Differences between revisions 180 and 202 (spanning 22 versions)
Revision 180 as of 2015-10-04 21:42:42
Size: 2664
Comment:
Revision 202 as of 2018-08-17 13:30:21
Size: 3356
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control (SLC)]]  * [[LCGT/subgroup/AOS/Viewport2017|Viewports]]
 * Optical levers (Oplevs)
  * [[KAGRA/subgroup/AOS/Oplev_trend|Trend of oplev sum]]
  * [[LCGT/subgroup/AOS/OptLev1|[Obsolete] Optical Levers development]]
 * [[KAGRA/Subgroups/DGS/Projects/Cam|Digital Cameras]]
 * Stray-light control (SLC)
  * [[LCGT/subgroup/AOS/StrayLight1|General descriptions]]
  * Wide-angle baffles (WABs)
   * [[LCGT/subgroup/AOS/WideAngleBuffle|Cooling test at IYC (2018 Jan-April)]]
   * [[KAGRA/subgroup/AOS/WideAngleBaffleIX|WAB for IXC]]
  * [[KAGRA/subgroups/AOS/NarrowAngleBaffles|NarrowAngleBaffles]]
  * Mid-size baffles
  * [[KAGRA/Subgroups/AOS/HighPowerBeamDumps1|High power beam dumps in vacuo]]
Line 24: Line 36:
 * [[LCGT/subgroup/AOS/OptLev1|Optical Levers (OpLevs)]]
 * [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources ]] including CCD Monitors or equivalent
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]] at room temperature
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
  * [[KAGRA/subgroup/AOS/TMSY1|Transmission Monitor Y (Phase 1)]]
  * [[KAGRA/subgroup/AOS/TMSX1|Transmission Monitor X (Phase 1)]]
  * [[KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation]]
Line 29: Line 40:
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4237|Camera Documents]]
 * [[LCGT/subgroup/AOS/Viewport1|[Obsolete] Viewports]] at room temperature
 * [[LCGT/subgroup/AOS/BeamTarget1|[Obsolete]Automatic Target System]]
 * [[LCGT/subgroup/AOS/CCD1|[Obsolete] Imagers and Light Sources ]] including CCD Monitors or equivalent

KAGRA Auxiliary Optics (AOS)


Tools

Objectives

  • The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.

References

Subsystems

Meetings


Obsolete items

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)