Transmission Monitor (TMS) at EXT (For O3)
- With a vibration isolation stage (VIS).
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-18 |
---|
20180918 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-19 |
---|
20180919 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-20 |
---|
20180920 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-21 |
---|
20180921 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-25 |
---|
20180925 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-26 |
---|
20180926 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-27 |
---|
20180927 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-09-28 |
---|
20180928 |
|
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-02 |
---|
20181002 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-03 |
---|
20181003 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-04 |
---|
20181004 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-05 |
---|
20181005 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-06 |
---|
20181006 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-09 |
---|
20181009 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-10 |
---|
20181010 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-11 |
---|
20181011 |
KAGRA/Subgroups/AOS/TMSX_O3/2018-10-12 |
---|
20181012 |
|
Links to knowledge
Task list
Note: some of the tasks can be done in parallel.
- Place/install the TMS-VIS (TMS's vibration isolation stage).
- Place/install the BRT on the TMS-VIS
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |