugzilla -- issue tracker (internal only)
MOU
Terminology
Publications
Collaboration Member list
Operation Manuals
KAGRA reports
KAGRA Daily Morning Meeting
Consultation on Harassment and Research Misconduct

Task management

redmine
Site Shift schedule
KAGRA organization chart
Project Chart page
Reservation for theKoachFilters

Tools

How to upload documents to JGWDoc (Japanese, English)
How to use SVN
How to use this JGW wiki (Japanese, English)
How to start using klog
How to use Remote participation tools

Commissioning

Commissioning top

Engineering Run

ER191217-24
ER200220-25
ER200401-0407

KAGRA-JRPC

20-01-24
20-02-20

Observation

Observation top
iKAGRA observation (2016:3/15-31, 4/11-25)
bKAGRA phase1 (2018:4/28-5/6)
KAGRA 1st observation(2020/2/25-3/10, 4/7-4/21)

Upgrades

Post O3 upgrades
Post O4 upgrades

IFO Integration

X-arm closing (21/12/10)
Y-arm closing (22/5/20)

Safety and Activity Control

Safety top

Warning System (in UTnet)

Workers Monitoring (in UTnet)

Collaborators Entrance Application


[2] KSC contents

KSC = KAGRA Scientific Congress

KSC

KSC page (KSCboard, Committees, KSC members)

KSC newsletter

No.8 (2021 May), No.7 (2020 April), No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April)

Rules and Regulations

links in KSC page

KAGRA Data Analysis Working Group

Data Analysis Working Group

Data Analysis Working Group Top Page

Data Analysis Committee

Data Analysis Committee Top Page

Working Groups

CBC
Burst
Continuous Waves
Stochastic background
Computing and Software


KAGRA Documents


[3] Site information

  • KAGRA website (Japanese, English)

  • ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.

Access info. & accommodation

How to work at the KAGRA site?

Technical information

  • Table of KAGRA location (Table)

Mitaka (Tokyo) Control Room


[4] Subsystems

Subgroups

Subgroup name

Links

0

System Integration

---

wiki

1

Tunnel

TUN

wiki

blog

2

Facility

FCL

wiki

blog

3

Vacuum

VAC

wiki

4

Cryogenics

CRY

wiki

blog

5

Vibration Isolation

VIS

wiki

blog

6

Mirror

MIR

wiki

7

Laser

LAS

wiki

8

Main Interferometer

MIF

wiki

9

Input/Output Optics

IOO

wiki

blog

10

Auxiliary Optics Subsystem

AOS

wiki

blog

11

Analog Electronics

AEL

wiki

blog

12

Digital System

DGS

wiki

blog

13

Data Management

DMG

wiki

14

Data Analysis

DAS

wiki

15

Geophysics Interferometer

GIF

wiki

16

Detector Characterization

DET

wiki

blog

17

Calibration

CAL

wiki

18

Physical Environment Monitors

PEM

wiki

**

Advanced R&D

wiki

**

NAOJ Test alog

(NAOJ)

NAOJlog

**

KAGRA Stock in Shelfs

Info Page

* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.

KAGRA Document and Drawing Tree


[5] Other information

Target Sensitivity of bKAGRA

latest estimated sensitivity curve

  • Sensitivity data can be downloaded from JGW-T1707038

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.

Others

KAGRA (last edited 2024-03-21 09:59:48 by miyoki)