Differences between revisions 26 and 36 (spanning 10 versions)
Revision 26 as of 2018-01-25 22:13:00
Size: 2663
Comment:
Revision 36 as of 2018-01-26 00:40:45
Size: 3011
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Wide Angle Baffle = = Wide Angle Baffle Cooling Test 2018 =
Line 3: Line 3:
<<MonthCalendar>> ||<<MonthCalendar(,2018,1)>>||<<MonthCalendar(,2018,2)>>||<<MonthCalendar(,2018,3)>>||
Line 5: Line 5:
== Links to Sources ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6474|Wide Angle Buffle desing review]]

== Links to knowledge ==
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6474|Wide Angle Baffle desing review (Obuchi)]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7415|Requirements for heat links of WAB (Akutsu)]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7710|Temporal information links]]

Wide Angle Baffle Cooling Test 2018

<< <  2018 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2018 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28        

<< <  2018 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension.
  • Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
    • What....?
  • Test the saving mode of the WAB suspension.

  • Don't forget to replace the damping magnets to SmCo ones; those will be delivered on Jan 26.

    • What is the requirement to say the damping is sufficient...?
  • Connect electric cables (with checking) in the IYC chamber.
    • 3 photosensors; in each photosensor head, two PDs should be connected parallel. Need to calibrate the response of each sensor head...

    • 2 heaters; should be connected parallel??
    • 1 coil for actuation.
    • 6 thermometers with (extended?) patch cables made of phospher bronze; the extended double twisted pare cables will be delivered on Jan 26

  • Connect 4 heat links.
  • Check oplev signals.
  • Connect cables the outside as well.
  • Make a realtime model to monitor.
  • Take interface with Tcam.
  • Make a plan to do leak check before cooling down.

DAQ

Real-time computer: k1???

Slot

Item

Assigned to

S/N

42

<blank>

41

<blank>

40

<blank>

39

<blank>

38

<blank>

37

<blank>

36

<blank>

35

<blank>

34

<blank>

33

<blank>

32

<blank>

31

<blank>

30

<blank>

29

<blank>

28

<blank>

27

<blank>

26

<blank>

25

<blank>

24

<blank>

23

<blank>

22

<blank>

21

<blank>

20

<blank>

19

<blank>

18

<blank>

17

<blank>

16

<blank>

15

<blank>

14

<blank>

13

<blank>

12

AI Chassis

DAC0

SN???

11

AA Chassis

ADC0

SN???

10

<blank>

9

I/O Chassis

SN???

8

<blank>

7

<blank>

6

<blank>

5

<blank>

4

<blank>

3

<blank>

2

<blank>

1

<blank>

0

<blank>

LCGT/subgroup/AOS/WideAngleBuffle (last edited 2018-07-18 15:17:37 by TomotadaAkutsu)