29166
Comment:
|
33479
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
=== ISC Bi-Weekly Meeting 2018 October 22 === * Zoom meeting: * Main topics: * [[KAGRA/subgroup/ifo/MIF/Minutes20181022|Agenda]] === ISC Bi-Weekly Meeting 2018 October 22 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: * [[KAGRA/subgroup/ifo/MIF/Minutes20181022|Agenda]] === ISC Bi-Weekly Meeting 2018 September 10 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: Electronics, ITMY inhomogeneity * [[KAGRA/subgroup/ifo/MIF/Minutes20180910|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 August 27 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: ALS configuration * [[KAGRA/subgroup/ifo/MIF/Minutes20180827|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 July 30 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: RF PD for green, common mode servo board * [[KAGRA/subgroup/ifo/MIF/Minutes20180730|Minutes]] === ISC Bi-Weekly Meeting 2018 July 2 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: Low Noise VCO, ALS configuration * [[KAGRA/subgroup/ifo/MIF/Minutes20180702|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 June 18 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: towards phase-2, ALS configuration * [[KAGRA/subgroup/ifo/MIF/Minutes20180618|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 May 22 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: O3 configuration, Phase 1 summary * [[KAGRA/subgroup/ifo/MIF/Minutes20180522|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 May 7 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: O3 configuration, Phase 1 summary * [[KAGRA/subgroup/ifo/MIF/Minutes20180507|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 April 9 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: O3 configuration * [[KAGRA/subgroup/ifo/MIF/Minutes20180409|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 March 26 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: Site report * [[KAGRA/subgroup/ifo/MIF/Minutes20180326|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 March 12 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: RF AM generation, ALS configuration * [[KAGRA/subgroup/ifo/MIF/Minutes20180312|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 January 29 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: RF AM generation, ALS configuration * [[KAGRA/subgroup/ifo/MIF/Minutes20180129|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2018 January 15 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: RF AM generation * [[KAGRA/subgroup/ifo/MIF/Minutes20180115|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2017 November 6 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: SRM reflectivity * [[KAGRA/subgroup/ifo/MIF/Minutes20171120|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2017 November 6 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: SRM reflectivity * [[KAGRA/subgroup/ifo/MIF/Minutes20171106|Agenda and Minues]] === ISC Bi-Weekly Meeting 2017 October 23 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: SRM reflectivity, RF AM generation * [[KAGRA/subgroup/ifo/MIF/Minutes20171023|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2017 September 25 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: SRM reflectivity * [[KAGRA/subgroup/ifo/MIF/Minutes20170925|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2017 September 11 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: SRM reflectivity, bKAGRA Phase 2 schedule * [[KAGRA/subgroup/ifo/MIF/Minutes20170911|Agenda and Minutes]] === ISC Bi-Weekly Meeting 2017 July 31 === * eZuce meeting: "KAGRA ISC Meeting" in the KEK community. * Main topics: KAGRA sensitivity * [[KAGRA/subgroup/ifo/MIF/Minutes20170731|Agenda and Minutes]] |
|
Line 5: | Line 104: |
* Main topics: * [[KAGRA/subgroup/ifo/MIF/Minutes20170703|Agenda]] |
* Main topics: OMC suspension, DC QPD holder, bKAGRA sensitivity * [[KAGRA/subgroup/ifo/MIF/Minutes20170703|Agenda and Minutes]] |
Meetings
ISC Bi-Weekly Meeting 2018 October 22
- Zoom meeting:
- Main topics:
ISC Bi-Weekly Meeting 2018 October 22
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics:
ISC Bi-Weekly Meeting 2018 September 10
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: Electronics, ITMY inhomogeneity
ISC Bi-Weekly Meeting 2018 August 27
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: ALS configuration
ISC Bi-Weekly Meeting 2018 July 30
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: RF PD for green, common mode servo board
ISC Bi-Weekly Meeting 2018 July 2
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: Low Noise VCO, ALS configuration
ISC Bi-Weekly Meeting 2018 June 18
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: towards phase-2, ALS configuration
ISC Bi-Weekly Meeting 2018 May 22
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: O3 configuration, Phase 1 summary
ISC Bi-Weekly Meeting 2018 May 7
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: O3 configuration, Phase 1 summary
ISC Bi-Weekly Meeting 2018 April 9
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: O3 configuration
ISC Bi-Weekly Meeting 2018 March 26
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: Site report
ISC Bi-Weekly Meeting 2018 March 12
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: RF AM generation, ALS configuration
