= Wide Angle Baffle = | = Wide Angle Baffle Cooling Test 2018 = |
Line 3: | Line 3: |
<<MonthCalendar>> | <<MonthCalendar(,2018,1)>><<MonthCalendar(,2018,2)>> |
Line 5: | Line 5: |
== Links to information sources == * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6474|Wide Angle Buffle desing review (Obuchi)]] |
== Links to knowledge == * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6474|Wide Angle Baffle desing review (Obuchi)]] |
Wide Angle Baffle Cooling Test 2018
<< < 2018 / 1 > >> | ||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 | 31 |
<< < 2018 / 2 > >> | ||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 |
Links to knowledge
Task list
Note: some of the tasks can be done in parallel.
- Place/install the WAB suspension.
- Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
- What....?
Test the saving mode of the WAB suspension.
Don't forget to replace the damping magnets to SmCo ones; those will be delivered on Jan 26.
- What is the requirement to say the damping is sufficient...?
- Connect electric cables (with checking) in the IYC chamber.
3 photosensors; in each photosensor head, two PDs should be connected parallel. Need to calibrate the response of each sensor head...
- 2 heaters; should be connected parallel??
- 1 coil for actuation.
6 thermometers with (extended?) patch cables made of phospher bronze; the extended double twisted pare cables will be delivered on Jan 26
- Connect 4 heat links.
- Check oplev signals.
- Connect cables the outside as well.
- Make a realtime model to monitor.
- Take interface with Tcam.
- Make a plan to do leak check before cooling down.
DAQ
Real-time computer: k1???
Slot |
Item |
Assigned to |
S/N |
42 |
<blank> |
|
|
41 |
<blank> |
|
|
40 |
<blank> |
|
|
39 |
<blank> |
|
|
38 |
<blank> |
|
|
37 |
<blank> |
|
|
36 |
<blank> |
|
|
35 |
<blank> |
|
|
34 |
<blank> |
|
|
33 |
<blank> |
|
|
32 |
<blank> |
|
|
31 |
<blank> |
|
|
30 |
<blank> |
|
|
29 |
<blank> |
|
|
28 |
<blank> |
|
|
27 |
<blank> |
|
|
26 |
<blank> |
|
|
25 |
<blank> |
|
|
24 |
<blank> |
|
|
23 |
<blank> |
|
|
22 |
<blank> |
|
|
21 |
<blank> |
|
|
20 |
<blank> |
|
|
19 |
<blank> |
|
|
18 |
<blank> |
|
|
17 |
<blank> |
|
|
16 |
<blank> |
|
|
15 |
<blank> |
|
|
14 |
<blank> |
|
|
13 |
<blank> |
|
|
12 |
AI Chassis |
DAC0 |
SN??? |
11 |
AA Chassis |
ADC0 |
SN??? |
10 |
<blank> |
|
|
9 |
I/O Chassis |
|
SN??? |
8 |
<blank> |
|
|
7 |
<blank> |
|
|
6 |
<blank> |
|
|
5 |
<blank> |
|
|
4 |
<blank> |
|
|
3 |
<blank> |
|
|
2 |
<blank> |
|
|
1 |
<blank> |
|
|
0 |
<blank> |
|
|