Differences between revisions 64 and 75 (spanning 11 versions)
Revision 64 as of 2015-07-13 12:20:25
Size: 12939
Comment:
Revision 75 as of 2015-11-09 15:06:59
Size: 16428
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

=== 2015/11/09 ===

 * Additional meeting
  * 作るもの
   * Coil driver interface 30枚基盤製作済み、10枚完成済、x 20枚これから部品をのせる(設計完了)
   * Low power coil driver 箱入れ(->三代)
   * High power coil driver 作るのか?
   * Whitening filter interface基板 x(設計完了)
   * Satellite box x (デンセイ発注、部品総数確認中)
   * Whitening filter 解析
   * Stepping motor
   * TTFSS,PMC breakout board
   * DAC->BNC変換
   * BNC->ADC変換

 * PMC servoを一部省略 -> JGWDocへ記録(->粟井、中野)



=== 2015/10/19 15:00 ===

 * Topic

  1. 現在進んでいる回路の進捗状況
   * VIS: Interface converter for coil drivers, Low power coil driver, High power coil driver, Satellite box, Stepper motor chassis
   * IOO: TTFSS breakout board
   * MIF: RF QPD interface(完成、引き渡す), RF PD interface(完成、引き渡す), DC-PD driver
 
  * 検討事項
   * whitening filterの検査(片岡)
   * D-SUB 9pin in-vac cables

 . [[KAGRA/Subgroups/AEL/meeting/20151019|Minutes]]


=== 2015/10/5 15:00 ===

 * Topic

  1. 現在進んでいる回路の進捗状況
   * VIS: Interface converter for coil drivers, High power coil driver, Satellite box, Stepper motor chassis
   * IOO: TTFSS breakout board
   * MIF: RF QPD interface, RF PD interface, DC-PD driver, RF distributor
 
  * 検討事項
   * whitening filterの検査(片岡)
   * D-SUB 9pin in-vac cables

 . [[KAGRA/Subgroups/AEL/meeting/20151005|Minutes]]


=== 2015/9/7 15:00 ===

 * Topic

  1. 現在進んでいる回路の進捗状況
   * VIS: Satellite box, High power coil driver(改良含む), Low power coil driver(改良含む), Stepper motor chassis
   * IOO: MC servo, PMC servo, TTFSS break board
   * MIF: RF QPD(引き渡し済), RF PD(Diodeを除き引き渡し済), RF QPD interface, RF PD interface
   * MIF/AOS: Oplev(引き渡し済)
 
  * 検討事項

 . [[KAGRA/Subgroups/AEL/meeting/20150907|Minutes]]


=== 2015/8/24 15:00 ===

 * Topic

  1. 現在進んでいる回路の進捗状況
   * VIS: Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
   * IOO: MC servo, PMC servo, TTFSS break board
   * MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
   * MIF/AOS: Oplev
   * DGS: 24V DC power strip

  * 検討事項
   * Field rackへの配線(DC電源ケーブル)状況

 . [[KAGRA/Subgroups/AEL/meeting/20150824|Minutes]]


=== 2015/8/10 15:00 ===

 * Topic

  1. 現在進んでいる回路の進捗状況
   * VIS: Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
   * IOO: MC servo, PMC servo, TTFSS break board
   * MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
   * MIF/AOS: Oplev
   * DGS: 24V DC power strip

  * 検討事項
   * Field rackへの配線(DC電源ケーブル)

 . [[KAGRA/Subgroups/AEL/meeting/20150810|Minutes]]



=== 2015/7/27 15:00 ===

 * Topic

  1. 現在進んでいる回路の進捗状況
   * VIS: Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
   * IOO: MC servo, PMC servo
   * MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
   * MIF/AOS: Oplev
   * DGS: 24V DC power strip

  * 検討事項
   * Field rackへの配線(DC電源ケーブル)

 . [[KAGRA/Subgroups/AEL/meeting/20150727|Minutes]]