ISC Bi-Weekly Meeting 2018 January 29
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: RF AM generation, ALS configuration
ISC Bi-Weekly Meeting 2018 January 15
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: RF AM generation
ISC Bi-Weekly Meeting 2017 November 6
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: SRM reflectivity
ISC Bi-Weekly Meeting 2017 November 6
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: SRM reflectivity
ISC Bi-Weekly Meeting 2017 October 23
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: SRM reflectivity, RF AM generation
ISC Bi-Weekly Meeting 2017 September 25
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: SRM reflectivity
ISC Bi-Weekly Meeting 2017 September 11
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: SRM reflectivity, bKAGRA Phase 2 schedule
ISC Bi-Weekly Meeting 2017 July 31
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: KAGRA sensitivity
ISC Bi-Weekly Meeting 2017 July 3
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: OMC suspension, DC QPD holder, bKAGRA sensitivity
ISC Bi-Weekly Meeting 2017 June 19
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: bKAGRA Phase 1 schedule update, IR/green mirrors
ISC Bi-Weekly Meeting 2017 June 5
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: PSL EOM layout
ISC Bi-Weekly Meeting 2017 April 10
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: actuator noise, RF doubler
ISC Bi-Weekly Meeting 2017 March 27
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: actuator noise
ISC Bi-Weekly Meeting 2017 March 13
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: recent activities, actuator noise
ISC Bi-Weekly Meeting 2017 February 13
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: recent activities, optical tables
ISC Bi-Weekly Meeting 2016 December 12
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: electronics
ISC Bi-Weekly Meeting 2016 November 14
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: optical tables, general updates
ISC Bi-Weekly Meeting 2016 November 2
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: bKAGRA Phase 1 electronics, general updates
ISC Bi-Weekly Meeting 2016 October 17
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
Main topics: bKAGRA Phase 1 commissioning, ALS NoiseBudget, Type-A simulation
ISC Bi-Weekly Meeting 2016 September 20
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: bKAGRA Phase 1 commissioning
ISC Bi-Weekly Meeting 2016 September 5
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: ALS sideband frequency, sapphire aperture
ISC Bi-Weekly Meeting 2016 August 22
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
Main topics: bKAGRA phase 1 g-factor, electronics, IMC sideband frequency, ALS NoiseBudget
ISC Bi-Weekly Meeting 2016 August 8
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
Main topics: bKAGRA phase 1 ASC, IMC sideband frequency, ALS NoiseBudget
ALS Meeting 2016 July 28
- eZuce meeting: "KAGRA ALS Meeting" in the KEK community.
- Main topics: decide ALS configuration
ISC Bi-Weekly Meeting 2016 July 25
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: bKAGRA Phase 1 ASC, commissioning, electronics
ISC Bi-Weekly Meeting 2016 June 27
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: bKAGRA Phase 1 design, commissioning, electronics
ISC Bi-Weekly Meeting 2016 June 13
- eZuce meeting: "KAGRA ISC Meeting" in the KEK community.
- Main topics: membership, bKAGRA Phase 1 optical configuration and commissioning
ISC Bi-Weekly Meeting 2016 May 16
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
ISC Bi-Weekly Meeting 2016 May 2
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
ISC Bi-Weekly Meeting 2016 April. 18
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
ISC Bi-Weekly Meeting 2016 Jan. 25
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
ISC Bi-Weekly Meeting 2016 Jan. 12
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
ISC Bi-Weekly Meeting 2015 Dec. 14
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
Agenda
- Requests for coating requirements from LMA (Aso)
- SRM HR transmission
- Old: 15.36% +/-0.1%
- New: 15%+/-1%
- The linear range of the SRCL signal is fine with this relaxed error range.
- The WFS shot noise change only about 5% with the above error.
Somiya-san will check the effect on the sensitivity -> Status
- SRM HR transmission
- Electronics Preparation Status (Michimura, Aso)
- Cable (Michimura)
Need to check if RF flexible cables are included -> Status
- RF distribution (Komori, Michimura)
- RFPD/QPD (Aso, Doi)
- Diff-to-Single converter (Michimura)
- Site installation work schedule
- Cable (Michimura)
- Magnet Noise (Michimura)
What was the reason for choosing 2mm dia, 3mm long SmCo ?
- OMC (Somiya)
- FFT Simulation (Hirose, H. Yamamoto)
ISC Bi-Weekly Meeting 2015 Nov. 30
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
Agenda
- Requests for coating requirements from LMA (Aso)
- Electronics Preparation Status (Michimura, Aso)
- Cable (Michimura)
- RF distribution (Komori, Michimura)
- RFPD/QPD (Aso, Doi)
- Diff-to-Single converter
- Magnet Noise (Michimura)
- OMC (Somiya)
- FFT Simulation (Hirose, H. Yamamoto)
VIS+ISC Meeting on BS Magnets 2015 Nov. 4
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "Special VIS+ISC Meeting" in the KEK community.
