Differences between revisions 269 and 306 (spanning 37 versions)
Revision 269 as of 2018-01-25 09:07:27
Size: 7765
Comment:
Revision 306 as of 2018-02-20 09:06:31
Size: 8244
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/1/23 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180123.png||width=1200}}
2017/2/19 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180220.png||width=1200}}
Line 18: Line 18:

 * Pump down
  * 1/24 *木村、都丸、(牛場)、高橋 or 奥富、和泉、阿久津、宮本 + 未経験者数名(技術系の人)
Line 57: Line 54:
2017/1/25(Thur.) 2017/2/20(Tue.)
Line 59: Line 56:
 * Remote participants by educe: Miyoki, Akutsu  * Remote participants by eZuce: None
Line 62: Line 59:
  * Alignment and ETMY: *Izumi, Enomomoto, Ushiba, Elenola
   * ETMY Marionette yaw loop was measured and implemented.
   * BF seems to be touching again.
Line 63: Line 63:
  * Vacuum
   * 朝の時点で昨日少しだけ引いた真空度は変わっていなかったため、簡易リークチェックはOK。
   * ETMYを真空に引きはじめた。
   * 真空度がMEDM上で見えないので、ビデオカメラを設置した。

  * Alignment
   * Yaw方向に数100uradのオーダーで動いている。
   
  * AEL: k1iy0への電源ケーブルを張った。
 * BS: Kozu
  * Measured the TF of TM and IM coupling.
Line 75: Line 68:
  * Vacuum
   * Turbo pumpを入れる予定。
  * ETMY: Enomomoto, Izumi
   * Damping tuning
Line 78: Line 71:
  * AEL: awai, tamori, hayakawa, nakada, yamamoto

 * Laser hazard: Upstream of IMMT line
 * Laser hazard: Upstream SR2-3 line.
Line 83: Line 74:
  * Week of 1/22
   * 1/24: Pump down.
   * 1/25: Turbo pump on.
  * Week of 2/19
   * ETMY tuninng.
Line 87: Line 77:
  * Week of 1/29
   * 1/29,30 leak check.
  * Week of 2/26
   * Beam alignment to REFL port.
Line 90: Line 80:
  * Week of 2/5
   * 2/5 Cooling start.
  * week of 3/5
   * IYC door will be closed.
Line 93: Line 83:
  * week of 3/12
   * Connecting ducts at corner.
Line 95: Line 87:
  * Network cableの整理
  * ピコモーターの反応がなくなる。
  * BF of ETMY seems to be touching again.
Line 108: Line 99:
||19||2018/2/20||[[KAGRA/Commissioning/Weekly/20180220/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180220.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180220/Minute|Minute]]|| ||
||18||2018/2/13||[[KAGRA/Commissioning/Weekly/20180213/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180213.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180213/Minute|Minute]]|| ||
||17||2018/2/6||[[KAGRA/Commissioning/Weekly/20180206/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180206.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180206/Minute|Minute]]|| ||
||16||2018/1/30||[[KAGRA/Commissioning/Weekly/20180130/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180130.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180130/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/2/19 updated KAGRA/Commissioning/Commissioning_schedule_20180220.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Izumi



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/2/20(Tue.)

  • Remote participants by eZuce: None
  • Report of work (*:responsible person)
    • Alignment and ETMY: *Izumi, Enomomoto, Ushiba, Elenola
      • ETMY Marionette yaw loop was measured and implemented.
      • BF seems to be touching again.
  • BS: Kozu
    • Measured the TF of TM and IM coupling.
  • Work plan (*:responsible person)
    • ETMY: Enomomoto, Izumi
      • Damping tuning
  • Laser hazard: Upstream SR2-3 line.
  • Weekly
    • Week of 2/19
      • ETMY tuninng.
    • Week of 2/26
      • Beam alignment to REFL port.
    • week of 3/5
      • IYC door will be closed.
    • week of 3/12
      • Connecting ducts at corner.
  • Issues
    • BF of ETMY seems to be touching again.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1