Differences between revisions 101 and 102
Revision 101 as of 2018-05-10 13:31:59
Size: 9597
Comment:
Revision 102 as of 2018-05-10 13:32:14
Size: 9616
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 * [[LCGT/subgroup/AOS/WideAngleBuffle/CoilInjectionTime|]]  * [[LCGT/subgroup/AOS/WideAngleBuffle/CoilInjectionTime|Coil Injection Time]]

Wide Angle Baffle Cooling Test 2018

<< <  2018 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2018 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28        

<< <  2018 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  

<< <  2018 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            

Important note about data

Coil Injection Time

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension.
  • Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
    • What....?
  • Test the saving mode of the WAB suspension.

  • Don't forget to replace the damping magnets to SmCo ones.

    • What is the requirement to say the damping is sufficient...?
  • Connect electric cables (with checking) in the IYC chamber.
    • 3 photosensors; in each photosensor head, two PDs should be connected parallel. Need to calibrate the response of each sensor head...

    • 2 heaters; should be connected parallel??
    • 1 coil for actuation.
    • 6 thermometers with (extended?) patch cables made of phospher bronze; the extended double twisted pare cables will be delivered on Jan 26

  • Connect 4 heat links.
  • Check oplev signals.
  • Connect cables the outside as well.
  • Make a realtime model to monitor.
  • Take interface with Tcam.
  • Make a plan to do leak check before cooling down.
  • Don't forget to add some heat links (Cu?) to the top of the suspension...

Photosensor

The PDs and LED are aligned as shown in the below picture.

Photosensor head PD and LED pin assign

The following LEDs and PDs are used; thanks for the information from Fukunaga-kun and Ushiba-kun.

OSEM satellite amp is used to drive.

Pin Assign

  • Summary of the pin assign of burndy connector inside the cryostat.

NOTE: The meaning of color for thermometer cable is
RED = I- , YELLOW = I+ , GREEN = V- , BLACK = V+

P22

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

A

75 ohm

Thermometer

V-

Green

Cryocon CH A

B

75 ohm

Thermometer

V+

Black

C

4 ohm

Thermometer

I-

Red

D

4 ohm

Thermometer

I+

Yellow

E

75 ohm

Thermometer

V-

Green

Cryocon CH B

F

75 ohm

Thermometer

V+

Black

G

4 ohm

Thermometer

I-

Red

H

4 ohm

Thermometer

I+

Yellow

J

75 ohm

Thermometer

V-

Green

Cryocon CH C

K

75 ohm

Thermometer

V+

Black

L

4 ohm

Thermometer

I-

Red

M

4 ohm

Thermometer

I+

Yellow

N

Blank

P

75 ohm

Thermometer

V-

Green

Cryocon CH D

R

75 ohm

Thermometer

V+

Black

S

4 ohm

Thermometer

I-

Red

T

4 ohm

Thermometer

I+

Yellow

U

75 ohm

Thermometer

V-

Green

Cryocon CH E

V

75 ohm

Thermometer

V+

Black

W

4 ohm

Thermometer

I-

Red

X

4 ohm

Thermometer

I+

Yellow

Y

Blank

 

P23

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

A

75 ohm

Thermometer

V-

Green

Cryocon CH F

B

75 ohm

Thermometer

V+

Black

C

4 ohm

Coil Mag. Act.

I-

As low resistor line was needed.

D

4 ohm

Coil Mag. Act.

I+

As low resistor line was needed.

E

75 ohm

PS1 PD

V- (K)

F

75 ohm

PS1 PD

V+ (A)

G

4 ohm

PS1 LED

I- (K)

H

4 ohm

PS1 LED

I+ (A)

J

75 ohm

PS2 PD

V- (K)

K

75 ohm

PS2 PD

V+ (A)

L

4 ohm

PS2 LED

I- (K)

M

4 ohm

PS2 LED

I+ (A)

N

Blank

P

75 ohm

PS3 PD

V- (K)

R

75 ohm

PS3 PD

V+ (A)

S

4 ohm

PS3 LED

I- (K)

T

4 ohm

PS3 LED

I+ (A)

U

75 ohm

Thermometer

I-

Red

Cryocon CH F

V

75 ohm

Thermometer

I+

Yellow

Cryocon CH F

W

4 ohm

Heater

I-

X

4 ohm

Heater

I+

Y

Blank

Diagram

DAQ

Real-time computer: k1???

Slot

Item

Assigned to

S/N

42

<blank>

41

<blank>

40

<blank>

39

<blank>

38

<blank>

37

<blank>

36

<blank>

35

<blank>

34

<blank>

33

<blank>

32

<blank>

31

<blank>

30

<blank>

29

<blank>

28

<blank>

27

<blank>

26

<blank>

25

<blank>

24

<blank>

23

<blank>

22

<blank>

21

<blank>

20

<blank>

19

<blank>

18

<blank>

17

<blank>

16

<blank>

15

<blank>

14

<blank>

13

<blank>

12

AI Chassis

DAC0

SN???

11

AA Chassis

ADC0

SN???

10

<blank>

9

I/O Chassis

SN???

8

<blank>

7

<blank>

6

<blank>

5

<blank>

4

<blank>

3

<blank>

2

<blank>

1

<blank>

0

<blank>

OpLev

  • Optical lever installed at the +X/-Y side of the IYC
  • Path-length inside the chamber (viewport to viewport): ~3000 mm

Diagram

WAB Alignment

  • Alignment done with 2 laser-leveler inside the IYC
  • Regarding the used terms:
    • As the baffle is placed along the Y-arm, +Y and -Y refer to both long ends of the baffle toward the Y-end and toward the center area, respectively!
    • The same holds true for the horizontal dimension in x-arm direction (+X means toward X-end and -X toward center/PSL)

Yaw

  • laser-leveler needs to be close to the -Y main-beam entrance in a height 300 - 400 mm above the optical table
  • Vertical laser line to be adjusted to the main-beam indication on the optical table and the inner wall of the cryostat
  • Checked the line by using the slids of the flanges on top the WAB (each slid is ~3.5 mm broad)
  • For both slids, the laser line is mismatched (not centered) toward -X by ~0.5 mm (@ +Y slid) and ~1 mm (@ -Y slid)

That means that there is probably also a -X offset!

  • The flanges have a distance of 170 mm which indicates a maximum yaw-tilting of ~0.1 degrees

Note: taking the distances is very hard as the position of the slids is not easy to access

Pitch

  • laser-leveler outside the cryostat (but inside IYC) set to give a horizontal line along length side of the baffle
  • Found a slight mismatch for the outer screw holding the OpLev mirrors in +Y,+X and -Y,+X

  • Difference is ~1 mm (+Z @ -Y, so -Y-side is higher than +Y-side)
  • With approx. 500 mm distance between both screws, the maximum pitch is ~0.1 degrees

Roll

  • Took the height of the OpLev mirror screw-holes (@ -Y,+X and -Y,-X) with a vertical ruler and the horizontal line of the laser-leveler outside the cryostat

  • Measured a difference of 2.5 mm which makes it a roll of 0.55 degrees (radius of baffle ~130 mm); -Y,-X is higher!
  • Then took the height of baffle-wings which are mounted on the flanges and could not measure any difference (within an error of 0.5 mm)
  • Hence, only the baffle is slightly rolled within the flanges!

LCGT/subgroup/AOS/WideAngleBuffle (last edited 2018-07-18 15:17:37 by TomotadaAkutsu)