ISC Bi-Weekly Meeting 2015 Nov. 2
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
Agenda
- Electronics Preparation Status (Michimura, Aso)
- Cable (Michimura)
- RF distribution (Komori, Michimura)
- RFPD/QPD (Aso, Doi)
- Magnet Noise (Michimura)
- OMC (Somiya)
- FFT Simulation (Hirose, H. Yamamoto)
ISC Bi-Weekly Meeting 2015 Oct. 19
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
Agenda
- Confirmation of the electronics preparation status (Michimura)
- Commissioning schedule (Aso)
- Updates on the simulation (Hirose) and output optics design (Somiya)
ISC Bi-Weekly Meeting 2015 Oct. 5
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
Agenda
- Confirmation of the electronics preparation status (Michimura)
- Commissioning schedule (Aso)
- Updates on the simulation (Hirose) and output optics design (Somiya)
ISC Bi-Weekly Meeting 2015 Setp 7
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the KEK community.
Agenda
Electronics readiness status for iKAGRA slide
- Output Optics Layout
- Optical simulation updates
ISC Bi-Weekly Meeting 2015 Aug 24
SeeVogh and Kamioka TV conference room
SeeVogh meeting: "KAGRA ISC Meeting" in the Virgo-LSC community.
Agenda
- Output Optics Layout
- Optical Simulation
- Task Assignment
ISC Bi-Weekly Meeting 2015 Aug 10
Agenda
- Task assignment
- Output optics overall design
- bKAGRA roadmap
ISC Bi-Weekly Meeting 2015 July 27
Agenda
- Review the task list again
- Confirmation of available man power
- Task assignment
Title: KAGRA ISC
Community: Virgo - LSC
Password: cryogenic
Meeting type: Open Meeting (Round Table)
Meeting Access Information:
SeeVoghRN Application http://research.seevogh.com/joinSRN?meeting=MDMaM82M2iDDDu929tD99D
Mobile App : Meeting ID: 733 1215 or Link: http://research.seevogh.com/join?meeting=MDMaM82M2iDDDu929tD99D
ISC Bi-Weekly Meeting 2015 July 13
2015/7/13 (Mon) 14:00 - 15:00
SeeVogh
Agenda
Update the task list
ISC Meeting 2015 Mar 13
2015/3/13 (Fri) 13:00 - 15:00
SeeVogh
Agenda
Progress report on the simulation of the inhomogeneous sapphire substrate with RF SB (Hirose) Slides
Output optics configuration discussion (Somiya, Aso) Slides
IMC DC QPD requirements (Michimura) Slides
- AOB
SeeVogh Info
Title: KAGRA ISC
Start 2015-03-13 12:30 End 2015-03-13 15:30
Community: Virgo - LSC
Meeting type: Open Meeting (Round Table) Meeting
Access Information:
SeeVoghRN Application http://research.seevogh.com/joinSRN?meeting=vsvivIeleIIiIvaiaDItas
WebStart (Java) http://research.seevogh.com/join?meeting=vsvivIeleIIiIvaiaDItas
Mobile App : Meeting ID: 724 6603 or Link: http://research.seevogh.com/join?meeting=vsvivIeleIIiIvaiaDItas
MIF & MIR bKAGRA1 Configuration Meeting 2015 Feb 26
2015/2/26 (Thu) 15:00 - 17:00
SeeVogh
Agenda
SeeVogh Info
Title: bKAGRA1 configuration
Start 2015-02-26 14:30 End 2015-02-26 17:30
Community: Virgo - LSC
Meeting type: Open Meeting (Round Table) Meeting
Access Information:
SeeVoghRN Application http://research.seevogh.com/joinSRN?meeting=MsMiMI2l2IDsD99B9vDt9s
WebStart (Java) http://research.seevogh.com/join?meeting=MsMiMI2l2IDsD99B9vDt9s
Mobile App : Meeting ID: 723 3441 or Link: http://research.seevogh.com/join?meeting=MsMiMI2l2IDsD99B9vDt9s
MIF Meeting 2013 July 22
2013/7/22 (Mon) 10:00 - 12:00
University of Tokyo, Hongo Campus, Science Building #1 room 445
SeeVogh
Agenda
Updates 資料
Beam Shutter 資料
Suspension model with local damping 資料
- Requirements for in-air optical table mountings .
