Size: 4796
Comment:
|
Size: 5230
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
|| 14th || 2012/12/04(Tue)|| AOS-CRY-SEO meeting on stray light and cryostat || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1418| JGW-T1201418]] || ||<#F0F0F0> 13th ||<#F0F0F0> 2012/11/22(Thu)||<#F0F0F0> Interface meeting with CRY-AOS on stray light control ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1401 | JGW-T1201401]]|| |
|
Line 24: | Line 26: |
||<#F0F0F0> 7th ||<#F0F0F0> 2012/11/29 ||<#F0F0F0> Baffle design ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1419 | JGW doc]] || || 6th || 2012/11/14 || ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1393| JGW doc]] || ||<#F0F0F0> 5th ||<#F0F0F0> 2012/10/31||<#F0F0F0> Updates on the lay tracing simulation ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1379|JGW doc]] || || 4th || 2012/10/17 || Some updates on the lay trace simulation ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1359| JGW doc]] || ||<#F0F0F0> 3rd ||<#F0F0F0> 2012/10/01 ||<#F0F0F0> A current hot topic is the method of the baffle simulation ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1306 | JGW doc]] || || Brainstorming ||2012/09/14|| Baffle numerical simulations || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1275 | JGW doc ]]|| |
||<#F0F0F0> 7th ||<#F0F0F0> 2012/11/29 ||<#F0F0F0> Baffle design ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1419 | JGW-T1201419]] || || 6th || 2012/11/14 || ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1393| JGW-T1201393]] || ||<#F0F0F0> 5th ||<#F0F0F0> 2012/10/31||<#F0F0F0> Updates on the lay tracing simulation ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1379|JGW-T1201379 ]] || || 4th || 2012/10/17 || Some updates on the lay trace simulation ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1359| JGW-T1201359 ]] || ||<#F0F0F0> 3rd ||<#F0F0F0> 2012/10/01 ||<#F0F0F0> A current hot topic is the method of the baffle simulation ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1306 | JGW-G1201306]] || || Brainstorming ||2012/09/14|| Baffle numerical simulations || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1275 | JGW-T1201275 ]]|| |
Meeting Archive
AOS meeting
Descriptions |
Dates and Places |
Topics |
Minutes |
14th |
2012/12/04(Tue) |
AOS-CRY-SEO meeting on stray light and cryostat |
|
13th |
2012/11/22(Thu) |
Interface meeting with CRY-AOS on stray light control |
|
12th |
2012/9/27(Thu) |
バッフル素材の低温における1um光学特性テスト |
|
11th |
2012/7/24(Tue) |
Cryogenic baffles |
|
10th |
2012/6/12(Thr) |
光てこの実施体制と実施項目について |
|
9th |
2012/4/27(Fri) |
Optical Leverについて。または、optical leverにどのような機能を期待するか? |
|
8th |
2012/3/7(wed) |
光軸調整用ターゲットの配置など |
|
7th |
2012/3/1(Thr) |
大口径ビームプロファイラーの採用可否その他 |
[kagra-aos 00008]参照。 |
6th |
2012/2/15(Wed) |
クライオ内にいれる、TM広角散乱用のバッフルをどう保持するか、など。 |
|
5th |
2012/1/19(Thu) |
内部レビューに向けて、AOSの現状確認と今後について。 |
|
4th |
2012/1/13(Fri) |
低温懸架系との合同でのf2f会議 |
|
3rd |
2011/10/7(Fri) |
光テコの件。 |
|
2nd |
2011/9/2(Fri) |
入出射光学系にassignしたタスクの具体的な進め方の件、LIGOへの協力要請の件(9月中旬までにまとめて)。 |
|
Kick off |
2011/7/19(Tue) |
LCGT補助光学系キックオフ。 |
Baffle Design Meeting
Descriptions |
Dates |
Topics |
Minutes |
9th |
2012/12/27 |
|
|
8th |
2012/12/13 |
Baffle design. Parameter tuning and dependencies |
|
7th |
2012/11/29 |
Baffle design |
|
6th |
2012/11/14 |
|
|
5th |
2012/10/31 |
Updates on the lay tracing simulation |
|
4th |
2012/10/17 |
Some updates on the lay trace simulation |
|
3rd |
2012/10/01 |
A current hot topic is the method of the baffle simulation |
|
Brainstorming |
2012/09/14 |
Baffle numerical simulations |
|
KAGRA-ATC |
2012/06/05 |
ジェネシアとの協力体制など |
KAGRA-ATC/ME meeting
Descriptions |
Dates |
Topics |
Minutes |
8 |
|
|
|
7 |
2012/12/07(Fri) |
Test designs and scheduling |
|
6 |
2012/11/16(Fri) |
Possible tests for fabrication |
|
5 |
2012/11/2(Fri) |
Discussion on fabrication of baffles |
|
4 |
2012/9/28(Fri) |
Fabrication of large-size Baffles |
|
3 |
2012/9/7(Fri) |
Fabrication of large-size Baffles |
|
2 |
2012/8/24(Fri) |
Fabrication of large-size Baffles |
|
kick-off |
2012/8/10(Fri) |
KAGRA-ATC/ME meeting kickoff |