5729
Comment:
|
6266
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7588|Wide Angle Baffle assembly-procedure manual (Zeidler)]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4660|Calculations regarding the back-scattering of different Wide Angle Baffle designs (Zeidler)]] |
|
Line 47: | Line 49: |
||D||4 ohm|| Thermometer || I+ || Yellow || || | ||D||4 ohm|| Thermometer || I+ || Yellow || || ○ || |
Line 56: | Line 58: |
||N||Brank|| || || || || | ||N||Blank|| || || || || || |
Line 65: | Line 67: |
||Y||Brank|| || || || || || | ||Y||Blank|| || || || || || |
Line 81: | Line 83: |
||N||Brank|| || || || || | ||N||Blank|| || || || || || |
Line 90: | Line 92: |
||Y||Brank|| || || || || || | ||Y||Blank|| || || || || || |
Line 92: | Line 94: |
{{attachment:burndy_cryostat.png | Diagram|width="300" }} | |
Line 140: | Line 143: |
=== OpLev === * Optical lever installed at the +X/+Y side of the IYC * Path-length inside the chamber (viewport to viewport): ~3000 mm |
Wide Angle Baffle Cooling Test 2018
|
|
|
Links to knowledge
Calculations regarding the back-scattering of different Wide Angle Baffle designs (Zeidler)
Heat links positions (by Obuchi) fmkopgehpapgdkcc.png
Task list
Note: some of the tasks can be done in parallel.
- Place/install the WAB suspension.
- Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
- What....?
Test the saving mode of the WAB suspension.
Don't forget to replace the damping magnets to SmCo ones.
- What is the requirement to say the damping is sufficient...?
- Connect electric cables (with checking) in the IYC chamber.
3 photosensors; in each photosensor head, two PDs should be connected parallel. Need to calibrate the response of each sensor head...
- 2 heaters; should be connected parallel??
- 1 coil for actuation.
6 thermometers with (extended?) patch cables made of phospher bronze; the extended double twisted pare cables will be delivered on Jan 26
- Connect 4 heat links.
- Check oplev signals.
- Connect cables the outside as well.
- Make a realtime model to monitor.
- Take interface with Tcam.
- Make a plan to do leak check before cooling down.
- Don't forget to add some heat links (Cu?) to the top of the suspension...
PIN Assign
- Summary of the pin assign of burndy connector inside the cryostat.
NOTE: The meaning of color for thermometer cable is
RED = I- , YELLOW = I+ , GREEN = V- , BLACK = V+
P22
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |
A |
75 ohm |
Thermometer |
V- |
Green |
Cryocon CH A |
○ |
B |
75 ohm |
Thermometer |
V+ |
Black |
|
○ |
C |
4 ohm |
Thermometer |
I- |
Red |
|
○ |
D |
4 ohm |
Thermometer |
I+ |
Yellow |
|
○ |
E |
75 ohm |
Thermometer |
V- |
Green |
Cryocon CH B |
○ |
F |
75 ohm |
Thermometer |
V+ |
Black |
|
○ |
G |
4 ohm |
Thermometer |
I- |
Red |
|
○ |
H |
4 ohm |
Thermometer |
I+ |
Yellow |
|
○ |
J |
75 ohm |
Thermometer |
V- |
Green |
Cryocon CH C |
○ |
K |
75 ohm |
Thermometer |
V+ |
Black |
|
○ |
L |
4 ohm |
Thermometer |
I- |
Red |
|
○ |
M |
4 ohm |
Thermometer |
I+ |
Yellow |
|
○ |
N |
Blank |
|
|
|
|
|
P |
75 ohm |
Thermometer |
V- |
Green |
Cryocon CH D |
○ |
R |
75 ohm |
Thermometer |
V+ |
Black |
|
○ |
S |
4 ohm |
Thermometer |
I- |
Red |
|
○ |
T |
4 ohm |
Thermometer |
I+ |
Yellow |
|
○ |
U |
75 ohm |
Thermometer |
V- |
Green |
Cryocon CH E |
○ |
V |
75 ohm |
Thermometer |
V+ |
Black |
|
○ |
W |
4 ohm |
Thermometer |
I- |
Red |
|
○ |
X |
4 ohm |
Thermometer |
I+ |
Yellow |
|
○ |
Y |
Blank |
|
|
|
|
|
P23
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |
A |
75 ohm |
Thermometer |
V- |
Green |
Cryocon CH F |
× |
B |
75 ohm |
Thermometer |
V+ |
Black |
|
× |
C |
4 ohm |
Thermometer |
I- |
Red |
|
× |
D |
4 ohm |
Thermometer |
I+ |
Yellow |
|
× |
E |
75 ohm |
PS PD |
V- |
|
|
× |
F |
75 ohm |
PS PD |
V+ |
|
|
× |
G |
4 ohm |
PS LED |
I- |
|
|
× |
H |
4 ohm |
PS LED |
I+ |
|
|
× |
J |
75 ohm |
PS PD |
V- |
|
|
× |
K |
75 ohm |
PS PD |
V+ |
|
|
× |
L |
4 ohm |
PS LED |
I- |
|
|
× |
M |
4 ohm |
PS LED |
I+ |
|
|
× |
N |
Blank |
|
|
|
|
|
P |
75 ohm |
PS PD |
V- |
|
|
× |
R |
75 ohm |
PS PD |
V+ |
|
|
× |
S |
4 ohm |
PS LED |
I- |
|
|
× |
T |
4 ohm |
PS LED |
I+ |
|
|
× |
U |
75 ohm |
CM Act. |
I- |
|
|
× |
V |
75 ohm |
CM Act. |
I+ |
|
|
× |
W |
4 ohm |
Heater |
I- |
|
|
○ |
X |
4 ohm |
Heater |
I+ |
|
|
○ |
Y |
Blank |
|
|
|
|
|
DAQ
Real-time computer: k1???
Slot |
Item |
Assigned to |
S/N |
42 |
<blank> |
|
|
41 |
<blank> |
|
|
40 |
<blank> |
|
|
39 |
<blank> |
|
|
38 |
<blank> |
|
|
37 |
<blank> |
|
|
36 |
<blank> |
|
|
35 |
<blank> |
|
|
34 |
<blank> |
|
|
33 |
<blank> |
|
|
32 |
<blank> |
|
|
31 |
<blank> |
|
|
30 |
<blank> |
|
|
29 |
<blank> |
|
|
28 |
<blank> |
|
|
27 |
<blank> |
|
|
26 |
<blank> |
|
|
25 |
<blank> |
|
|
24 |
<blank> |
|
|
23 |
<blank> |
|
|
22 |
<blank> |
|
|
21 |
<blank> |
|
|
20 |
<blank> |
|
|
19 |
<blank> |
|
|
18 |
<blank> |
|
|
17 |
<blank> |
|
|
16 |
<blank> |
|
|
15 |
<blank> |
|
|
14 |
<blank> |
|
|
13 |
<blank> |
|
|
12 |
AI Chassis |
DAC0 |
SN??? |
11 |
AA Chassis |
ADC0 |
SN??? |
10 |
<blank> |
|
|
9 |
I/O Chassis |
|
SN??? |
8 |
<blank> |
|
|
7 |
<blank> |
|
|
6 |
<blank> |
|
|
5 |
<blank> |
|
|
4 |
<blank> |
|
|
3 |
<blank> |
|
|
2 |
<blank> |
|
|
1 |
<blank> |
|
|
0 |
<blank> |
|
|
OpLev
- Optical lever installed at the +X/+Y side of the IYC
- Path-length inside the chamber (viewport to viewport): ~3000 mm