SeeVogh Info
Title: KAGRA MIF
Description:
Community: Virgo - LSC
Password: 共通
Meeting Access Information:
- - Meeting URL
SeeVogh R.N. http://research.seevogh.com/join?meeting=MMMeMn292uDaDn9298D29M
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MMMeMn292uDaDn9298D29M
- - Japan Standard Time (+0900)
- Start 2013-07-22 09:30 End 2013-07-22 13:00
MIF Meeting 2013 Feb 26
2013/2/26 (Tue) 10:00 - 12:00
SeeVogh
Agenda
- Updates
- FSS design
- De-scoping discussion
Home work report from Nakano-kun資料
SeeVogh Info
Title: KAGRA MIF
Description:
Community: Virgo - LSC
Password: 共通
Meeting Access Information:
- - Meeting URL
SeeVogh R.N. http://research.seevogh.com/join?meeting=MaMDMt2v2sDMDn999nDI9a
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MaMDMt2v2sDMDn999nDI9a
- - Japan Standard Time (+0900)
- Start 2013-02-26 09:30 End 2013-02-26 13:00
MIF Meeting 2013 Feb 8
2013/2/8 (Fri) 13:00 - 15:00
SeeVogh
Agenda
- Updates
Servo model strategy (Aso) 資料
- Measurement Instruments
- Next meeting
SeeVogh Info
Title: KAGRA MIF
Description:
Community: Virgo - LSC
Password: 共通
Meeting Access Information:
- - Meeting URL
SeeVogh R.N. http://research.seevogh.com/join?meeting=MvM2Ml2a2uDvDI9e9tDe9v
EVO International http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MvM2Ml2a2uDvDI9e9tDe9v
- - Phone Bridge
ID: 611 9094
Password: 6508
Japan Standard Time (+0900)
Start 2013-2-8 12:30
End 2013-2-8 17:00
MIF Meeting 2012 Nov 15
2012/11/15 (Thu) 10:00 - 11:00
EVO
Agenda
- Status Reports
R&D, who to do, where to do ? 資料
EVO Info
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 611 9094
Password: 6508
Japan Standard Time (+0900)
Start 2012-11-15 9:30
End 2012-11-15 12:30
MIF Meeting 2012 Oct 23
2012/10/23 (Tue) 13:30 - 14:30
EVO
Agenda
- Status Reports
EVO Info
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 601 9206
Password: 6508
Japan Standard Time (+0900)
Start 2012-10-23 13:00
End 2012-10-23 15:30
MIF Meeting 2012 Oct 9
2012/10/9 (Tue) 13:30 - 14:30
EVO
Agenda
- Status Reports
EVO Info
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 594 4336
Password: 6508
Japan Standard Time (+0900)
Start 2012-10-09 13:00
End 2012-09-25 16:00
MIF Meeting 2012 Sep 25
2012/9/25 (Tue) 13:30 - 14:30
EVO
Agenda
- Status Reports
FSS Conceptual Design 資料
EVO情報
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 587 1199
Password: 6508
Japan Standard Time (+0900)
Start 2012-09-25 13:00
End 2012-09-25 16:00
MIF Meeting 2012 Sep 14
2012/9/14 (Tue) 15:00 - 16:00
EVO
Agenda
- Status Reports
Re-scoping of iKAGRA 資料
EVO情報
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 582 9631
Password: 6508
Japan Standard Time (+0900)
Start 2012-09-14 14:30
End 2012-09-14 17:00
Small Suspension Meeting 2012 Aug 21
2012/8/21 (Tue) 13:30 - 14:30
柏キャンパス 第2総合研究棟セミナー室
EVO
Agenda
- Discuss strategies
EVO情報
Title: KAGRA Small Suspension
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 570 6499
Password: 6508
Japan Standard Time (+0900)
Start 2012-08-21 13:00
End 2012-08-21 16:00
MIF Meeting 2012 Aug 7
2012/8/7 (Tue) 13:30 - 14:30
EVO
Agenda
EVO情報
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID:565 1342
Password: 6508
Japan Standard Time (+0900)
Start 2012-07-17 13:00
End 2012-07-17 16:00
MIF Meeting 2012 July 17
2012/7/17 (Tue) 15:30 - 16:30
EVO
Agenda
EVO情報
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 557 9149
Password: 6508
Japan Standard Time (+0900)
Start 2012-07-17 15:00
End 2012-07-17 17:30
MIF Meeting 2012 July
2012/7/3 (Tue) 13:30 -
EVO and 本郷(理1号館604)
全体の資料 aLIGO参照球関連の資料 WFS資料 System Diagram
Agenda
- MIFパラメータ決定について
FSS&Green Lock (Tatsumi)
Fiber induced noise (Michimura???, Aso,Arai,Ando) --> 1 Hz/sqrt(Hz) は達成可能と思われる。
Response from cavity displacements to transmitted light frequency: Izumi's report
Ref Cav と PMC の順番問題: Kawamura's report
Modeling of the laser source and the reference cavity: 資料
- BS ROC
- 今後
EVO情報
Title: KAGRA MIF
Description:
Community: Universe
Password: 共通
Meeting Access Information:
- Meeting URL
- Password: 共通
- Phone Bridge
ID: 551 9929
Password: 6508
Japan Standard Time (+0900)
Start 2012-07-03 13:00
End 2012-07-03 17:00
MIF Meeting 2012 Jan
2012/1/19 (Thu) 10:00 - 12:00
EVO and 本郷(理1号館604)
Agenda
PI計算(柴田) 資料
ASC復習(道村) LCGT_ASC_20120119_michimura.pdf
- g-factor決定(?)