Meeting

2015/11/09

  • Additional meeting
    • 作るもの
      • Coil driver interface 30枚基盤製作済み、10枚完成済、x 20枚これから部品をのせる(設計完了)
      • Low power coil driver 箱入れ(->三代)

      • High power coil driver 作るのか?
      • Whitening filter interface基板 x(設計完了)
      • Satellite box x (デンセイ発注、部品総数確認中)
      • Whitening filter 解析
      • Stepping motor
      • TTFSS,PMC breakout board
      • DAC->BNC変換

      • BNC->ADC変換

  • PMC servoを一部省略 -> JGWDocへ記録(->粟井、中野)

2015/10/19 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: Interface converter for coil drivers, Low power coil driver, High power coil driver, Satellite box, Stepper motor chassis
      • IOO: TTFSS breakout board
      • MIF: RF QPD interface(完成、引き渡す), RF PD interface(完成、引き渡す), DC-PD driver
    2. 検討事項
      • whitening filterの検査(片岡)
      • D-SUB 9pin in-vac cables
  • Minutes

2015/10/5 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: Interface converter for coil drivers, High power coil driver, Satellite box, Stepper motor chassis
      • IOO: TTFSS breakout board
      • MIF: RF QPD interface, RF PD interface, DC-PD driver, RF distributor
    2. 検討事項
      • whitening filterの検査(片岡)
      • D-SUB 9pin in-vac cables
  • Minutes

2015/9/7 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: Satellite box, High power coil driver(改良含む), Low power coil driver(改良含む), Stepper motor chassis
      • IOO: MC servo, PMC servo, TTFSS break board
      • MIF: RF QPD(引き渡し済), RF PD(Diodeを除き引き渡し済), RF QPD interface, RF PD interface
      • MIF/AOS: Oplev(引き渡し済)
    2. 検討事項
  • Minutes

2015/8/24 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
      • IOO: MC servo, PMC servo, TTFSS break board
      • MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
      • MIF/AOS: Oplev
      • DGS: 24V DC power strip
    2. 検討事項
      • Field rackへの配線(DC電源ケーブル)状況
  • Minutes

2015/8/10 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
      • IOO: MC servo, PMC servo, TTFSS break board
      • MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
      • MIF/AOS: Oplev
      • DGS: 24V DC power strip
    2. 検討事項
      • Field rackへの配線(DC電源ケーブル)
  • Minutes

2015/7/27 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
      • IOO: MC servo, PMC servo
      • MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
      • MIF/AOS: Oplev
      • DGS: 24V DC power strip
    2. 検討事項
      • Field rackへの配線(DC電源ケーブル)
  • Minutes

2015/7/13 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: LVDT driver, LVDT distributor, Satellite box, High power coil driver, Low power coil driver, Stepper motor chassis
      • IOO: MC servo
      • MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
      • MIF/AOS: Oplev
      • DGS: 24V DC power strip
    2. 検討事項及びタスクのリストアップ
      • Field rackへの配線(光ファイバーケーブル、DC電源ケーブル)
  • Minutes

2015/6/15 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: LVDT distributor, High power coil driver, Satellite box, Stepper motor chassis, Low power coil driver
      • IOO: MC servo
      • MIF: RF QPD, RF PD, RF QPD interface, RF PD interface
      • MIF/AOS: Oplev
      • DGS: 24V DC power strip
    2. 検討事項及びタスクのリストアップ
      • Field rackの対策
      • 24V配電
  • Minutes

2015/5/18 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: LVDT distributor, High power coil driver, Satellite box, Stepper motor chassis, Low power coil driver
      • IOO: MC servo
      • MIF: I&Q demodulator, RF QPD, RF PD, RF QPD interface, RF PD interface

      • MIF/AOS: Oplev
      • DGS: 24V DC power strip
    2. 検討事項及びタスクのリストアップ
      • Field rackの対策
      • 24V配電
  • Minutes

