||<#F0F0F0> 15th ||<#F0F0F0> 2012/12/04(Tue)||<#F0F0F0> AOS-CRY-SEO meeting on stray light and cryostat ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1418| JGW-T1201418]] || || 14th || 2012/11/22(Thr)|| Interface meeting with CRY-AOS on stray light control || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1401 | JGW-T1201401]]|| ||<#F0F0F0> 13th ||<#F0F0F0> 2012/10/04(Thr)||<#F0F0F0> バッフル素材の低温における1um光学特性テスト ||<#F0F0F0> || || 12th || 2012/09/27(Thr) || バッフル素材の低温における1um光学特性テスト|| [[LCGT/subgroup/AOS/AOSminutes20120927|AOSminutes20120927]] || ||<#F0F0F0> 11th ||<#F0F0F0> 2012/7/24(Tue) ||<#F0F0F0> Cryogenic baffles ||<#F0F0F0> || || 10th || 2012/06/12(Thr) || 光てこの実施体制と実施項目について || [[attachment:oplev20120712.txt]] || ||<#F0F0F0> 9th ||<#F0F0F0> 2012/04/27(Fri)||<#F0F0F0> Optical Leverについて。または、optical leverにどのような機能を期待するか?||<#F0F0F0> [[attachment:20120427.txt]]|| || 8th || 2012/03/07(wed)|| 光軸調整用ターゲットの配置など || || |
|| 16th || 2012/12/04(Tue)|| AOS-CRY-SEO meeting on stray light and cryostat || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1418| JGW-T1201418]] || ||<#F0F0F0> 15th ||<#F0F0F0> 2012/11/22(Thr)||<#F0F0F0> Interface meeting with CRY-AOS on stray light control ||<#F0F0F0> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1401 | JGW-T1201401]]|| || 14th || 2012/10/04(Thr)|| バッフル素材の低温における1um光学特性テスト || || ||<#F0F0F0> 13th ||<#F0F0F0> 2012/09/27(Thr) ||<#F0F0F0> バッフル素材の低温における1um光学特性テスト||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20120927|AOSminutes20120927]] || || 12th || 2012/08/23(Thr) || Optical design of large baffles and End telescopes ||N/A || ||<#F0F0F0> 11th ||<#F0F0F0> 2012/07/24(Tue) ||<#F0F0F0> Cryogenic baffles ||<#F0F0F0>N/A || || 10th || 2012/06/12(Thr) || 光てこの実施体制と実施項目について || [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/AOS/Meetings?action=AttachFile&do=view&target=oplev20120712.txt|oplev20120712.txt]] || ||<#F0F0F0> 9th ||<#F0F0F0> 2012/04/27(Fri)||<#F0F0F0> Optical Leverについて。または、optical leverにどのような機能を期待するか?||<#F0F0F0> [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/AOS/Meetings?action=AttachFile&do=view&target=20120427.txt|20120427.txt]]|| || 8th || 2012/03/07(wed)|| 光軸調整用ターゲットの配置など || N/A || |
Line 17: | Line 18: |
||6th || 2012/02/15(Wed) || クライオ内にいれる、TM広角散乱用のバッフルをどう保持するか、など。|| || ||<#F0F0F0> 5th ||<#F0F0F0> 2012/01/19(Thr) ||<#F0F0F0> 内部レビューに向けて、AOSの現状確認と今後について。||<#F0F0F0> || || 4th || 2012/01/13(Fri)|| 低温懸架系との合同でのf2f会議 || [[attachment:議事メモ(山元さん)20120113.txt]] || ||<#F0F0F0> 3rd ||<#F0F0F0> 2011/10/07(Fri)||<#F0F0F0> 光テコの件。||<#F0F0F0> || || 2nd || 2011/09/02(Fri)||入出射光学系にassignしたタスクの具体的な進め方の件、LIGOへの協力要請の件(9月中旬までにまとめて)。||[[ attachment:aos_memo_20110902.txt]] || ||<#F0F0F0> Kick off ||<#F0F0F0> 2011/07/19(Tue)||<#F0F0F0> LCGT補助光学系キックオフ。||<#F0F0F0> [[attachment:aos_memo_20110719.txt]] || |