- 空間モード(宗宮)
Green Lock 資料
- レビュー関連
- 今後
EVO情報
Title: LCGT MIF Description: Community: Universe
Meeting Access Information: - Meeting URL
- Password: cryogenic - Phone Bridge
- ID: 455 7650 Password: 6508
MIF&Suspension Meeting 2011 May
2011/5/18 (Wed) 13:00 - 15:00
EVO and 本郷(理1号館604)
EVO Info
Title: LCGT MIF + VIS
Community: Universe
Meeting Access Information:<<BR>>
- - Meeting URL - Phone Bridge
- ID: 337 7941
Japan Standard Time (+0900)
Start 2011-05-18 12:30
End 2011-05-18 17:00
Agenda
ASC report from Michimura LCGT_ASC_status20110517_michimura.pdf
Suspension design payload_dimension_110517.pdf
- Pitch, Yaw resonant frequencies
Actuator actuator_110518.pdf
- g-factor
PRC Folding Design(http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=411)
MIF Meeting 2011 April
2011/4/12 10:00 - 12:00
EVO and 本郷604号室
EVO Info
Title: LCGT MIF
Community: Universe
Meeting Access Information:
- Meeting URL
- Phone Bridge
- ID: 321 5863
- Japan Standard Time (+0900)
- Start 2011-04-12 09:30
- End 2011-04-12 13:00
Agenda
External Review Comments review-comments-2011-4-12.pdf
- How to proceed with the following issues ?
Arm Cavity g-factor g-factor2011-4-12.pdf
Folding Design(http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=411)
- ASC
- Green Lock
MIF Meeting 2011 Feb. (III)
2011/2/23 13:00 -
EVO and 本郷604号室
EVO Info
Title: LCGT MIF
Community: Universe
- Meeting URL
- Phone Bridge
- ID: 297 3773
- Japan Standard Time (+0900)
- Start 2011-02-23 12:30
- End 2011-02-23 16:00
Agenda
- Folding design (PR3 ROC error)
- Task Assignment
MIF Meeting 2011 Feb. (II)
2011/2/16 13:00 -
EVO and 本郷604号室
Agenda
Modulation Frequency Slide, SomiyaReport1
SRCL non-linearity Slide
Dynamic Range 20110209_IFO_DynamicRange.pdf
SRC Folding 20110216_folding_chen.pdf, SomiyaReport2
g-factor Slide
MIF Meeting 2011 Feb. (I)
2011/2/9 13:00 -
EVO and 本郷604号室
Agenda
SRC Folding, Yes or No ? (Nishida, Chen)20110209.pdf
- Decide on the Arm cavity g-factor (Aso)
Dynamic range20110209_IFO_DynamicRange.pdf (Miyakawa)
- AM-PM or PM-PM, detune method, MZ (Somiya)
- f1 frequency. Is 11.25MHz really OK ? (Aso)
- New and old Optickle codes
ASC status MIFmeeting20110209michimura.pdf (Michimura)
2011_0209_agatsuma.pdf(Agatsuma)
- Green lock design
- Mirror specs
- OMC design
- SVN usage
- Task assignment
Spatial Mode Telecon
2010/8/5 13:00 - 本郷414号室 & EVO
- 麻生資料
タスクリスト、スケジュール、予算 IFODesignPlan.pdf
The first telecon
- 2009/5/14 13:00-15:00 Skype会議
- 国立天文台 第三会議室 (担当: 新井)
- 東大新領域(柏) 場所TBD (担当: 大前)
- 神岡 (宮川)
- 坪野研 (高橋)
- 川村
- NICT長野
- Caltech 山本
会議資料(麻生) Meeting-2009-05-14.pdf
会議資料(佐藤) lcgt_isc_20090514_sato.pdf