2015/4/6 15:00

  • Topic
    1. 夏までのスケジュール確認
    2. 現在進んでいる回路の進捗状況
      • VIS: LVDT driver, High power coil driver, Satellite box, Stepper motor chassis
      • IOO: MC servo
      • MIF: I&Q demodulator, RF QPD, RF PD, RF QPD interface, RF PD interface

      • MIF/AOS: Oplev
      • DGS: 12V DC power strip
    3. 検討事項及びタスクのリストアップ
      • 24V配電 (IO chassisへの対応含む)
      • Whitening filter検査結果と対策
      • Field rackの対策
  • Minutes

2015/4/1 13:00

2015/3/18 10:30

  • RF PD, DC QPD, RF PD interface, RF QPD interface, MC servo 打ち合わせ
  • Minutes

2015/3/9 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: LVDT driver, High power coil driver, Satellite box, Stepper motor chassis
      • IOO: MC servo
      • MIF: I&Q demodulator

      • MIF/GIF/AOS/DGS: Whitening filter
      • DGS: 18V DC power strip
      • 現在サスペンドしている回路: RF QPD, 12V DC power strip
    2. 検討事項及びタスクのリストアップ
      • DC電源の配電について
      • Whitening filter検査結果と対策
      • Field rackの対策
  • Minutes

2015/2/23 15:00

  • Topic
    1. 現在進んでいる回路の進捗状況
      • VIS: LVDT driver, High power coil driver, Satellite box
      • IOO: MC servo
      • MIF: I&Q demodulator

      • MIF/GIF/AOS/DGS: Whitening filter
      • DGS: 18V DC power strip
    2. 現在サスペンドしている回路の確認
      • RF QPD, 12V DC power strip
    3. これから提出されるであろう回路の対応について
    4. 検討事項及びタスクのリストアップ
      • DC電源の配電について
      • Whitening filter検査結果と対策
      • Field rackの対策
  • Minutes

2015/1/23 15:30

2014/12/15 15:00

  • Topic
    1. 現状/スケジュール確認
    2. ケーブル類の現状把握
    3. Single endケーブルをどう扱うか
    4. フィールドラックの設置方法
    5. その他
  • Minutes

2014/12/1 15:00

  • Topic
    1. 予算執行ストップに対する、今年度必要回路の確認
    2. 現状/スケジュール確認
    3. 動作報告等
    4. その他
  • Minutes

2014/11/17 15:00

  • Topic
    1. 現状/スケジュール確認
    2. 動作報告等
    3. その他
  • Minutes

2014/10/6 15:00

  • Topic
    1. スケジュール確認
      • LVDT driver chassis: 4ch x 2枚 x 10台 = 80ch、11月末
      • QPD:5台、2月頭

      • I&Q demodulator: 4ch x 5台 = 20ch、 期日未定

      • OSEM reader: 100個?、?
      • Satellite Box: 1台?、?
      • High power Coil Driver: 5台、12月末
      • Low power Coil Driver: 22台、来年1月から徐々に
      • whitening filter: 10台、 期日未定
      • 18V DC power strip: 30台、、来年1月から徐々に
      • (Stepper Motor chassis)
      • (PMC driver)
      • (MC driver)
    2. 動作報告等
      • Oplev
      • TTFSS
      • OSEM reader
    3. その他
  • Minutes

2014/9/8 15:00

  • Topic
    1. コイルドライバー製作について(時間がかかりそうなので、最後に議論するかもしれません)
    2. シフト状況
    3. 検査体制の確立
      • 自動化
      • ドキュメント化
      • whitening filter検査報告
      • 検査専用計算機の設置
    4. 進捗状況確認
      • whitening filter組み立て
      • LVDT driver
      • QPD
    5. 動作報告等
      • Oplev
      • TTFSS
    6. その他
  • Minutes