||6th || 2012/02/15(Wed) || クライオ内にいれる、TM広角散乱用のバッフルをどう保持するか、など。|| N/A || ||<#F0F0F0> 5th ||<#F0F0F0> 2012/01/19(Thr) ||<#F0F0F0> 内部レビューに向けて、AOSの現状確認と今後について。||<#F0F0F0> N/A|| || 4th || 2012/01/13(Fri)|| 低温懸架系との合同でのf2f会議 || [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/AOS/Meetings?action=AttachFile&do=view&target=%E8%AD%B0%E4%BA%8B%E3%83%A1%E3%83%A2%EF%BC%88%E5%B1%B1%E5%85%83%E3%81%95%E3%82%93%EF%BC%8920120113.txt|20120113.txt]] || ||<#F0F0F0> 3rd ||<#F0F0F0> 2011/10/07(Fri)||<#F0F0F0> 光テコの件。||<#F0F0F0> N/A || || 2nd || 2011/09/02(Fri)||入出射光学系にassignしたタスクの具体的な進め方の件、LIGOへの協力要請の件(9月中旬までにまとめて)。||[[ http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/AOS/Meetings?action=AttachFile&do=view&target=aos_memo_20110902.txt|aos_memo_20110902.txt]] || ||<#F0F0F0> Kick off ||<#F0F0F0> 2011/07/19(Tue)||<#F0F0F0> LCGT補助光学系キックオフ。||<#F0F0F0> [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/subgroup/AOS/Meetings?action=AttachFile&do=view&target=aos_memo_20110719.txt | aos_memo_20110719.txt]]|| |
Line 30: | Line 31: |
|| 6th || 2012/11/14 || ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1393| JGW-T1201393]] || | || 6th || 2012/11/14 ||Optical design of large baffles ||[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1393| JGW-T1201393]] || |
Line 40: | Line 41: |
||<#F0F0F0> 8 ||<#F0F0F0> ||<#F0F0F0> ||<#F0F0F0> || || 7 || 2012/12/07(Fri) || Test designs and scheduling || [[LCGT/subgroup/AOS/AOSminutes20121207 | AOSminutes20121207 ]] || ||<#F0F0F0> 6 ||<#F0F0F0> 2012/11/16(Fri) ||<#F0F0F0> Possible tests for fabrication ||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20121116 | AOSminutes20121116]] || || 5 ||2012/11/2(Fri) || Discussion on fabrication of baffles || [[LCGT/subgroup/AOS/AOSminutes20121102|AOSminutes20121102]] || ||<#F0F0F0> 4||<#F0F0F0> 2012/9/28(Fri) ||<#F0F0F0> Fabrication of large-size Baffles||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20120928|AOSminutes20120928]] || || 3|| 2012/9/7(Fri) || Fabrication of large-size Baffles|| [[LCGT/subgroup/AOS/AOSminutes20120907|AOSminutes20120907]] || ||<#F0F0F0> 2||<#F0F0F0> 2012/8/24(Fri) ||<#F0F0F0> Fabrication of large-size Baffles ||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20120824|AOSminutes20120824]] || || kick-off|| 2012/8/10(Fri) || KAGRA-ATC/ME meeting kickoff || [[LCGT/subgroup/AOS/AOSminutes20120810|AOSminutes20120810]] || |
|| 9 || || || || ||<#F0F0F0> 8 ||<#F0F0F0> 2012/12/07(Fri) ||<#F0F0F0> Test designs and scheduling ||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20121207 | AOSminutes20121207 ]] || || 7 || 2012/11/16(Fri) || Possible tests for fabrication || [[LCGT/subgroup/AOS/AOSminutes20121116 | AOSminutes20121116]] || ||<#F0F0F0> 6 ||<#F0F0F0>2012/11/02(Fri) ||<#F0F0F0> Discussion on fabrication of baffles ||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20121102|AOSminutes20121102]] || || 5 || 2012/10/12(Fri) || Fabrication of