Differences between revisions 287 and 299 (spanning 12 versions)
Revision 287 as of 2018-02-06 09:29:37
Size: 8368
Comment:
Revision 299 as of 2018-02-14 09:31:45
Size: 8545
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
2017/2/5 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180206.png||width=1200}}
2017/2/12 updated
{{attachment:KAGRA/Commissioning/Commissioning_schedule_20180213.png||width=1200}}
Line 54: Line 54:
2017/2/6(Tue.) 2017/2/14(Wed.)
Line 56: Line 56:
 * Remote participants by eZuce: Takahashi  * Remote participants by eZuce: None
  * Enonomoto-kun started joining to commissioning. No one has to hesitate to join commissioning work!
Line 59: Line 60:
  * Alignment and Vibration Isolation: Izumi, Okutomi
   * BF yaw transfer function showed that it did not move well. It was fount that the position of IP was different from when pumping down started.
   * IP drifted 2mm in the air, and another 2mm when pump down. (Takahashi)
   * ETMY IPs were set back to where they were on 1/13. The transfer function now has the similar shape as before, but the Q of lowest peak is a bit low.
  * ETMY: *Enomomoto
   * Calibration at cryopayload was performed.
  * Cryo: mirror temperature: 220K.
  * Green reached ETMY
   * PR2 had 500urad misalignment.

Line 65: Line 69:
  * ETMY: Enomomoto, Izumi
   * Returning IR light will be checked around BS.
   * Leveler wil be removed in the more
Line 66: Line 73:
  * Alignment and Vibration Isolation: *Izumi
   * We can move moving masses of BF, or IPs of yaw to check TF can be recovered.
   * We will play one more day under vacuum.
  * Green reached ETMY
   * PR2 had 500urad misalignment.
Line 70: Line 76:
  * Type A: *Yokozawa
   * RT model of Type A will be separated into cryopayload and tower.
 
  * Type B
   * SR assembly continues.
Line 76: Line 77:
 * Laser hazard: PSL. Green might be used late of the afternoon, then the center area and Y end will be the hazard area.  * Laser hazard: IMM in the morning, SR2-3 in the afternoon.
Line 79: Line 80:
  * Week of 2/5
   * Finding causes of ETMY trouble.
    * Evacuation might be needed if ETMY is touching somewhere.
    * Cooling also will be delayed for 2weeks or so.
  * Week of 2/13
   * Waiting for cooling the mirror.
   * ETMY tuninng.
   * 2/16 Preparation for power down.
Line 84: Line 85:
  * Week of 2/19
   * 2/19 Recovering for power down.
   * ETMY tuninng.

  * Week of 2/26
   * Beam alignment to REFL port.
Line 86: Line 93:
  * IP drifted 2mm in the air, and another 2mm when pump down.   * AOS: Temperature inside clean booth is higher than outside area. One of the view port mirror brought from ITMY area into clean booth was dewed.
  * DGS: k1boot was cleaned up. No filter can be updated yesterday because of a missing file. If there is something wrong, please let DGS group know.
Line 98: Line 107:
||18||2018/2/13||[[KAGRA/Commissioning/Weekly/20180213/Agenda|Agenda]]||[[attachment:KAGRA/Commissioning/Schedule/Commissioning_schedule_20180213.xlsx|Schedule]]||[[KAGRA/Commissioning/Weekly/20180213/Minute|Minute]]|| ||

KAGRA Commissioning Wiki


Task list


Schedule

2017/2/12 updated KAGRA/Commissioning/Commissioning_schedule_20180213.png


Working people assignment

  • *: responsible person
  • Beam leading to REFP port
    • *Izumi



Meetings


Morning meeting

  • Date and time: Every weekday, 9AM
  • Location: Control room, or eZuce

2017/2/14(Wed.)

  • Remote participants by eZuce: None
    • Enonomoto-kun started joining to commissioning. No one has to hesitate to join commissioning work!
  • Report of work (*:responsible person)
    • ETMY: *Enomomoto
      • Calibration at cryopayload was performed.
    • Cryo: mirror temperature: 220K.
    • Green reached ETMY
      • PR2 had 500urad misalignment.
  • Work plan (*:responsible person)
    • ETMY: Enomomoto, Izumi
      • Returning IR light will be checked around BS.
      • Leveler wil be removed in the more
    • Green reached ETMY
      • PR2 had 500urad misalignment.
  • Laser hazard: IMM in the morning, SR2-3 in the afternoon.
  • Weekly
    • Week of 2/13
      • Waiting for cooling the mirror.
      • ETMY tuninng.
      • 2/16 Preparation for power down.
    • Week of 2/19
      • 2/19 Recovering for power down.
      • ETMY tuninng.
    • Week of 2/26
      • Beam alignment to REFL port.
  • Issues
    • AOS: Temperature inside clean booth is higher than outside area. One of the view port mirror brought from ITMY area into clean booth was dewed.
    • DGS: k1boot was cleaned up. No filter can be updated yesterday because of a missing file. If there is something wrong, please let DGS group know.

KAGRA/Commissioning/DailyWork
<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  


Weekly meeting

  • Date and time: Every Tuesday, 11AM
  • Location: Meeting room at Hokubukaikan, or eZuce, Polycom

No.

Date

Agenda

Schedule

Minute

Files

18

2018/2/13

Agenda

Schedule

Minute

17

2018/2/6

Agenda

Schedule

Minute

16

2018/1/30

Agenda

Schedule

Minute

15

2018/1/23

Agenda

Schedule

Minute

14

2018/1/16

Agenda

Schedule

Minute

13

2018/1/9

Agenda

Schedule

Minute

12

2017/12/19

Agenda

Schedule

Minute

11

2017/12/12

Agenda

Schedule

Minute

10

2017/11/28

Agenda

Schedule

Minute

9

2017/11/14

Agenda

Schedule

Minute

8

2017/11/7

Agenda

Schedule

Minute

7

2017/10/31

Agenda

Minute

G1707278-v4

6

2017/10/24

Agenda

Minute

G1707278-v3

5

2017/10/17

Agenda

Minute

G1707278-v2
G1707298
G1707300

4

2017/10/10

Minute

G1707278-v1

3

2017/10/3

Agenda

Minute

Commissioning plan for phase1

2

2017/9/26

Agenda

Minute

Commissioning plan for phase1

1

2017/9/19

Commissioning plan for phase1


Other meetings


Documents

Communication tools


for New members

KAGRA/Commissioning (last edited 2023-09-24 11:11:02 by miyoki)