2014/9/2 11:00

  • Topic
    • QOD D1402631 時期、数量確認、その他詳細打ち合わせ。

  • Minutes

2014/8/25 15:00

  • Topic
    • 回路検査試験の現状
    • whitening filter組み込み
    • DC電源配電
      • 24V?
    • 進捗状況
      • LVDT driver
      • QPD
      • ワルシャワ大現状
      • その他防振系回路
  • Minutes

  • Topic
    • D-SUBケーブル状況
      • フランジ側
      • コネクタ形状の変更
    • ラック搬入計画現状
      • 防塵防水ラック: 4 or 6本
      • 通常ラック: 30本程度
    • 回路検査試験の現状
    • 回路製作依頼書の作成
    • 進捗状況
      • ステッピングモータードライバー
      • LVDT driver
      • I&Q demodulator

      • oplev
  • Minutes

2014/7/28 15:00

  • Topic
    • 電源ケーブル状況
    • ラック搬入計画現状
    • whitening filter検査試験の方法
    • 回路製作依頼書の作成
    • 進捗状況
      • ステッピングモータードライバー
      • LVDT driver
      • I&Q demodulator

      • oplev
  • Minutes

2014/7/14 15:00

  • Topic
    • 電源ケーブル状況
    • ラック搬入計画現状
    • whitening filter検査試験の方法
    • ワルシャワ大へのコイルドライバー作成依頼の状況確認
    • 回路製作依頼書の作成
    • 回路製作状況確認ページ
    • 進捗状況
      • 天文台でのステッピングモータードライバーの動作確認
      • LVDT driver
      • I&Q demodulator

      • oplev
  • Minutes

2014/6/30 15:00

  • Topic
    • Sasaki訪問
    • whitening filter検査試験の方法
    • ワルシャワ大へのコイルドライバー作成依頼の状況確認
    • 天文台でのステッピングモータードライバーの動作確認
    • Oplevをどのように設置するか
    • 進捗状況
      • I&Q demodulator

      • LVDT driver
  • Minutes

2014/6/16 15:00

  • Topic
    1. whitening filter組み立て報告と検証方法の検討
    2. ワルシャワ大へのコイルドライバー作成依頼の状況確認
    3. 進捗状況及び、製作予定期間の確認
      • Oplev
      • I&Q demodulator

      • ステッピングモータードライバー
      • LVDT driver
  • Minutes

2014/5/19 15:00

  • Topic
    • whitening filterの組み立てとGIFへの引き渡し
    • Optical leverの改造について
    • I&Q demodulator準備状況

    • Coil driver方針検討とワルシャワ大グループへの依頼について、及びコネクタ類の検討
    • LVDT driver用の中継機版と変調用発信器回路について
    • Stepper motor driverの電源とシャーシ組込み
  • Minutes

2014/5/7 16:00 Extra meeting with DGS

  • Topic
    • Oplev
    • Coil driver
    • Stepping motor
    • LVDT driver
    • I&Q demodulator

    • whitening filter
  • Minutes

2014/4/14 11:00 Extra meeting for VIS coil driver

  • Topic
    • 差動入力、差動出力
    • テスト入力端子、及び入力のリモート切り替え
    • Watch dogの位置
    • 真空槽内ケーブルについて
  • Files:
  • Minutes

2014/4/7 15:00

2014/3/10 15:00

2014/1/27 15:00

2013/12/11 13:30 Schedule with SEO

2013/11/25 15:00

2013/11/11 15:00

2013/10/28 15:00

2013/9/30 15:00~

  • 今回から、これまでのDGSとAELの合同ミーティングから独立し、これまでの各グループとの打ち合わせを正式なAELミーティングとする。
  • Files:
  • Minutes

2013/9/2 15:00~

2013/8/19 15:00~

2013/7/22 15:00 for VIS and AOS

Minutes

2013/7/4 10:00 for VIS and AOS

Minutes

2013/5/29 13:00 at Kashiwa for VIS

Minutes


2012/11/9 10:00~ How to make a circuit using AEL


KAGRA/Subgroups/AEL/meeting (last edited 2024-10-01 14:51:58 by OsamuMiyakawa)