large-size Baffles || [[LCGT/subgroup/AOS/AOSminutes20121012 | AOSminutes20121012]] || ||<#F0F0F0> 4||<#F0F0F0> 2012/09/28(Fri) ||<#F0F0F0> Fabrication of large-size Baffles||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20120928|AOSminutes20120928]] || || 3|| 2012/09/07(Fri) || Fabrication of large-size Baffles|| [[LCGT/subgroup/AOS/AOSminutes20120907|AOSminutes20120907]] || ||<#F0F0F0> 2||<#F0F0F0> 2012/08/24(Fri) ||<#F0F0F0> Fabrication of large-size Baffles ||<#F0F0F0> [[LCGT/subgroup/AOS/AOSminutes20120824|AOSminutes20120824]] || || kick-off|| 2012/08/10(Fri) || KAGRA-ATC/ME meeting kickoff || [[LCGT/subgroup/AOS/AOSminutes20120810|AOSminutes20120810]] || |
Meeting Archive
AOS meeting
Descriptions |
Dates and Places |
Topics |
Minutes |
16th |
2012/12/04(Tue) |
AOS-CRY-SEO meeting on stray light and cryostat |
|
15th |
2012/11/22(Thr) |
Interface meeting with CRY-AOS on stray light control |
|
14th |
2012/10/04(Thr) |
バッフル素材の低温における1um光学特性テスト |
|
13th |
2012/09/27(Thr) |
バッフル素材の低温における1um光学特性テスト |
|
12th |
2012/08/23(Thr) |
Optical design of large baffles and End telescopes |
N/A |
11th |
2012/07/24(Tue) |
Cryogenic baffles |
N/A |
10th |
2012/06/12(Thr) |
光てこの実施体制と実施項目について |
|
9th |
2012/04/27(Fri) |
Optical Leverについて。または、optical leverにどのような機能を期待するか? |
|
8th |
2012/03/07(wed) |
光軸調整用ターゲットの配置など |
N/A |
7th |
2012/03/01(Thr) |
大口径ビームプロファイラーの採用可否その他 |
[kagra-aos 00008]参照。 |
6th |
2012/02/15(Wed) |
クライオ内にいれる、TM広角散乱用のバッフルをどう保持するか、など。 |
N/A |
5th |
2012/01/19(Thr) |
内部レビューに向けて、AOSの現状確認と今後について。 |
N/A |
4th |
2012/01/13(Fri) |
低温懸架系との合同でのf2f会議 |
|
3rd |
2011/10/07(Fri) |
光テコの件。 |
N/A |
2nd |
2011/09/02(Fri) |
入出射光学系にassignしたタスクの具体的な進め方の件、LIGOへの協力要請の件(9月中旬までにまとめて)。 |
|
Kick off |
2011/07/19(Tue) |
LCGT補助光学系キックオフ。 |
Baffle Design Meeting
Descriptions |
Dates |
Topics |
Minutes |
9th |
2012/12/27 |
|
|
8th |
2012/12/13 |
Baffle design. Parameter tuning and dependencies |
|
7th |
2012/11/29 |
Baffle design |
|
6th |
2012/11/14 |
Optical design of large baffles |
|
5th |
2012/10/31 |
Updates on the lay tracing simulation |
|
4th |
2012/10/17 |
Some updates on the lay trace simulation |
|
3rd |
2012/10/01 |
A current hot topic is the method of the baffle simulation |
|
Brainstorming |
2012/09/14 |
Baffle numerical simulations |
|
KAGRA-ATC |
2012/06/05 |
ジェネシアとの協力体制など |
KAGRA-ATC/ME meeting
Descriptions |
Dates |
Topics |
Minutes |
9 |
|
|
|
8 |
2012/12/07(Fri) |
Test designs and scheduling |
|
7 |
2012/11/16(Fri) |
Possible tests for fabrication |
|
6 |
2012/11/02(Fri) |
Discussion on fabrication of baffles |
|
5 |
2012/10/12(Fri) |
Fabrication of large-size Baffles |
|
4 |
2012/09/28(Fri) |
Fabrication of large-size Baffles |
|
3 |
2012/09/07(Fri) |
Fabrication of large-size Baffles |
|
2 |
2012/08/24(Fri) |
Fabrication of large-size Baffles |
|
kick-off |
2012/08/10(Fri) |
KAGRA-ATC/ME meeting kickoff |