Differences between revisions 281 and 300 (spanning 19 versions)
Revision 281 as of 2018-02-01 09:20:45
Size: 9179
Comment:
Revision 300 as of 2018-02-15 09:23:22
Size: 8840
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/1/30 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180130.png||width=1200}}
2017/2/12 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180213.png||width=1200}}
Line 54: Line 54:
2017/2/1(Thur.) 2017/2/15(Thur.)
Line 59: Line 59:
  * Vacuum: *木村、上田、宍戸、高橋
   * Gage valveが空いた。真空度はざっくりArm:1e-6 Cryo:1e-4で、徐々に平衡状態になっている。
   * EYVの6本のピストンのうちの3本をリリースして防振系をフリーにしようとしたが、結局フリーにはならず、2mm下がって、0.5mm戻した。しばらくは現状のまま行く。来週もう一度トライ。。
  * ETMY: *Enomomoto
   * IP damping was established. Loop of LVDT to LVDT including DC works well.
   * Optimum of point IP can be moved. Needs check again.
Line 63: Line 63:
  * Alignment: 和泉、桐井、道村、奥富
   * Glitchの原因がどうやらLVDT関連の電気系である可能性が高まった。すくなくともメカ系ではなさそう。
    * LVDTのDACにオフセットを加えると現れる。
   * エンドでのビームはシャッターを開けたらすぐにETMYには届いたが、ゲートバルブが空いていなかったようで、バッフルPDに光が届かなかった。
    * BSにも光は返ってきた。
    * BSに光を返すとOplevで見てYawに線形領域を超えるくらいずれていた。
 * Alignment: *Izumi
  * Beam pointing to ETMY and BS was confirmed.
   * ETMY oplev moved more than 180urad, the reasons is not clear.
    * Somebody could hit the table of optical table.
    * Spot of ETMY by Tcam showed oplev spot moved a little.
   * Spot of "3" shape seems to be a reflection of something close.
Line 70: Line 70:
  * 機器制御のチェック: *麻生、日立造船
   * センター、各エンド64chが使えるようになった。
 * Green: *Michimura, Yokogawa, Sugimoto
  * Green has been aligned to ETMY.
   * Beam is hitting at PR2 with 10cm off from center.

  * WAB: * Akutsu, Miyo, Simon
   * Making Photo sensors. One of the sensor was connected to ADC.
   * Door will be closed in the week of 3/5.
   * Sensors will be left after cooling.
Line 75: Line 82:
  * Vacuum: *和泉、早河
   * ゲートバルブにまずgate valveを開け、その後今日の午前にEYVの6本の足のうちの3本をリリースして防振系をフリーにする。
  * CAL: *Inoue, Yokozawa, Haino
   * IYA will be opened to complete Tcam.
Line 78: Line 85:
  * IOO: *苔山
   * 今日一日光を使う。
  * ETMY: Enomomoto, Izumi
   * Oplev will be centered and beam will be checked again.
   * PR2 will be lowered by ~3mm.
Line 81: Line 89:
  * Alignment: *和泉
   * 午後にOplevの再センタリングをしたい。WABと時間調整。

  * WAB: *阿久津
   * 作業と重なるのでビームをできるだけ避けてほしい。アラインメントと時間調整。

  * Type B
   * Blade inspection.
   * Re-centering oplev.

 * Laser hazard: 現在PSL。今日は午後のある時点でアラインメントのためSR2-3ラインより奥に変更。アラインメント完了後、PSLに戻す。
 * Laser hazard: SR2-3.
Line 94: Line 92:
  * Week of 2/13
   * Waiting for cooling the mirror.
   * ETMY tuninng.
   * Green setup.
   * 2/16 Preparation for power down.
Line 95: Line 98:
  * Week of 1/29
   * 1/31-2/2 Re-checking main beam to ETMY
  * Week of 2/19
   * 2/19 Recovering for power down.
 * ETMY tuninng.
Line 98: Line 102:
  * Week of 2/5
   * 2/5 Cooling start.
  * Week of 2/26
   * Beam alignment to REFL port.
Line 101: Line 105:
  * week of 3/5
   * IYC door will be closed.
Line 103: Line 109:
  * Network cableの整理
  * EYVの足のリリースで防振系がフリーにはならない。
  * Leakが二箇所残っている。
Line 117: Line 121:
||18||2018/2/13||[[KAGRA/Commissioning/Weekly/20180213/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180213.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180213/Minute|Minute]]|| ||
||17||2018/2/6||[[KAGRA/Commissioning/Weekly/20180206/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180206.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180206/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/2/12 updated KAGRA/Commissioning/Commissioning_schedule_20180213.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Izumi



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/2/15(Thur.)

  • Remote participants by eZuce: None
  • Report of work (*:responsible person)
    • ETMY: *Enomomoto
      • IP damping was established. Loop of LVDT to LVDT including DC works well.
      • Optimum of point IP can be moved. Needs check again.
  • Alignment: *Izumi
    • Beam pointing to ETMY and BS was confirmed.
      • ETMY oplev moved more than 180urad, the reasons is not clear.
        • Somebody could hit the table of optical table.
        • Spot of ETMY by Tcam showed oplev spot moved a little.
      • Spot of "3" shape seems to be a reflection of something close.
  • Green: *Michimura, Yokogawa, Sugimoto
    • Green has been aligned to ETMY.
      • Beam is hitting at PR2 with 10cm off from center.
    • WAB: * Akutsu, Miyo, Simon
      • Making Photo sensors. One of the sensor was connected to ADC.
      • Door will be closed in the week of 3/5.
      • Sensors will be left after cooling.
  • Work plan (*:responsible person)
    • CAL: *Inoue, Yokozawa, Haino
      • IYA will be opened to complete Tcam.
    • ETMY: Enomomoto, Izumi
      • Oplev will be centered and beam will be checked again.
      • PR2 will be lowered by ~3mm.
  • Laser hazard: SR2-3.
  • Weekly
    • Week of 2/13
      • Waiting for cooling the mirror.
      • ETMY tuninng.
      • Green setup.
      • 2/16 Preparation for power down.
    • Week of 2/19
      • 2/19 Recovering for power down.
      • ETMY tuninng.
    • Week of 2/26
      • Beam alignment to REFL port.
    • week of 3/5
      • IYC door will be closed.
  • Issues

KAGRA/Commissioning/DailyWork
<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)