Differences between revisions 272 and 314 (spanning 42 versions)
Revision 272 as of 2018-01-29 08:58:12
Size: 7535
Comment:
Revision 314 as of 2018-02-26 09:14:52
Size: 9179
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/1/23 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180123.png||width=1200}}
2017/2/19 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180220.png||width=1200}}
Line 20: Line 20:
  * *Izumi   * *Enomoto
Line 54: Line 54:
2017/1/29(Mon.) 2017/2/26(Mon.)
Line 56: Line 56:
 * Remote participants by eZuce: None  * Remote participants by eZuce: Miyoki
Line 59: Line 59:
  * Alignment and ETMY: *Enomoto
   * Photo sensor noise was improved on Thursday and checked on Friday. We confirmed the noise becomes better.
   * Sampling model of RT model was changed from 16kHz to 2kHz to reduce 10min period glitch.
Line 60: Line 63:
  * Alignment
   * Yaw方向のジャンプは無くなった。Oplevの線形範囲程度(+/-数百mrad)でドリフトがあるもようだが、範囲は狭まって来ている。
  * Camera: Inoue, Haino, Yokozawa, Cory, Binhua
   * ETMY Camera was broken by taking too many photos. Camera will be replaced.
   * ITMY camera is being set to look at BS.
   * BS PD will be replaced by Yokozawa.

  * IOO: Kitazawa, kokeyama
   * IO chassis will be replaced and being prepared.

  * CRY: mirror temperature ~110K.
   * The satellite amplifier has an oscillation for photo sensors at low temperature. Satellite amplifiers which will be used for photo sensors at low temperature should be modified.
Line 64: Line 76:
  * Vacuum: leak check
  * Alignment: Oplevのセンタリング。
  * ETMY: Enomomoto, Ushiba
   * Check the glitch with the 2kHz model.
   * Original REFL port will be tested to pick up Mich signal.
Line 67: Line 80:

* Laser hazard: Upstream of IMMT line
 * Laser hazard: AM: PSL, PM: Upstream SR2-3 line, and Y-end.
Line 71: Line 83:
  * Week of 2/26
   * ETMY tuninng.
   * Beam alignment to REFL port.
   * 2/28: Height change for PRs
Line 72: Line 88:
  * Week of 1/29
   * 1/29,30 leak check.
   * 1/30 Opening ETMY gate valve.
  * week of 3/5
   * IYC door will be closed.
   * Exchanging items and cleaning inside the PR2 chamber
Line 76: Line 92:
  * Week of 2/5
   * 2/5 Cooling start.
  * week of 3/12
   * TMS installation at ETMY.
   * Connecting ducts at the corner area.

  * week of 3/19
   * Vacuum test at at the corner area.
   * TMS alignment using green light at ETMY.
Line 81: Line 102:
  * Network cableの整理
  * ピコモーターの反応がなくなる。
   * DAC output has sometimes zero voltage for 100ms~1s. IO chassis will be replaced.
Line 94: Line 114:
||19||2018/2/20||[[KAGRA/Commissioning/Weekly/20180220/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180220.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180220/Minute|Minute]]|| ||
||18||2018/2/13||[[KAGRA/Commissioning/Weekly/20180213/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180213.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180213/Minute|Minute]]|| ||
||17||2018/2/6||[[KAGRA/Commissioning/Weekly/20180206/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180206.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180206/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/2/19 updated KAGRA/Commissioning/Commissioning_schedule_20180220.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Enomoto



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/2/26(Mon.)

  • Remote participants by eZuce: Miyoki
  • Report of work (*:responsible person)
    • Alignment and ETMY: *Enomoto
      • Photo sensor noise was improved on Thursday and checked on Friday. We confirmed the noise becomes better.
      • Sampling model of RT model was changed from 16kHz to 2kHz to reduce 10min period glitch.
    • Camera: Inoue, Haino, Yokozawa, Cory, Binhua
      • ETMY Camera was broken by taking too many photos. Camera will be replaced.
      • ITMY camera is being set to look at BS.
      • BS PD will be replaced by Yokozawa.
    • IOO: Kitazawa, kokeyama
      • IO chassis will be replaced and being prepared.
    • CRY: mirror temperature ~110K.
      • The satellite amplifier has an oscillation for photo sensors at low temperature. Satellite amplifiers which will be used for photo sensors at low temperature should be modified.
  • Work plan (*:responsible person)
    • ETMY: Enomomoto, Ushiba
      • Check the glitch with the 2kHz model.
      • Original REFL port will be tested to pick up Mich signal.
  • Laser hazard: AM: PSL, PM: Upstream SR2-3 line, and Y-end.
  • Weekly
    • Week of 2/26
      • ETMY tuninng.
      • Beam alignment to REFL port.
      • 2/28: Height change for PRs
    • week of 3/5
      • IYC door will be closed.
      • Exchanging items and cleaning inside the PR2 chamber
    • week of 3/12
      • TMS installation at ETMY.
      • Connecting ducts at the corner area.
    • week of 3/19
      • Vacuum test at at the corner area.
      • TMS alignment using green light at ETMY.
  • Issues
    • DAC output has sometimes zero voltage for 100ms~1s. IO chassis will be replaced.

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

19

2018/2/20

Agenda

Schedule

Minute

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)