* With a fixed stage. | * With a vibration isolation stage (VIS). |
Line 19: | Line 19: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6652]] | |
Line 24: | Line 25: |
* Place/install the fixed stage. * Needs some shims... but what is the required horizontalness? * Place/install the BRT * What is the references...? |
* Place/install the TMS-VIS (TMS's vibration isolation stage). * Place/install the BRT on the TMS-VIS |
Transmission Monitor (TMS) at EXT (For O3)
- With a vibration isolation stage (VIS).
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
Links to knowledge
- 「図3_EXT,EYTの位置.pptx」
Interferometer Layout for Both IR and Green Beams, With and Without ITMs (Michimura)
Alignment Plan for TRY Optical Table in bKAGRA Phase 1 (Michimura)
- "両角_光学系レイアウト_v4.pdf" (Morozumi)
Task list
Note: some of the tasks can be done in parallel.
- Place/install the TMS-VIS (TMS's vibration isolation stage).
- Place/install the BRT on the TMS-VIS